Service life

75 yearsmedian of the stated lives · sources say 70–75 years
01020304050607080907075

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for storm sewer (G3030)

26 municipalities in Ontario state a life for storm sewer as a whole, in 26 distinct tables: 20–150 years, median 50. 57 rows come from capital asset policies (accounting lives, used for amortization) and 43 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 50 yearsKenora: Storm Sewers - Culvert - STL, 20 yearsSevern: Infrastructure - Roads - Ditches, 20 yearsBarrie: Low Impact Development, 25 yearsGreater Sudbury: Ponds, 25 yearsKapuskasing: Culverts - Steel, 25 yearsKenora: Storm Sewers - Pipe - STL, 25 yearsLondon: SWM Green Infrastructure, 25 yearsMeaford: Linear - Road Surface - Asphalt - Ditch, 25 yearsSevern: Infrastructure - Roads - Major Culverts, 25 yearsThe Blue Mountains: Linear - Road Top - Asphalt - Ditch, 25 yearsGreater Sudbury: CSP Storm Sewer, 30 yearsYork: Corrugated steel pipe culverts: Replacement, 35 yearsHalton: Stormwater Pumping Stations, 39 yearsBrockton: Storm Drains - Metal - Corrugated, 40 yearsChapple: Culverts - steel, 40 yearsEssex: Stormwater Mains, 40 yearsKirkland Lake: Culverts, 40 yearsMeaford: Linear - Stormwater Facility, 40 yearsRainy River: Drainage, 40 yearsSevern: Buildings/Structures - Water & Sewer - Intake Outfall Line, 40 yearsThe Blue Mountains: Linear - Culverts - Corrugated Steel, 40 yearsThe Blue Mountains: Linear - Stormwater Facility, 40 yearsThe Blue Mountains: Linear - Road Base - Asphalt - Ditch, 40 yearsTrent Lakes: Culverts, 40 yearsAmherstburg: Infrastructure - Storm Water - Stormwater System, 50 yearsBarrie: Storm Sewers (Steel), 50 yearsBarrie: Culverts (Remaining Assets), 50 yearsBarrie: Filtration Devices, 50 yearsBarrie: Sediment Removal Devices, 50 yearsGreater Madawaska and Quinte West: Culverts, 50 yearsGreater Sudbury: Oil and Grit Separators, 50 yearsGrey Highlands: Catch Basins, 50 yearsKapuskasing: Storm Sewer System - PVC / CI, 50 yearsKapuskasing: Storm Sewer System - Concrete, 50 yearsKenora: Storm Sewers - Pipe - Conc/PE/PVC, 50 yearsKenora: Storm Sewers - Culvert - PE/PVC, 50 yearsKenora: Storm Sewers - Manholes, 50 yearsKenora: Storm Sewers - Catch Basins, 50 yearsKingston: Roads and Related - Storm sewer, 50 yearsKirkland Lake: Storm Sewer System - PVC / CI, Concrete, 50 yearsLondon: Minor Culverts (between 1.8m to 3m span), 50 yearsLondon: Major Culverts (greater than and equal to 3m span), 50 yearsMeaford: Linear - Road Base - Asphalt - Ditch, 50 yearsPrince Edward: Storm - Storm Mains (Pooled), 50 yearsPrince Edward: Storm - Catch basins, 50 yearsPrince Edward: Storm - Outlets, 50 yearsSarnia: Catch Basins, 50 yearsSevern: Infrastructure - Water & Sewer - Catch Basins, 50 yearsSevern: Infrastructure - Water & Sewer - Double Catch Basins, 50 yearsSevern: Infrastructure - Water & Sewer - Catch Basin Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Double Catch Basin Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Storm Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Storm Sewers, 50 yearsSimcoe: Stormwater Outlets, 50 yearsSimcoe: Stormwater Sewers, 50 yearsSimcoe: Stormwater Ponds, 50 yearsSimcoe: Storm Ponds, 50 yearsSimcoe: Storm Sewers, 50 yearsSimcoe: Structural Culverts, 50 yearsYork: Oil grit separator replacement, 50 yearsGreater Sudbury: AC Sewer, 55 yearsEssex: Culverts, 60 yearsLondon: Minor Culverts (Up to 1.8m in diameter), 60 yearsQuinte West: Storm Water Ponds, 60 yearsRainy River: Sewer/Storm Sewer, 60 yearsSarnia: Storm Sewers, 60 yearsYork: Maintenance hole replacement, 60 yearsYork: Catch basin and ditch inlet replacement, 60 yearsGreater Sudbury: Catch Basin, 70 yearsGreater Sudbury: Maintenance Hole, 70 yearsKapuskasing: Culverts - Concrete, 70 yearsBarrie: Storm Sewers (Remaining Assets), 75 yearsBarrie: Culverts (Concrete), 75 yearsBrockton: Storm Drains - Plastic, 75 yearsBrockton: Storm Drains - Concrete, 75 yearsGrey Highlands: Storm Sewers Pipe, 75 yearsKingston: Land Improvements - Storm water ponds, 75 yearsMeaford: Linear - Culverts - Concrete, 75 yearsSimcoe: Culverts - Concrete, 75 yearsSimcoe: Culverts - Corrugated Steel, 75 yearsThe Blue Mountains: Linear - Culverts - Concrete, 75 yearsYork: Concrete culverts: Replacement, 75 yearsGreater Sudbury: HDPE Storm Sewer, 80 yearsLondon: Minor Treatment, 80 yearsWelland: Sanitary & Storm Sewers (by component) - Catchbasins & Leads, 80 yearsGreater Sudbury: Concrete Sewer, 90 yearsBarrie: Storm Sewers (Asbestos Cement, Vitrified Clay), 100 yearsLondon: Storm sewers <450mm diameter, 100 yearsLondon: Storm sewers 450mm>= to <1,500mm diameter, 100 yearsLondon: Storm sewers >=1,500 mm diameter, 100 yearsLondon: Open Conveyance, 100 yearsLondon: Storm Water Management Facilities, 100 yearsMeaford: Linear - Culverts - Corrugated Steel, 25–40 yearsGrey Highlands: Culverts, 30–40 yearsYork: Storm pipe replacement, 35–75 yearsYork: Outfall replacement, 35–75 yearsYork: Culverts under three metres: Replacement or relining, 35–75 yearsMeaford: Linear - Culverts - HDPE / PVC, 50–80 yearsToronto: Conveyance - Linear Infrastructure (Local & Trunk Sewers), 50–150 years020406080100120140160

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 99 stated lives
MunicipalityAs writtenYearsKindSource
KenoraStorm Sewers - Culvert - STL20accountingp16 · 2026
SevernInfrastructure - Roads - Ditches20accountingp402 · 2019
BarrieLow Impact Development25planningp127 · 2025
Greater SudburyPonds25planningp30 · 2023
KapuskasingCulverts - Steel25accountingp15 · 2009
KenoraStorm Sewers - Pipe - STL25accountingp16 · 2026
LondonSWM Green Infrastructure25planningp127 · 2023
MeafordLinear - Road Surface - Asphalt - Ditch25accountingp20 · 2020
SevernInfrastructure - Roads - Major Culverts25accountingp402 · 2019
The Blue MountainsLinear - Road Top - Asphalt - Ditch25accountingp12 · 2019
MeafordLinear - Culverts - Corrugated Steel25–40accountingp19 · 2020
Greater SudburyCSP Storm Sewer30planningp30 · 2023
Grey HighlandsCulverts30–40accountingp10 · 2026
YorkCorrugated steel pipe culverts: Replacement35planningp53 · 2024
YorkStorm pipe replacement35–75planningp53 · 2024
YorkOutfall replacement35–75planningp53 · 2024
YorkCulverts under three metres: Replacement or relining35–75planningp53 · 2024
HaltonStormwater Pumping Stations39planningp110 · 2025
BrocktonStorm Drains - Metal - Corrugated40accountingp3 · 2009
ChappleCulverts - steel40accountingp1
EssexStormwater Mains40planningp74 · 2025
Kirkland LakeCulverts40accountingp10 · 2020
MeafordLinear - Stormwater Facility40accountingp19 · 2020
Rainy RiverDrainage40accountingp11 · 2010
SevernBuildings/Structures - Water & Sewer - Intake Outfall Line40accountingp400 · 2019
The Blue MountainsLinear - Culverts - Corrugated Steel40accountingp12 · 2019
The Blue MountainsLinear - Stormwater Facility40accountingp12 · 2019
The Blue MountainsLinear - Road Base - Asphalt - Ditch40accountingp12 · 2019
Trent LakesCulverts40accountingp10 · 2009
AmherstburgInfrastructure - Storm Water - Stormwater System50accountingp7 · 2026
BarrieStorm Sewers (Steel)50planningp127 · 2025
BarrieCulverts (Remaining Assets)50planningp127 · 2025
BarrieFiltration Devices50planningp127 · 2025
BarrieSediment Removal Devices50planningp127 · 2025
Greater Madawaska, Quinte West · same tableCulverts50accountingp17, p37 · 2025
Greater SudburyOil and Grit Separators50planningp30 · 2023
Grey HighlandsCatch Basins50accountingp10 · 2026
KapuskasingStorm Sewer System - PVC / CI50accountingp15 · 2009
KapuskasingStorm Sewer System - Concrete50accountingp15 · 2009
KenoraStorm Sewers - Pipe - Conc/PE/PVC50accountingp16 · 2026
KenoraStorm Sewers - Culvert - PE/PVC50accountingp16 · 2026
KenoraStorm Sewers - Manholes50accountingp16 · 2026
KenoraStorm Sewers - Catch Basins50accountingp16 · 2026
KingstonRoads and Related - Storm sewer50accountingp15 · 2016
Kirkland LakeStorm Sewer System - PVC / CI, Concrete50accountingp10 · 2020
LondonMinor Culverts (between 1.8m to 3m span)50planningp158 · 2023
LondonMajor Culverts (greater than and equal to 3m span)50planningp158 · 2023
MeafordLinear - Road Base - Asphalt - Ditch50accountingp19 · 2020
Prince EdwardStorm - Storm Mains (Pooled)50accountingp34 · 2022
Prince EdwardStorm - Catch basins50accountingp34 · 2022
Prince EdwardStorm - Outlets50accountingp34 · 2022
SarniaCatch Basins50accountingp2
SevernInfrastructure - Water & Sewer - Catch Basins50accountingp402 · 2019
SevernInfrastructure - Water & Sewer - Double Catch Basins50accountingp402 · 2019
SevernInfrastructure - Water & Sewer - Catch Basin Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Double Catch Basin Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Storm Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Storm Sewers50accountingp403 · 2019
SimcoeStormwater Outlets50planningp92 · 2025
SimcoeStormwater Sewers50planningp92 · 2025
SimcoeStormwater Ponds50planningp92 · 2025
SimcoeStorm Ponds50accountingp21 · 2025
SimcoeStorm Sewers50accountingp21 · 2025
SimcoeStructural Culverts50accountingp21 · 2025
YorkOil grit separator replacement50planningp53 · 2024
MeafordLinear - Culverts - HDPE / PVC50–80accountingp19 · 2020
TorontoConveyance - Linear Infrastructure (Local & Trunk Sewers)50–150planningp379 · 2025
Greater SudburyAC Sewer55planningp30 · 2023
EssexCulverts60planningp60 · 2025
LondonMinor Culverts (Up to 1.8m in diameter)60planningp127 · 2023
Quinte WestStorm Water Ponds60accountingp38 · 2024
Rainy RiverSewer/Storm Sewer60accountingp11 · 2010
SarniaStorm Sewers60accountingp2
YorkMaintenance hole replacement60planningp53 · 2024
YorkCatch basin and ditch inlet replacement60planningp53 · 2024
Greater SudburyCatch Basin70planningp30 · 2023
Greater SudburyMaintenance Hole70planningp30 · 2023
KapuskasingCulverts - Concrete70accountingp15 · 2009
BarrieStorm Sewers (Remaining Assets)75planningp127 · 2025
BarrieCulverts (Concrete)75planningp127 · 2025
BrocktonStorm Drains - Plastic75accountingp3 · 2009
BrocktonStorm Drains - Concrete75accountingp3 · 2009
Grey HighlandsStorm Sewers Pipe75accountingp10 · 2026
KingstonLand Improvements - Storm water ponds75accountingp14 · 2016
MeafordLinear - Culverts - Concrete75accountingp19 · 2020
SimcoeCulverts - Concrete75planningp68 · 2025
SimcoeCulverts - Corrugated Steel75planningp68 · 2025
The Blue MountainsLinear - Culverts - Concrete75accountingp12 · 2019
YorkConcrete culverts: Replacement75planningp53 · 2024
Greater SudburyHDPE Storm Sewer80planningp30 · 2023
LondonMinor Treatment80planningp127 · 2023
WellandSanitary & Storm Sewers (by component) - Catchbasins & Leads80accountingp9 · 2021
Greater SudburyConcrete Sewer90planningp30 · 2023
BarrieStorm Sewers (Asbestos Cement, Vitrified Clay)100planningp127 · 2025
LondonStorm sewers <450mm diameter100planningp127 · 2023
LondonStorm sewers 450mm>= to <1,500mm diameter100planningp127 · 2023
LondonStorm sewers >=1,500 mm diameter100planningp127 · 2023
LondonOpen Conveyance100planningp127 · 2023
LondonStorm Water Management Facilities100planningp127 · 2023

Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON

Preventive maintenance

No maintenance tasks are sourced for this component yet.

Open questions

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Culvert, concrete, v0.2.0. https://unfinished.one/c/culvert-concrete/v/0.2.0

BibTeX

@misc{unfinished_culvert_concrete_0_2_0,
  title = {Culvert, concrete},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.2.0},
  url = {https://unfinished.one/c/culvert-concrete/v/0.2.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.3.0, 0.2.0, 0.1.0