unfinished.one

Uniformat G3010

Watermain, HDPE

Also called HDPE watermain, polyethylene watermain

Service life

77.5 yearsmedian of the stated lives · sources say 70–90 years
01020304050607080901001107090

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for water supply (G3010)

23 municipalities in Ontario state a life for water supply as a whole, in 23 distinct tables: 15–105 years, median 60. 70 rows come from capital asset policies (accounting lives, used for amortization) and 33 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 60 yearsSarnia: Water Pumping Stations - mechanical/equipment, 15 yearsThe Blue Mountains: Linear - Fire Hydrants, 20 yearsMeaford: Linear - Valves - Gate, 25 yearsMeaford: Linear - Valves - Air Release, 25 yearsOrillia: Roads: Hydrants, 25 yearsSarnia: Water Pumping Stations - pumps, 25 yearsBarrie: Watermain - Galvanized, 30 yearsRainy River: Water valves/services, 30 yearsLondon: Pump Stations (Including Rechlorination), 35 yearsChapple: Fire Hydrants, 40 yearsGreater Sudbury: System Valve, 40 yearsPrince Edward: Water - Valves (Pooled), 40 yearsSarnia: Fire Hydrants, 40 yearsAmherstburg: Infrastructure - Water - Water Tower, 50 yearsBarrie: Watermain - Cross linked Polyethylene, 50 yearsBarrie: Watermain - Steel, 50 yearsBarrie: Watermain - Cured-in-Place-Pipe (Lining), 50 yearsGrey Highlands: Hydrants, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Water Tower, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Valve Chamber, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Clearwell, 50 yearsKapuskasing: Water Distribution System (pipes, hydrants, valves etc.), 50 yearsKenora: Water Mains - Cast Iron, 50 yearsKingston: Water Utility - Water Pipes: DI, 50 yearsKingston: Water Utility - Water Pipes: Asbestos Cement, 50 yearsKingston: Water Utility - Water Other: Water valves, 50 yearsKirkland Lake: Water Distribution System (pipes, hydrants, valves etc.), 50 yearsLondon: Valves, 50 yearsLondon: Hydrants, 50 yearsMeaford: Valve Chamber, 50 yearsMeaford: Linear - Valves - Pressure Release, 50 yearsMeaford: Linear - Valves - Globe, 50 yearsQuinte West: Water Mains - Cast Iron, 50 yearsThe Blue Mountains: Valve Chamber, 50 yearsTrent Lakes: Water - Valves, 50 yearsWelland: Water Systems (by component) - Water Services (includes fittings), 50 yearsBarrie: Watermain - Ductile Iron, 60 yearsBarrie: Watermain - Plastic, 60 yearsBarrie: Watermain - Stainless Steel, 60 yearsGreater Sudbury: Cast Iron Watermain, 60 yearsGreater Sudbury: Hydrants, 60 yearsGreater Sudbury: Service Connection, 60 yearsKenora: Water Mains - Ductile Iron, 60 yearsKingston: Water Utility - Water Pipes: Concrete, 60 yearsKingston: Water Utility - Water Other: Water hydrants, 60 yearsLondon: Service Connections, 60 yearsLondon: Chambers (main diameter <= 450mm ), 60 yearsLondon: Chambers (main diameter > 450mm), 60 yearsLondon: Pressure Release Valve, 60 yearsPrince Edward: Water - Laterals/Connections (Pooled), 60 yearsQuinte West: Hydrants, 60 yearsRainy River: Water lines/Hydrants, 60 yearsSarnia: Water Distribution, 60 yearsSevern: Infrastructure - Water & Sewer - Hydrants, 60 yearsTrent Lakes: Water - Mains, 60 yearsWelland: Water Systems (by component) - Hydrant Assemblies, 60 yearsKingston: Water Utility - Water Pipes: Average, 64 yearsGreater Sudbury: Maint. Hole & Chamber, 70 yearsKingston: Water Utility - Water Pipes: HDPE, 70 yearsPrince Edward: Water - Hydrants (Pooled), 70 yearsPrince Edward: Water - Hydrants - Leads (Pooled), 70 yearsAmherstburg: Other - Pooled Assets - Fire Hydrants, 75 yearsBarrie: Watermain - Ductile Iron with Cathodic Protection, 75 yearsBarrie: Watermain - Asbestos Cement, 75 yearsGrey Highlands: Watermain Pipe, 75 yearsKenora: Water Mains - PVC, 75 yearsKenora: Water Mains - PE, 75 yearsKenora: Water Mains - Valves, 75 yearsKenora: Water Mains - Hydrants, 75 yearsKenora: Booster Stations, 75 yearsKingston: Water Utility - Water Facilities: Tankage, 75 yearsKingston: Water Utility - Water Pipes: CI, 75 yearsBarrie: Watermain - Cast Iron, 80 yearsBarrie: Watermain - Copper, 80 yearsBrockton: Waterworks - Watermains, 80 yearsGreater Sudbury: HDPE Watermain, 80 yearsKingston: Water Utility - Water Pipes: PVC, 80 yearsLondon: Distribution Mains, 80 yearsQuinte West: Water Mains - Polyethylene, 80 yearsSevern: Infrastructure - Water & Sewer - Valves, 80 yearsWelland: Water Systems (by component) - Water Mains (includes valves & fittings), 80 yearsWelland: Water Systems (by component) - Chambers & Vaults (for valves & meters), 80 yearsBarrie: Watermain - High Density Polyethylene, 90 yearsBarrie: Watermain - PVC, 90 yearsBarrie: Watermain - Concrete, 90 yearsLondon: Transmission Mains, 90 yearsGreater Sudbury: Concrete Watermain, 95 yearsLondon: Storage Reservoirs, 96 yearsAmherstburg: Infrastructure - Water - Watermains, 100 yearsGreater Sudbury: PVC Watermain, 105 yearsMeaford: Linear - Valves - Power Actuated, 20–30 yearsCentre Hastings: Water infrastructure, 40–60 yearsMeaford: Linear - Fire Hydrant, 50–60 yearsOrillia: Land Improvement (Infrastructure) - Reservoirs, 50–60 yearsMeaford: Linear - Valves - Valve Chamber, 50–80 yearsMeaford: Linear - Valves - Maintenance Hatch, 50–80 yearsToronto: Conveyance - Linear Infrastructure (Transmission & Distribution), 50–100 yearsPrince Edward: Water - Water Mains, 60–80 years020406080100120

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 98 stated lives
MunicipalityAs writtenYearsKindSource
SarniaWater Pumping Stations - mechanical/equipment15accountingp1
The Blue MountainsLinear - Fire Hydrants20accountingp12 · 2019
MeafordLinear - Valves - Power Actuated20–30accountingp19 · 2020
MeafordLinear - Valves - Gate25accountingp19 · 2020
MeafordLinear - Valves - Air Release25accountingp19 · 2020
OrilliaRoads: Hydrants25accountingp22
SarniaWater Pumping Stations - pumps25accountingp1
BarrieWatermain - Galvanized30planningp148 · 2025
Rainy RiverWater valves/services30accountingp11 · 2010
LondonPump Stations (Including Rechlorination)35planningp70 · 2023
ChappleFire Hydrants40accountingp1
Greater SudburySystem Valve40planningp26 · 2023
Prince EdwardWater - Valves (Pooled)40accountingp34 · 2022
SarniaFire Hydrants40accountingp2
Centre HastingsWater infrastructure40–60accountingp5
AmherstburgInfrastructure - Water - Water Tower50accountingp7 · 2026
BarrieWatermain - Cross linked Polyethylene50planningp148 · 2025
BarrieWatermain - Steel50planningp148 · 2025
BarrieWatermain - Cured-in-Place-Pipe (Lining)50planningp148 · 2025
Grey HighlandsHydrants50accountingp10 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Water Tower50accountingp11 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Valve Chamber50accountingp11 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Clearwell50accountingp11 · 2026
KapuskasingWater Distribution System (pipes, hydrants, valves etc.)50accountingp15 · 2009
KenoraWater Mains - Cast Iron50accountingp17 · 2026
KingstonWater Utility - Water Pipes: DI50accountingp15 · 2016
KingstonWater Utility - Water Pipes: Asbestos Cement50accountingp15 · 2016
KingstonWater Utility - Water Other: Water valves50accountingp15 · 2016
Kirkland LakeWater Distribution System (pipes, hydrants, valves etc.)50accountingp10 · 2020
LondonValves50planningp70 · 2023
LondonHydrants50planningp70 · 2023
MeafordValve Chamber50accountingp18 · 2020
MeafordLinear - Valves - Pressure Release50accountingp19 · 2020
MeafordLinear - Valves - Globe50accountingp19 · 2020
Quinte West · same tableWater Mains - Cast Iron50accountingp37, p37 · 2024
The Blue MountainsValve Chamber50accountingp11 · 2019
Trent LakesWater - Valves50accountingp10 · 2009
WellandWater Systems (by component) - Water Services (includes fittings)50accountingp9 · 2021
MeafordLinear - Fire Hydrant50–60accountingp19 · 2020
OrilliaLand Improvement (Infrastructure) - Reservoirs50–60accountingp22
MeafordLinear - Valves - Valve Chamber50–80accountingp19 · 2020
MeafordLinear - Valves - Maintenance Hatch50–80accountingp19 · 2020
TorontoConveyance - Linear Infrastructure (Transmission & Distribution)50–100planningp355 · 2025
BarrieWatermain - Ductile Iron60planningp148 · 2025
BarrieWatermain - Plastic60planningp148 · 2025
BarrieWatermain - Stainless Steel60planningp148 · 2025
Greater SudburyCast Iron Watermain60planningp26 · 2023
Greater SudburyHydrants60planningp26 · 2023
Greater SudburyService Connection60planningp26 · 2023
KenoraWater Mains - Ductile Iron60accountingp17 · 2026
KingstonWater Utility - Water Pipes: Concrete60accountingp15 · 2016
KingstonWater Utility - Water Other: Water hydrants60accountingp15 · 2016
LondonService Connections60planningp70 · 2023
LondonChambers (main diameter <= 450mm )60planningp70 · 2023
LondonChambers (main diameter > 450mm)60planningp70 · 2023
LondonPressure Release Valve60planningp70 · 2023
Prince EdwardWater - Laterals/Connections (Pooled)60accountingp34 · 2022
Quinte WestHydrants60accountingp37 · 2024
Rainy RiverWater lines/Hydrants60accountingp11 · 2010
SarniaWater Distribution60accountingp2
SevernInfrastructure - Water & Sewer - Hydrants60accountingp402 · 2019
Trent LakesWater - Mains60accountingp10 · 2009
WellandWater Systems (by component) - Hydrant Assemblies60accountingp9 · 2021
Prince EdwardWater - Water Mains60–80accountingp34 · 2022
KingstonWater Utility - Water Pipes: Average64accountingp15 · 2016
Greater SudburyMaint. Hole & Chamber70planningp26 · 2023
KingstonWater Utility - Water Pipes: HDPE70accountingp15 · 2016
Prince EdwardWater - Hydrants (Pooled)70accountingp34 · 2022
Prince EdwardWater - Hydrants - Leads (Pooled)70accountingp34 · 2022
AmherstburgOther - Pooled Assets - Fire Hydrants75accountingp8 · 2026
BarrieWatermain - Ductile Iron with Cathodic Protection75planningp148 · 2025
BarrieWatermain - Asbestos Cement75planningp148 · 2025
Grey HighlandsWatermain Pipe75accountingp10 · 2026
KenoraWater Mains - PVC75accountingp17 · 2026
KenoraWater Mains - PE75accountingp17 · 2026
KenoraWater Mains - Valves75accountingp17 · 2026
KenoraWater Mains - Hydrants75accountingp17 · 2026
KenoraBooster Stations75accountingp17 · 2026
KingstonWater Utility - Water Facilities: Tankage75accountingp15 · 2016
KingstonWater Utility - Water Pipes: CI75accountingp15 · 2016
BarrieWatermain - Cast Iron80planningp148 · 2025
BarrieWatermain - Copper80planningp148 · 2025
BrocktonWaterworks - Watermains80accountingp2 · 2009
Greater SudburyHDPE Watermain80planningp26 · 2023
KingstonWater Utility - Water Pipes: PVC80accountingp15 · 2016
LondonDistribution Mains80planningp70 · 2023
Quinte West · same tableWater Mains - Polyethylene80accountingp37, p37, p37, p37, p37 · 2024
SevernInfrastructure - Water & Sewer - Valves80accountingp402 · 2019
WellandWater Systems (by component) - Water Mains (includes valves & fittings)80accountingp9 · 2021
WellandWater Systems (by component) - Chambers & Vaults (for valves & meters)80accountingp9 · 2021
BarrieWatermain - High Density Polyethylene90planningp148 · 2025
BarrieWatermain - PVC90planningp148 · 2025
BarrieWatermain - Concrete90planningp148 · 2025
LondonTransmission Mains90planningp70 · 2023
Greater SudburyConcrete Watermain95planningp26 · 2023
LondonStorage Reservoirs96planningp70 · 2023
AmherstburgInfrastructure - Water - Watermains100accountingp7 · 2026
Greater SudburyPVC Watermain105planningp26 · 2023

Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON

Preventive maintenance

No maintenance tasks are sourced for this component yet.

Open questions

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Watermain, HDPE, v0.3.0. https://unfinished.one/c/watermain-hdpe/v/0.3.0

BibTeX

@misc{unfinished_watermain_hdpe_0_3_0,
  title = {Watermain, HDPE},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.3.0},
  url = {https://unfinished.one/c/watermain-hdpe/v/0.3.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.3.0, 0.2.0, 0.1.0