Uniformat D3020

Boiler, steam

Also called steam boiler

Service life

24.8 yearsmedian of the stated lives · sources say 24.8 years
05101520253024.824.8

Years in service. One stated life so far; the band will widen as sources are added.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal accounting lives for HVAC (D30)

26 municipal policies from Ontario set a life for HVAC as a whole, from 22 distinct tables: 10–50 years, median 20. These are amortization periods chosen for accounting, not measured lives, and they describe the system rather than this component.

Median 20 yearsTrent Lakes: HVAC systems, 10 yearsGrey Highlands: Furnace, 15 yearsKapuskasing: HVAC Systems, 15 yearsSarnia: HVAC, 15 yearsThe Blue Mountains: Furnace, 15 yearsAmherstburg: Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel, 20 yearsAmherstburg: Arena - Air Conditioner, Brine Chillers, Compressors, Dehumidifiers, 20 yearsChapple: Building Improvements - HVAC Systems, 20 yearsGreater Napanee: E20 Mechanical - Boilers, Fire Panel/Alarm, Unit Heaters, HVAC, 20 yearsGrey Highlands: HVAC, 20 yearsKenora: Buildings - Mechanical System, 20 yearsLondon: Building Components - Services (HVAC, lighting, communication, plumbing etc.), 20 yearsMeaford: HVAC - Air Distribution, 20 yearsPrince Edward: Buildings - HVAC, 20 yearsRainy River: Building Improvements - HVAC Systems/Generator, 20 yearsSevern: Building Components - Air Conditioner, 20 yearsThe Blue Mountains: Boiler, 20 yearsWelland: HVAC/Electrical/Mechanical, 20 yearsAmherstburg: Arena - Refrigeration Condenser, Scoreboard, Sound System, 25 yearsGreater Madawaska and Quinte West: HVAC, 25 yearsGreater Napanee: E25 Plant Mechanical & Electrical, 25 yearsGrey Highlands: Boiler, 25 yearsKingston: Mechanical Equipment, 25 yearsKirkland Lake: Buildings and Improvements - Mechanical/Electrical, 25 yearsOrillia: Arena - Condenser/refrigeration, compressor, HVAC, heating units, 25 yearsSevern: Building Components - Furnace/Heating System, 25 yearsSevern: Building Components - Condenser, 25 yearsThe Blue Mountains: HVAC System, 25 yearsGreater Napanee: E30 Chillers, Rink Piping, Fuel Storage Tanks, 30 yearsSimcoe: Mechanical, 30 yearsBrockton: Mechanical/Electrical (Heating/Cooling System, Refridgerating System), 40 yearsMeaford: HVAC - System, 50 yearsMeaford: HVAC - Furnace, 15–25 yearsBancroft, Centre Hastings and 2 more: HVAC Systems, 20–25 yearsOrillia: Facility - HVAC, Boiler, 20–25 years0102030405060

Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.

All 35 stated lives
MunicipalityAs writtenYearsSource
Trent LakesHVAC systems10p10 · 2009
Grey HighlandsFurnace15p11 · 2026
KapuskasingHVAC Systems15p14 · 2009
SarniaHVAC15p1
The Blue MountainsFurnace15p11 · 2019
MeafordHVAC - Furnace15–25p17 · 2020
AmherstburgMechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel20p8 · 2026
AmherstburgArena - Air Conditioner, Brine Chillers, Compressors, Dehumidifiers20p8 · 2026
ChappleBuilding Improvements - HVAC Systems20p1
Greater NapaneeE20 Mechanical - Boilers, Fire Panel/Alarm, Unit Heaters, HVAC20p16 · 2012
Grey HighlandsHVAC20p11 · 2026
KenoraBuildings - Mechanical System20p15 · 2026
LondonBuilding Components - Services (HVAC, lighting, communication, plumbing etc.)20p2 · 2023
MeafordHVAC - Air Distribution20p17 · 2020
Prince EdwardBuildings - HVAC20p34 · 2022
Rainy RiverBuilding Improvements - HVAC Systems/Generator20p11 · 2010
SevernBuilding Components - Air Conditioner20p400 · 2019
The Blue MountainsBoiler20p11 · 2019
WellandHVAC/Electrical/Mechanical20p8 · 2021
Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same tableHVAC Systems20–25p5, p4, p6, p5
OrilliaFacility - HVAC, Boiler20–25p19
AmherstburgArena - Refrigeration Condenser, Scoreboard, Sound System25p8 · 2026
Greater Madawaska, Quinte West · same tableHVAC25p17, p38 · 2025
Greater NapaneeE25 Plant Mechanical & Electrical25p16 · 2012
Grey HighlandsBoiler25p11 · 2026
KingstonMechanical Equipment25p15 · 2016
Kirkland LakeBuildings and Improvements - Mechanical/Electrical25p10 · 2020
OrilliaArena - Condenser/refrigeration, compressor, HVAC, heating units25p19
SevernBuilding Components - Furnace/Heating System25p400 · 2019
SevernBuilding Components - Condenser25p400 · 2019
The Blue MountainsHVAC System25p11 · 2019
Greater NapaneeE30 Chillers, Rink Piping, Fuel Storage Tanks30p16 · 2012
SimcoeMechanical30p19 · 2025
BrocktonMechanical/Electrical (Heating/Cooling System, Refridgerating System)40p2 · 2009
MeafordHVAC - System50p17 · 2020

Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON

Preventive maintenance

42 tasks in 4 work orders. Intervals that fall due together are one visit: the annual visit also covers the monthly tasks.

  1. 1Monthly
  2. 2Monthly
  3. 3Monthly
  4. 4Monthly
  5. 5Monthly
  6. 6Monthly
  7. 7Monthly
  8. 8Monthly
  9. 9Monthly
  10. 10Monthly
  11. 11Monthly
  12. 12Annual

Months from the schedule start. Daily and weekly rounds run in between. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Daily · 12 tasks

Source: Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, 9.2.12 Boiler Checklist

TaskPage
Shut down or re-sequence boilers that are not neededp150
Do an overall visual inspection: all equipment operating and safety systems in placep150
Check steam pressure varies as expected with loadp150
Check for unstable water level (sign of contaminated feedwater, overload or malfunction)p150
Check burner for proper control and cleanlinessp150
Check motor condition: proper function and temperaturesp150
Check boiler room air temperature stays within design limitsp150
Verify bottom, surface and water column blowdowns are happening and effectivep150
Keep daily boiler log: fuel used, flue gas temperature, makeup water, steam output; watch for variationsp151
Check and clean or replace oil filters and strainersp151
Check oil is at proper temperature before burningp151
Confirm the boiler water treatment system is workingp151

Weekly · 8 tasks

Source: Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, Boiler Checklist (contd)

TaskPage
Measure flue gas composition and temperature at selected firing positionsp151
Check all relief valves for leaksp151
Test water level control: stop feedwater pump and confirm burner fuel cuts offp151
Clean pilot and burner assemblies; look for mineral or corrosion buildupp151
Stop fuel flow to check flame failure response, restart and observe flamep151
Inspect system for water or steam leaks, defective valves and traps, corroded piping, insulationp151
Inspect combustion air damper and fuel valve linkages for setting and tightnessp151
Inspect boiler for air leaks; check damper sealsp151

Monthly · 12 tasks

Source: Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, Boiler Checklist (contd)

TaskPage
Check blowdown is adequate to prevent solids buildupp151
Measure flue gas composition over the full firing range and compare with last monthp151
Check combustion air openings to boiler room and boiler are adequate and cleanp152
Check fuel system pressure gauge, pumps, filters and transfer lines; clean filtersp152
Check belt tension and packing glands for leakagep152
Check for air leaks around access openings and flame scannerp152
Check blower belts for tightness and slippagep152
Check gaskets seal tightly; replace if notp152
Inspect boiler insulation and casing for hot spotsp152
Calibrate steam control valves per manufacturerp152
Check pressure reducing/regulating valves operate properlyp152
Test boiler water quality for chemical balancep152

Annual · 10 tasks

Source: Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, Boiler Checklist (contd)

TaskPage
Clean water-side surfaces per manufacturerp152
Clean fire-side surfaces per manufacturerp152
Inspect and repair fire-side refractoriesp152
Remove and recondition or replace relief valvep152
Clean and recondition feedwater pumps, condensate receivers and deaeratorp152
Clean and recondition fuel system pumps, filters, pilot, oil preheaters, oil tanksp152
Clean electrical terminals; check electronic controls and replace defective partsp152
Check and repair hydraulic and pneumatic valvesp152
Adjust for optimal flue gas composition; record composition, firing position, temperaturep152
Eddy current test tubes for wall thickness, as requiredp152

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Boiler, steam, v0.1.0. https://unfinished.one/c/boiler-steam/v/0.1.0

BibTeX

@misc{unfinished_boiler_steam_0_1_0,
  title = {Boiler, steam},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.1.0},
  url = {https://unfinished.one/c/boiler-steam/v/0.1.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.1.0