unfinished.one

Uniformat D5090

Generator, natural gas standby

Also called gas generator, natural gas generator

Service life

25 yearsmedian of the stated lives · sources say 25 years
0510152025302525

Years in service. One stated life so far; the band will widen as sources are added.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal accounting lives for electrical (D50)

20 municipal policies from Ontario set a life for electrical as a whole, from 16 distinct tables: 10–50 years, median 20. These are amortization periods chosen for accounting, not measured lives, and they describe the system rather than this component.

Median 20 yearsKingston: Electrical Equipment, 10 yearsGrey Highlands: Exterior Lighting, 15 yearsMeaford: Electrical - Exterior Lighting, 15 yearsThe Blue Mountains: Exterior Lighting, 15 yearsAmherstburg: Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel, 20 yearsGrey Highlands: Interior Lighting, 20 yearsGrey Highlands: Ice Surface Lighting, 20 yearsKenora: Buildings - Electrical System, 20 yearsLondon: Building Components - Services (HVAC, lighting, communication, plumbing etc.), 20 yearsMeaford: Electrical - Interior Lighting - Standard, 20 yearsMeaford: Electrical - Interior Lighting - High Wattage, 20 yearsMeaford: Electrical - Emergency Lighting, 20 yearsThe Blue Mountains: Interior Lighting, 20 yearsThe Blue Mountains: Ice Surface Lighting, 20 yearsWelland: HVAC/Electrical/Mechanical, 20 yearsGreater Napanee: E25 Plant Mechanical & Electrical, 25 yearsKirkland Lake: Buildings and Improvements - Mechanical/Electrical, 25 yearsRainy River: Building Improvements - Electrical/Plumbing, 25 yearsThe Blue Mountains: Electrical System, 25 yearsBrockton: Mechanical/Electrical (Heating/Cooling System, Refridgerating System), 40 yearsGreater Madawaska and Quinte West: Electrical, 40 yearsSimcoe: Electrical, 40 yearsTrent Lakes: Electrical, 40 yearsMeaford: Electrical - System, 50 yearsBancroft, Centre Hastings and 2 more: Electrical/Plumbing, 25–30 years0102030405060

Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.

All 25 stated lives
MunicipalityAs writtenYearsSource
KingstonElectrical Equipment10p15 · 2016
Grey HighlandsExterior Lighting15p11 · 2026
MeafordElectrical - Exterior Lighting15p17 · 2020
The Blue MountainsExterior Lighting15p11 · 2019
AmherstburgMechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel20p8 · 2026
Grey HighlandsInterior Lighting20p11 · 2026
Grey HighlandsIce Surface Lighting20p11 · 2026
KenoraBuildings - Electrical System20p15 · 2026
LondonBuilding Components - Services (HVAC, lighting, communication, plumbing etc.)20p2 · 2023
MeafordElectrical - Interior Lighting - Standard20p17 · 2020
MeafordElectrical - Interior Lighting - High Wattage20p17 · 2020
MeafordElectrical - Emergency Lighting20p17 · 2020
The Blue MountainsInterior Lighting20p11 · 2019
The Blue MountainsIce Surface Lighting20p11 · 2019
WellandHVAC/Electrical/Mechanical20p8 · 2021
Greater NapaneeE25 Plant Mechanical & Electrical25p16 · 2012
Kirkland LakeBuildings and Improvements - Mechanical/Electrical25p10 · 2020
Rainy RiverBuilding Improvements - Electrical/Plumbing25p11 · 2010
The Blue MountainsElectrical System25p11 · 2019
Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same tableElectrical/Plumbing25–30p5, p4, p6, p5
BrocktonMechanical/Electrical (Heating/Cooling System, Refridgerating System)40p2 · 2009
Greater Madawaska, Quinte West · same tableElectrical40p17, p38 · 2025
SimcoeElectrical40p19 · 2025
Trent LakesElectrical40p10 · 2009
MeafordElectrical - System50p17 · 2020

Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON

Preventive maintenance

16 tasks in 3 work orders. Intervals that fall due together are one visit: the annual visit also covers the monthly and semi-annual tasks.

  1. 1Monthly
  2. 2Monthly
  3. 3Monthly
  4. 4Monthly
  5. 5Monthly
  6. 6Semi
  7. 7Monthly
  8. 8Monthly
  9. 9Monthly
  10. 10Monthly
  11. 11Monthly
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Monthly · 11 tasks

Source: UFM 3-540-07 Operation and Maintenance (O&M): Generators, Table 6-1 Typical Generator Maintenance Schedule

TaskPage
Visual inspectionp42
Check coolant heaterp42
Check coolant levelp42
Check oil levelp42
Check charge-air pipingp42
Check and clean air cleanerp42
Check battery chargerp42
Check coolant concentrationp42
Check drive belt tensionp42
Drain exhaust condensatep42
Check starting batteriesp42

Semi-annual · 4 tasks

Source: UFM 3-540-07 Operation and Maintenance (O&M): Generators, Table 6-1 Typical Generator Maintenance Schedule

TaskPage
Change oil and filterp42
Change coolant filterp42
Clean crankcase breatherp42
Check radiator hosesp42

Annual · 1 task

Source: UFM 3-540-07 Operation and Maintenance (O&M): Generators, Table 6-1 Typical Generator Maintenance Schedule

TaskPage
Clean cooling systemsp42

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Generator, natural gas standby, v0.2.0. https://unfinished.one/c/generator-natural-gas/v/0.2.0

BibTeX

@misc{unfinished_generator_natural_gas_0_2_0,
  title = {Generator, natural gas standby},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.2.0},
  url = {https://unfinished.one/c/generator-natural-gas/v/0.2.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0