Uniformat D5010
Transformer, pad-mounted liquid-filled
Also called pad mount transformer
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 30 years · CNA e-Tool Estimated Useful Life Table, p3 · HUD CNA 3.2.8.2.3 “Transformer” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing. HUD's row is a site electric utility transformer.
- 32 years · Energy Conservation Program: Energy Conservation Standards for Distribution Transformers (final rule), 89 FR 29834, April 22, 2024, p113 · IV.F.8 “Transformer Service Lifetime: "a distribution of lifetimes, with an estimated average of 32 years and a maximum of 60 years"” — U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy (planning life)Printed page 29946. Covers all distribution transformers, including low-voltage dry-type (building dry-type) and medium-voltage liquid-immersed (pad-mounted). Mean of a distribution; the maximum is 60 years. Same value also stated on p.5 (printed 29838) and in Table IV summary on p.101 (printed 29934).
How sources are chosen and recorded: sourcing policy.
Municipal lives for electrical (D50)
35 municipalities in Ontario, British Columbia and Alberta state a life for electrical as a whole, in 27 distinct tables: 10–50 years, median 20. These come from capital asset policies: accounting lives, used for amortization. They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.
All 37 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Kingston | Electrical Equipment | 10 | accounting | p15 · 2016 |
| Grey Highlands | Exterior Lighting | 15 | accounting | p11 · 2026 |
| Meaford | Electrical - Exterior Lighting | 15 | accounting | p17 · 2020 |
| The Blue Mountains | Exterior Lighting | 15 | accounting | p11 · 2019 |
| Fort St. James, Revelstoke, Rossland, Tumbler Ridge · same table | Electrical/Plumbing/Fire | 15–20 | accounting | p5, p9, p7, p5 · 2010 |
| Okanagan-Similkameen | Electrical/Plumbing/Fire | 15–20 | accounting | p11 · 2023 |
| Salmo | Electrical/Plumbing/Fire | 15–20 | accounting | p6 · 2016 |
| Lloydminster | Permanent Structures - Electrical | 20 | accounting | p11 · 2023 |
| Lloydminster | Portable Structures - Electrical | 20 | accounting | p11 · 2023 |
| Comox Valley | HVAC systems, mechanical, plumbing, wiring, etc. | 20 | accounting | p6 · 2010 |
| Cranbrook | HVAC, plumbing, lighting, etc | 20 | accounting | p9 · 2010 |
| Parksville | Electrical Infrastructure | 20 | accounting | p9 · 2023 |
| Telkwa | Electrical/Plumbing/Fire | 20 | accounting | p8 |
| Amherstburg | Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel | 20 | accounting | p8 · 2026 |
| Grey Highlands | Interior Lighting | 20 | accounting | p11 · 2026 |
| Grey Highlands | Ice Surface Lighting | 20 | accounting | p11 · 2026 |
| Kenora | Buildings - Electrical System | 20 | accounting | p15 · 2026 |
| London | Building Components - Services (HVAC, lighting, communication, plumbing etc.) | 20 | accounting | p2 · 2023 |
| Meaford | Electrical - Interior Lighting - Standard | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Interior Lighting - High Wattage | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Emergency Lighting | 20 | accounting | p17 · 2020 |
| The Blue Mountains | Interior Lighting | 20 | accounting | p11 · 2019 |
| The Blue Mountains | Ice Surface Lighting | 20 | accounting | p11 · 2019 |
| Welland | HVAC/Electrical/Mechanical | 20 | accounting | p8 · 2021 |
| Vulcan County | HVAC (electrical, mechanical) | 20–30 | accounting | p5 · 2024 |
| Duncan, North Cowichan · same table | Building Other (Electrical, Mechanical, etc.) | 25 | accounting | p17, p9 · 2011 |
| Tofino | Systems - mechanical, electrical, HVAC | 25 | accounting | p12 · 2009 |
| Greater Napanee | E25 Plant Mechanical & Electrical | 25 | accounting | p16 · 2012 |
| Kirkland Lake | Buildings and Improvements - Mechanical/Electrical | 25 | accounting | p10 · 2020 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | accounting | p11 · 2010 |
| The Blue Mountains | Electrical System | 25 | accounting | p11 · 2019 |
| Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same table | Electrical/Plumbing | 25–30 | accounting | p5, p4, p6, p5 |
| Brockton | Mechanical/Electrical (Heating/Cooling System, Refridgerating System) | 40 | accounting | p2 · 2009 |
| Greater Madawaska, Quinte West · same table | Electrical | 40 | accounting | p17, p38 · 2025 |
| Simcoe | Electrical | 40 | accounting | p19 · 2025 |
| Trent Lakes | Electrical | 40 | accounting | p10 · 2009 |
| Meaford | Electrical - System | 50 | accounting | p17 · 2020 |
Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON
Preventive maintenance
9 tasks in 2 work orders. Intervals that fall due together are one visit: the every 2 years visit also covers the annual tasks.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Annual · 5 tasks
Source: TM 5-692-1 Maintenance of Mechanical and Electrical Equipment at Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities: Recommended Maintenance Practices, Table 20-5 Transformers (primary distribution)
Every 2 years · 4 tasks
Source: UFM 3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution Systems, 5-2.2.4.1 Time-Base Preventative Maintenance (transformers)
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- Every source here is a published planning, design or accounting life. None is observed replacement data.
- Some maintenance intervals come from TM 5-692-1, an Army manual for mission-critical (C4ISR) facilities; they may be tighter than typical commercial practice.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Transformer, pad-mounted liquid-filled, v0.2.0. https://unfinished.one/c/transformer-pad-mounted/v/0.2.0BibTeX
@misc{unfinished_transformer_pad_mounted_0_2_0,
title = {Transformer, pad-mounted liquid-filled},
author = {{unfinished.one}},
year = {2026},
version = {0.2.0},
url = {https://unfinished.one/c/transformer-pad-mounted/v/0.2.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0