{"id":"road-surface-treatment","version":"0.6.0","classification":{"uniformat":"G2010"},"names":["Road surface treatment"],"aliases":["LCB surface","tar and chip","chip seal"],"service_life":{"median_years":10,"range_years":[3,54],"range_basis":"source_spread"},"pm_tasks":[{"task":"Patrol Class 3 municipal roads to check for the conditions set out in the regulation (potholes, cracks, discontinuities, drop-offs)","frequency":"P1W","reference":"O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018","url":"https://www.ontario.ca/laws/regulation/020239","checklist":"s.3 Table Patrolling Frequency (Class 3 highways)"},{"task":"Patrol Class 4 municipal roads to check for the conditions set out in the regulation","frequency":"P2W","reference":"O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018","url":"https://www.ontario.ca/laws/regulation/020239","checklist":"s.3 Table Patrolling Frequency (Class 4 highways)"},{"task":"Patrol Class 5 municipal roads to check for the conditions set out in the regulation","frequency":"P30D","reference":"O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018","url":"https://www.ontario.ca/laws/regulation/020239","checklist":"s.3 Table Patrolling Frequency (Class 5 highways)"}],"basis":[{"type":"public_document","life_type":"accounting","title":"Amherstburg: Tangible Capital Assets Policy, Appendix A: TCA Categories, Life Years, and Thresholds","url":"https://media-001-ca.cdn.govstack.com/amherstburg-006-ca/media/vjvhyh1g/2026-08-10-tangible-capital-assets-policy-rm.pdf","page":7,"years":20,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Brockton: Policy F06-2009-03 Capital Asset Amortization","url":"https://brockton.ca/media/xsyhwhoe/policy-f06-2009-03-capital-asset-amortization.pdf","page":2,"years":20,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Greater Madawaska: By-Law 21-2025 Tangible Capital Asset Policy (Finance Policy 4-02)","url":"https://greatermadawaska.civicweb.net/document/95484","page":16,"years":15,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03","url":"https://greyhighlands.civicweb.net/document/406218/","page":10,"years":10,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Kapuskasing: By-law No. 3103, Tangible Capital Assets Policy","url":"https://kapuskasing.civicweb.net/document/6872/","page":15,"years":5,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026)","url":"https://listview.kenora.ca/Files/City%20Policy%20Manual/Administration%20and%20Finance/AF-6-1%20Tangible%20Capital%20Asset.pdf","page":16,"years":15,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Meaford: By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives","url":"https://meaford.civicweb.net/document/103944/","page":20,"years":[3,7],"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Prince Edward: FIN-12 Tangible Capital Assets Policy","url":"https://www.thecounty.ca/wp-content/uploads/2023/09/FIN-12-Tangible-Capital-Asset-Policy.pdf","page":34,"years":8,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Rainy River: F-9 Tangible Capital Assets Policy","url":"https://rainyriver.ca/uploads/plans-policies/finance-department/f9-tangible-capital-assets-policy.pdf","page":12,"years":10,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide","url":"https://severn.civicweb.net/document/10628/","page":402,"years":20,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"The Blue Mountains: POL.COR.19.04 Tangible Capital Assets Policy","url":"https://www.thebluemountains.ca/sites/default/files/2022-01/POL-COR-19-04-Tangible-Capital-Assets-Policy.pdf","page":12,"years":6,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"accounting","title":"Trent Lakes: 5.17 Capital Asset Policy","url":"https://www.trentlakes.ca/media/fjaduus0/517_capital-asset-policy.pdf","page":10,"years":8,"note":"Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"planning","title":"Amherstburg: Asset Management Plan Town of Amherstburg 2025","url":"https://www.amherstburg.ca/media/w5qhko4r/2025-amp-final-2025-06-30-rm-with-appendices.pdf","page":36,"years":[15,54],"note":"Asset management plan (planning life). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"planning","title":"Bruce: Asset Management Plan 2025, Bruce County","url":"https://www.brucecounty.on.ca/sites/default/files/BruceCounty_2025AMP_FINAL.pdf","page":44,"years":8,"note":"Asset management plan (planning life). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"planning","title":"Meaford: Municipality of Meaford Asset Management Plan - Core Assets (Appendix 1 to Report CAO2022-28)","url":"https://meaford.ca/wp-content/uploads/2026/06/cao-2022-28-appendix-1-asset-management-plan-core-assets.pdf","page":40,"years":7,"note":"Asset management plan (planning life). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"planning","title":"Rainy River: Asset Management Plan 2025-2035","url":"https://www.rainyriver.ca/uploads/plans-policies/Rainy%20River%20AMP%20version%2003-16-26.pdf","page":17,"years":10,"note":"Asset management plan (planning life). Approved on text check: the label and value were found on the cited page."},{"type":"public_document","life_type":"planning","title":"Thunder Bay: Future-Ready Roadmap: Asset Management Plan Phase Three","url":"https://www.thunderbay.ca/media/wuwp4vvv/asset-management-plan-phase-three_web.pdf","page":50,"years":7,"note":"Asset management plan (planning life). Approved on text check: the label and value were found on the cited page."}],"confidence":{"grade":"C","sample_size":null},"open_questions":["These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.","A municipal minimum standard tied to the statutory defence in s.44 of the Municipal Act, 2001; patrolling is a drive-by observation of the whole road, not a component-level inspection. Not an official version."],"contributors":["unfinished.one editors"],"last_reviewed":"2026-10-22","canonical_url":"https://unfinished.one/c/road-surface-treatment","versioned_url":"https://unfinished.one/c/road-surface-treatment/v/0.6.0","licence":"CC-BY-4.0","citation":"unfinished.one (2026). Road surface treatment, v0.6.0. https://unfinished.one/c/road-surface-treatment/v/0.6.0"}