unfinished.one

Uniformat D4010

Fire pump

Also called fire pump controller

Service life

20 yearsmedian of the stated lives · sources say 20 years
05101520252020

Years in service. One stated life so far; the band will widen as sources are added.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for fire protection (D40)

16 municipalities in British Columbia and Ontario state a life for fire protection as a whole, in 10 distinct tables: 15–50 years, median 20. These come from capital asset policies: accounting lives, used for amortization. They describe the system rather than this component, and none is a measured life.

Median 20 yearsParksville: Fire Suppression, 20 yearsTelkwa: Electrical/Plumbing/Fire, 20 yearsAmherstburg: Fire Safety - Control Panel, Smoke Detectors, 20 yearsAmherstburg: Plumbing - Sprinkler System, 20 yearsGrey Highlands: Fire Alarms, 20 yearsThe Blue Mountains: Fire Alarms, 20 yearsMeaford: Fire Protection - Sprinkler System, 25 yearsMeaford: Fire Protection - Alarm Panel, 25 yearsThe Blue Mountains: Sprinkler System, 25 yearsGrey Highlands: Sprinkler System, 40 yearsParksville: Sprinkler System, 50 yearsFort St. James, Revelstoke and 2 more: Electrical/Plumbing/Fire, 15–20 yearsOkanagan-Similkameen: Electrical/Plumbing/Fire, 15–20 yearsSalmo: Electrical/Plumbing/Fire, 15–20 yearsBancroft, Centre Hastings and 2 more: Sprinkler/Fire System, 20–25 yearsParksville: Fire Protection, 20–50 years0102030405060

Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.

All 16 stated lives
MunicipalityAs writtenYearsKindSource
Fort St. James, Revelstoke, Rossland, Tumbler Ridge · same tableElectrical/Plumbing/Fire15–20accountingp5, p9, p7, p5 · 2010
Okanagan-SimilkameenElectrical/Plumbing/Fire15–20accountingp11 · 2023
SalmoElectrical/Plumbing/Fire15–20accountingp6 · 2016
ParksvilleFire Suppression20accountingp9 · 2023
TelkwaElectrical/Plumbing/Fire20accountingp8
AmherstburgFire Safety - Control Panel, Smoke Detectors20accountingp8 · 2026
AmherstburgPlumbing - Sprinkler System20accountingp8 · 2026
Grey HighlandsFire Alarms20accountingp11 · 2026
The Blue MountainsFire Alarms20accountingp11 · 2019
Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same tableSprinkler/Fire System20–25accountingp5, p4, p6, p5
ParksvilleFire Protection20–50accountingp9 · 2023
MeafordFire Protection - Sprinkler System25accountingp17 · 2020
MeafordFire Protection - Alarm Panel25accountingp17 · 2020
The Blue MountainsSprinkler System25accountingp11 · 2019
Grey HighlandsSprinkler System40accountingp11 · 2026
ParksvilleSprinkler System50accountingp9 · 2023

Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON

Preventive maintenance

28 tasks in 5 work orders. Intervals that fall due together are one visit: the every 5 years visit also covers the monthly, semi-annual, annual and every 2 years tasks.

  1. 1Monthly
  2. 2Monthly
  3. 3Monthly
  4. 4Monthly
  5. 5Monthly
  6. 6Semi
  7. 7Monthly
  8. 8Monthly
  9. 9Monthly
  10. 10Monthly
  11. 11Monthly
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Monthly · 13 tasks

Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-7 Fire Pump ITM Tasks

TaskPage
Inspect pump house condition, ventilation and heatingp44
Check packing leakagep44
Check pump room drainagep44
Check gauge readings and that gauges workp44
Check controller is in AUTOp44
Inspect controller electrical connectionsp44
Operate manual and automatic startingp44
Check battery chargep44
Start and churn pump (electric 10 min, engine 30 min)p44
Check relief valve operationp44
Check fuel level (engine-driven)p44
Inspect exhaust system for leaks (engine-driven)p44
Start again on second battery set and churn (engine-driven)p44

Semi-annual · 1 task

Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-7 Fire Pump ITM Tasks

TaskPage
Check fuel level if not supervised (engine-driven)p45

Annual · 2 tasks

Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-7 Fire Pump ITM Tasks

TaskPage
Change engine fluids per manufacturerp45
Change engine filters per manufacturerp45

Every 2 years · 10 tasks

Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-7 Fire Pump ITM Tasks

TaskPage
Calibrate controller pressure switchesp45
Exercise controller breakers and switchesp45
Inspect controller fusesp45
Check coupling alignmentp45
Check pump shaft endplayp45
Lubricate pump bearingsp45
Lubricate couplingsp45
Calibrate relief valvesp45
Test emergency power supply for the pump motorp45
Sample and test fuel (engine-driven)p45

Every 5 years · 2 tasks

Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-7 Fire Pump ITM Tasks

TaskPage
Flow test pumpp45
Calibrate or replace flow meter before flow testp45

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Fire pump, v0.2.0. https://unfinished.one/c/fire-pump/v/0.2.0

BibTeX

@misc{unfinished_fire_pump_0_2_0,
  title = {Fire pump},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.2.0},
  url = {https://unfinished.one/c/fire-pump/v/0.2.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0