Uniformat D5010
Panelboard
Also called panel, electrical panel, distribution panel, lighting panel
Service life
Years in service. One stated life so far; the band will widen as sources are added.
Basis
- 50 years · CNA e-Tool Estimated Useful Life Table, p13 · HUD CNA 3.4.4.1.1 “Building service panel” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing.
- 50 years · CNA e-Tool Estimated Useful Life Table, p13 · HUD CNA 3.4.4.2.1 “Tenant electrical panel” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing.
How sources are chosen and recorded: sourcing policy.
Municipal lives for electrical (D50)
35 municipalities in Ontario, British Columbia and Alberta state a life for electrical as a whole, in 27 distinct tables: 10–50 years, median 20. These come from capital asset policies: accounting lives, used for amortization. They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.
All 37 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Kingston | Electrical Equipment | 10 | accounting | p15 · 2016 |
| Grey Highlands | Exterior Lighting | 15 | accounting | p11 · 2026 |
| Meaford | Electrical - Exterior Lighting | 15 | accounting | p17 · 2020 |
| The Blue Mountains | Exterior Lighting | 15 | accounting | p11 · 2019 |
| Fort St. James, Revelstoke, Rossland, Tumbler Ridge · same table | Electrical/Plumbing/Fire | 15–20 | accounting | p5, p9, p7, p5 · 2010 |
| Okanagan-Similkameen | Electrical/Plumbing/Fire | 15–20 | accounting | p11 · 2023 |
| Salmo | Electrical/Plumbing/Fire | 15–20 | accounting | p6 · 2016 |
| Lloydminster | Permanent Structures - Electrical | 20 | accounting | p11 · 2023 |
| Lloydminster | Portable Structures - Electrical | 20 | accounting | p11 · 2023 |
| Comox Valley | HVAC systems, mechanical, plumbing, wiring, etc. | 20 | accounting | p6 · 2010 |
| Cranbrook | HVAC, plumbing, lighting, etc | 20 | accounting | p9 · 2010 |
| Parksville | Electrical Infrastructure | 20 | accounting | p9 · 2023 |
| Telkwa | Electrical/Plumbing/Fire | 20 | accounting | p8 |
| Amherstburg | Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel | 20 | accounting | p8 · 2026 |
| Grey Highlands | Interior Lighting | 20 | accounting | p11 · 2026 |
| Grey Highlands | Ice Surface Lighting | 20 | accounting | p11 · 2026 |
| Kenora | Buildings - Electrical System | 20 | accounting | p15 · 2026 |
| London | Building Components - Services (HVAC, lighting, communication, plumbing etc.) | 20 | accounting | p2 · 2023 |
| Meaford | Electrical - Interior Lighting - Standard | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Interior Lighting - High Wattage | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Emergency Lighting | 20 | accounting | p17 · 2020 |
| The Blue Mountains | Interior Lighting | 20 | accounting | p11 · 2019 |
| The Blue Mountains | Ice Surface Lighting | 20 | accounting | p11 · 2019 |
| Welland | HVAC/Electrical/Mechanical | 20 | accounting | p8 · 2021 |
| Vulcan County | HVAC (electrical, mechanical) | 20–30 | accounting | p5 · 2024 |
| Duncan, North Cowichan · same table | Building Other (Electrical, Mechanical, etc.) | 25 | accounting | p17, p9 · 2011 |
| Tofino | Systems - mechanical, electrical, HVAC | 25 | accounting | p12 · 2009 |
| Greater Napanee | E25 Plant Mechanical & Electrical | 25 | accounting | p16 · 2012 |
| Kirkland Lake | Buildings and Improvements - Mechanical/Electrical | 25 | accounting | p10 · 2020 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | accounting | p11 · 2010 |
| The Blue Mountains | Electrical System | 25 | accounting | p11 · 2019 |
| Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same table | Electrical/Plumbing | 25–30 | accounting | p5, p4, p6, p5 |
| Brockton | Mechanical/Electrical (Heating/Cooling System, Refridgerating System) | 40 | accounting | p2 · 2009 |
| Greater Madawaska, Quinte West · same table | Electrical | 40 | accounting | p17, p38 · 2025 |
| Simcoe | Electrical | 40 | accounting | p19 · 2025 |
| Trent Lakes | Electrical | 40 | accounting | p10 · 2009 |
| Meaford | Electrical - System | 50 | accounting | p17 · 2020 |
Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON
Preventive maintenance
17 tasks in 1 work order.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Annual · 17 tasks
Source: TM 5-692-1 Maintenance of Mechanical and Electrical Equipment at Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities: Recommended Maintenance Practices, Table 21-1 Typical secondary distribution maintenance
| Task | Page |
|---|---|
| Check warning signs are in place | p173 |
| Inspect enclosure for damage, openings and corrosion | p173 |
| Clear blocked air passages | p173 |
| Investigate unusual odors | p173 |
| Inspect electrical connections for degradation and tightness | p173 |
| Inspect insulation for discoloration | p173 |
| Inspect equipment grounding conductors and connections | p173 |
| Check indicating lights | p173 |
| Clean equipment | p173 |
| Tighten electrical connections | p173 |
| Verify equipment grounding | p173 |
| Infrared scan | p173 |
| Overcurrent test critical-load molded-case breakers | p174 |
| Contact resistance test critical-load breakers | p175 |
| Operate each breaker by its handle | p175 |
| Measure and record neutral currents | p175 |
| Perform harmonics analysis | p175 |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- Only one source so far: HUD planning lives for US multifamily housing. Canadian and observed sources are needed.
- Some maintenance intervals come from TM 5-692-1, an Army manual for mission-critical (C4ISR) facilities; they may be tighter than typical commercial practice.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Panelboard, v0.2.0. https://unfinished.one/c/panelboard/v/0.2.0BibTeX
@misc{unfinished_panelboard_0_2_0,
title = {Panelboard},
author = {{unfinished.one}},
year = {2026},
version = {0.2.0},
url = {https://unfinished.one/c/panelboard/v/0.2.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0