Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 50 years · CNA e-Tool Estimated Useful Life Table, p1 · HUD CNA 3.2.2.1 “Catch basins, inlets, culverts” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing. HUD's row also covers inlets and culverts. HUD's row is for site work at US multifamily properties, not municipal networks.
- 70 years · Greater Sudbury: Enterprise Asset Management Plan (2023), p30 · “Catch Basin” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 50 years · Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03, p10 · “Catch Basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p16 · “Storm Sewers - Catch Basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Prince Edward: FIN-12 Tangible Capital Assets Policy, p34 · “Storm - Catch basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Sarnia: Finance-04 Tangible Capital Asset Policy, Attachment No. 1: TCA Policy Appendix A, p2 · “Catch Basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide, p402 · “Infrastructure - Water & Sewer - Catch Basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide, p402 · “Infrastructure - Water & Sewer - Double Catch Basins” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for storm sewer (G3030)
26 municipalities in Ontario state a life for storm sewer as a whole, in 26 distinct tables: 20–150 years, median 50. 57 rows come from capital asset policies (accounting lives, used for amortization) and 43 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 99 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Kenora | Storm Sewers - Culvert - STL | 20 | accounting | p16 · 2026 |
| Severn | Infrastructure - Roads - Ditches | 20 | accounting | p402 · 2019 |
| Barrie | Low Impact Development | 25 | planning | p127 · 2025 |
| Greater Sudbury | Ponds | 25 | planning | p30 · 2023 |
| Kapuskasing | Culverts - Steel | 25 | accounting | p15 · 2009 |
| Kenora | Storm Sewers - Pipe - STL | 25 | accounting | p16 · 2026 |
| London | SWM Green Infrastructure | 25 | planning | p127 · 2023 |
| Meaford | Linear - Road Surface - Asphalt - Ditch | 25 | accounting | p20 · 2020 |
| Severn | Infrastructure - Roads - Major Culverts | 25 | accounting | p402 · 2019 |
| The Blue Mountains | Linear - Road Top - Asphalt - Ditch | 25 | accounting | p12 · 2019 |
| Meaford | Linear - Culverts - Corrugated Steel | 25–40 | accounting | p19 · 2020 |
| Greater Sudbury | CSP Storm Sewer | 30 | planning | p30 · 2023 |
| Grey Highlands | Culverts | 30–40 | accounting | p10 · 2026 |
| York | Corrugated steel pipe culverts: Replacement | 35 | planning | p53 · 2024 |
| York | Storm pipe replacement | 35–75 | planning | p53 · 2024 |
| York | Outfall replacement | 35–75 | planning | p53 · 2024 |
| York | Culverts under three metres: Replacement or relining | 35–75 | planning | p53 · 2024 |
| Halton | Stormwater Pumping Stations | 39 | planning | p110 · 2025 |
| Brockton | Storm Drains - Metal - Corrugated | 40 | accounting | p3 · 2009 |
| Chapple | Culverts - steel | 40 | accounting | p1 |
| Essex | Stormwater Mains | 40 | planning | p74 · 2025 |
| Kirkland Lake | Culverts | 40 | accounting | p10 · 2020 |
| Meaford | Linear - Stormwater Facility | 40 | accounting | p19 · 2020 |
| Rainy River | Drainage | 40 | accounting | p11 · 2010 |
| Severn | Buildings/Structures - Water & Sewer - Intake Outfall Line | 40 | accounting | p400 · 2019 |
| The Blue Mountains | Linear - Culverts - Corrugated Steel | 40 | accounting | p12 · 2019 |
| The Blue Mountains | Linear - Stormwater Facility | 40 | accounting | p12 · 2019 |
| The Blue Mountains | Linear - Road Base - Asphalt - Ditch | 40 | accounting | p12 · 2019 |
| Trent Lakes | Culverts | 40 | accounting | p10 · 2009 |
| Amherstburg | Infrastructure - Storm Water - Stormwater System | 50 | accounting | p7 · 2026 |
| Barrie | Storm Sewers (Steel) | 50 | planning | p127 · 2025 |
| Barrie | Culverts (Remaining Assets) | 50 | planning | p127 · 2025 |
| Barrie | Filtration Devices | 50 | planning | p127 · 2025 |
| Barrie | Sediment Removal Devices | 50 | planning | p127 · 2025 |
| Greater Madawaska, Quinte West · same table | Culverts | 50 | accounting | p17, p37 · 2025 |
| Greater Sudbury | Oil and Grit Separators | 50 | planning | p30 · 2023 |
| Grey Highlands | Catch Basins | 50 | accounting | p10 · 2026 |
| Kapuskasing | Storm Sewer System - PVC / CI | 50 | accounting | p15 · 2009 |
| Kapuskasing | Storm Sewer System - Concrete | 50 | accounting | p15 · 2009 |
| Kenora | Storm Sewers - Pipe - Conc/PE/PVC | 50 | accounting | p16 · 2026 |
| Kenora | Storm Sewers - Culvert - PE/PVC | 50 | accounting | p16 · 2026 |
| Kenora | Storm Sewers - Manholes | 50 | accounting | p16 · 2026 |
| Kenora | Storm Sewers - Catch Basins | 50 | accounting | p16 · 2026 |
| Kingston | Roads and Related - Storm sewer | 50 | accounting | p15 · 2016 |
| Kirkland Lake | Storm Sewer System - PVC / CI, Concrete | 50 | accounting | p10 · 2020 |
| London | Minor Culverts (between 1.8m to 3m span) | 50 | planning | p158 · 2023 |
| London | Major Culverts (greater than and equal to 3m span) | 50 | planning | p158 · 2023 |
| Meaford | Linear - Road Base - Asphalt - Ditch | 50 | accounting | p19 · 2020 |
| Prince Edward | Storm - Storm Mains (Pooled) | 50 | accounting | p34 · 2022 |
| Prince Edward | Storm - Catch basins | 50 | accounting | p34 · 2022 |
| Prince Edward | Storm - Outlets | 50 | accounting | p34 · 2022 |
| Sarnia | Catch Basins | 50 | accounting | p2 |
| Severn | Infrastructure - Water & Sewer - Catch Basins | 50 | accounting | p402 · 2019 |
| Severn | Infrastructure - Water & Sewer - Double Catch Basins | 50 | accounting | p402 · 2019 |
| Severn | Infrastructure - Water & Sewer - Catch Basin Manhole | 50 | accounting | p403 · 2019 |
| Severn | Infrastructure - Water & Sewer - Double Catch Basin Manhole | 50 | accounting | p403 · 2019 |
| Severn | Infrastructure - Water & Sewer - Storm Manhole | 50 | accounting | p403 · 2019 |
| Severn | Infrastructure - Water & Sewer - Storm Sewers | 50 | accounting | p403 · 2019 |
| Simcoe | Stormwater Outlets | 50 | planning | p92 · 2025 |
| Simcoe | Stormwater Sewers | 50 | planning | p92 · 2025 |
| Simcoe | Stormwater Ponds | 50 | planning | p92 · 2025 |
| Simcoe | Storm Ponds | 50 | accounting | p21 · 2025 |
| Simcoe | Storm Sewers | 50 | accounting | p21 · 2025 |
| Simcoe | Structural Culverts | 50 | accounting | p21 · 2025 |
| York | Oil grit separator replacement | 50 | planning | p53 · 2024 |
| Meaford | Linear - Culverts - HDPE / PVC | 50–80 | accounting | p19 · 2020 |
| Toronto | Conveyance - Linear Infrastructure (Local & Trunk Sewers) | 50–150 | planning | p379 · 2025 |
| Greater Sudbury | AC Sewer | 55 | planning | p30 · 2023 |
| Essex | Culverts | 60 | planning | p60 · 2025 |
| London | Minor Culverts (Up to 1.8m in diameter) | 60 | planning | p127 · 2023 |
| Quinte West | Storm Water Ponds | 60 | accounting | p38 · 2024 |
| Rainy River | Sewer/Storm Sewer | 60 | accounting | p11 · 2010 |
| Sarnia | Storm Sewers | 60 | accounting | p2 |
| York | Maintenance hole replacement | 60 | planning | p53 · 2024 |
| York | Catch basin and ditch inlet replacement | 60 | planning | p53 · 2024 |
| Greater Sudbury | Catch Basin | 70 | planning | p30 · 2023 |
| Greater Sudbury | Maintenance Hole | 70 | planning | p30 · 2023 |
| Kapuskasing | Culverts - Concrete | 70 | accounting | p15 · 2009 |
| Barrie | Storm Sewers (Remaining Assets) | 75 | planning | p127 · 2025 |
| Barrie | Culverts (Concrete) | 75 | planning | p127 · 2025 |
| Brockton | Storm Drains - Plastic | 75 | accounting | p3 · 2009 |
| Brockton | Storm Drains - Concrete | 75 | accounting | p3 · 2009 |
| Grey Highlands | Storm Sewers Pipe | 75 | accounting | p10 · 2026 |
| Kingston | Land Improvements - Storm water ponds | 75 | accounting | p14 · 2016 |
| Meaford | Linear - Culverts - Concrete | 75 | accounting | p19 · 2020 |
| Simcoe | Culverts - Concrete | 75 | planning | p68 · 2025 |
| Simcoe | Culverts - Corrugated Steel | 75 | planning | p68 · 2025 |
| The Blue Mountains | Linear - Culverts - Concrete | 75 | accounting | p12 · 2019 |
| York | Concrete culverts: Replacement | 75 | planning | p53 · 2024 |
| Greater Sudbury | HDPE Storm Sewer | 80 | planning | p30 · 2023 |
| London | Minor Treatment | 80 | planning | p127 · 2023 |
| Welland | Sanitary & Storm Sewers (by component) - Catchbasins & Leads | 80 | accounting | p9 · 2021 |
| Greater Sudbury | Concrete Sewer | 90 | planning | p30 · 2023 |
| Barrie | Storm Sewers (Asbestos Cement, Vitrified Clay) | 100 | planning | p127 · 2025 |
| London | Storm sewers <450mm diameter | 100 | planning | p127 · 2023 |
| London | Storm sewers 450mm>= to <1,500mm diameter | 100 | planning | p127 · 2023 |
| London | Storm sewers >=1,500 mm diameter | 100 | planning | p127 · 2023 |
| London | Open Conveyance | 100 | planning | p127 · 2023 |
| London | Storm Water Management Facilities | 100 | planning | p127 · 2023 |
Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON
Preventive maintenance
No maintenance tasks are sourced for this component yet.
Open questions
- HUD gives planning lives for US multifamily housing; the municipal rows are Ontario accounting lives. Neither is observed replacement data.
- No preventive maintenance tasks are sourced yet.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Catch basin, v0.3.0. https://unfinished.one/c/catch-basin/v/0.3.0BibTeX
@misc{unfinished_catch_basin_0_3_0,
title = {Catch basin},
author = {{unfinished.one}},
year = {2026},
version = {0.3.0},
url = {https://unfinished.one/c/catch-basin/v/0.3.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.3.0, 0.2.0, 0.1.0