Uniformat G2010
Curb and gutter, concrete
Also called curb, concrete curb
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 50 years · CNA e-Tool Estimated Useful Life Table, p1 · HUD CNA 3.2.4.5 “Curbing, Concrete” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing. HUD's row is for site work at US multifamily properties, not municipal networks.
- 35 years · Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03, p10 · “Concrete Curb” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 30 years · Prince Edward: FIN-12 Tangible Capital Assets Policy, p34 · “Curb and Gutter” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 35 years · Quinte West: A09-POLICY-0034 Tangible Capital Asset Policy, p36 · “Roads - Curbs and Gutters” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 40 years · Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide, p402 · “Infrastructure - Roads - Curbs” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal accounting lives for roadways (G2010)
21 municipal policies from Ontario set a life for roadways as a whole, from 20 distinct tables: 3–100 years, median 35. These are amortization periods chosen for accounting, not measured lives, and they describe the system rather than this component.
Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.
All 103 stated lives
| Municipality | As written | Years | Source |
|---|---|---|---|
| Meaford | Linear - Road Surface - Surface Treatment | 3–7 | p20 · 2020 |
| Kapuskasing | Roads Surface - Surface Treated | 5 | p15 · 2009 |
| The Blue Mountains | Linear - Road Top - Surface Treatment | 6 | p12 · 2019 |
| Prince Edward | Roads - Surface - Gravel | 8 | p34 · 2022 |
| Prince Edward | Roads - Surface - Paved - LCB | 8 | p34 · 2022 |
| Trent Lakes | Roads - Surface Treatment (LCB) | 8 | p10 · 2009 |
| Chapple | Roads Hard Surface - tar & chip (low bituminous) | 10 | p1 |
| Grey Highlands | Surface Treatment | 10 | p10 · 2026 |
| Kapuskasing | Roads Surface - Gravel / Asphalt | 10 | p15 · 2009 |
| Kenora | Road Network - Gravel | 10 | p16 · 2026 |
| Rainy River | Roads - tar and Chip | 10 | p12 · 2010 |
| Greater Madawaska | Roads - Surface Treatment (LCB) | 15 | p16 · 2025 |
| Kenora | Road Network - Surface Treated | 15 | p16 · 2026 |
| Kenora | Bridges - Substructure | 15 | p16 · 2026 |
| Severn | Infrastructure - Roads - G Roads | 15 | p402 · 2019 |
| Quinte West | Bridges - Wearing (Asphalt, Wood) | 15–20 | p37 · 2024 |
| Centre Hastings | Road surface | 15–25 | p5 |
| Kingston | Roads and Related - Urban road surface | 18 | p14 · 2016 |
| Kingston | Roads and Related - Semi-urban surface | 18 | p14 · 2016 |
| Kingston | Roads and Related - Rural road surface | 18 | p14 · 2016 |
| Amherstburg | Infrastructure - Transportation - Asphalt Road Surface | 20 | p7 · 2026 |
| Amherstburg | Infrastructure - Transportation - Tar and Chip Road Surface | 20 | p7 · 2026 |
| Brockton | Roads - Surface - Surface Treatment | 20 | p2 · 2009 |
| Chapple | Roads Hard Surface - Asphalt | 20 | p1 |
| Grey Highlands | Asphalt Road Surface | 20 | p10 · 2026 |
| Grey Highlands | Granular A Base | 20 | p10 · 2026 |
| Prince Edward | Roads - Surface - Paved - HCB | 20 | p34 · 2022 |
| Quinte West · same table | Roads - Asphalt Surface (HDB;LCB) | 20 | p36, p36 · 2024 |
| Rainy River | Roads - Asphalt | 20 | p12 · 2010 |
| Sarnia | Land Improvements - Paving | 20 | p1 |
| Severn | Infrastructure - Roads - LCB Roads | 20 | p402 · 2019 |
| Severn | Infrastructure - Roads - Bridges - Deck | 20 | p402 · 2019 |
| Amherstburg | Infrastructure - Transportation - Concrete Road Surface | 25 | p7 · 2026 |
| Brockton | Bridges - Deck | 25 | p2 · 2009 |
| Chapple | Site Works - Asphalt etc. | 25 | p1 |
| Greater Madawaska | Roads - Asphalt Surface (HL4) | 25 | p16 · 2025 |
| Kenora | Road Network - Paved | 25 | p16 · 2026 |
| Severn | Infrastructure - Roads - HCB Roads | 25 | p402 · 2019 |
| Trent Lakes | Roads - Asphalt (HCB) | 25 | p10 · 2009 |
| Welland | All Roads (by component) - Paved road surface | 25 | p9 · 2021 |
| Welland | Bridges (by component) - Bridge Deck - treated as paved road surface | 25 | p9 · 2021 |
| Meaford | Linear - Bridges - Superstructure | 25–75 | p19 · 2020 |
| Amherstburg | Infrastructure - Transportation - Bridges/Culverts/Sidewalks | 30 | p7 · 2026 |
| Grey Highlands | Asphalt Curb | 30 | p10 · 2026 |
| Meaford | Linear - Bridges - Wearing Surface | 30 | p19 · 2020 |
| Meaford | Linear - Road Surface - Asphalt - Curb | 30 | p20 · 2020 |
| Prince Edward | Curb and Gutter | 30 | p34 · 2022 |
| Prince Edward | Curb Stops (Pooled) | 30 | p34 · 2022 |
| The Blue Mountains | Linear - Road Base - Gravel | 30 | p12 · 2019 |
| The Blue Mountains | Linear - Road Top - Asphalt - Curb | 30 | p12 · 2019 |
| Welland | All Roads (by component) - Road bed - unpaved | 30 | p9 · 2021 |
| Brockton | Roads - Surface - Hot Mix - HCB | 35 | p2 · 2009 |
| Grey Highlands | Concrete Curb | 35 | p10 · 2026 |
| Quinte West · same table | Roads - Base | 35 | p36, p36 · 2024 |
| Amherstburg | Infrastructure - Transportation - Road Reconstruction | 40 | p7 · 2026 |
| Greater Madawaska | Roads - Base | 40 | p16 · 2025 |
| Prince Edward | Bridges & Culverts - Bridge - Deck | 40 | p34 · 2022 |
| Severn | Infrastructure - Roads - Curbs | 40 | p402 · 2019 |
| Simcoe | Road Segment - Reconstruction | 40 | p21 · 2025 |
| The Blue Mountains | Linear - Road Base - Surface Treatment | 40 | p12 · 2019 |
| Orillia | Bridge Component: Prestressed Concrete/Steel without Truss | 45 | p23 |
| Sarnia | Bridges | 45 | p2 |
| Brockton | Bridges - Super-Structures | 50 | p2 · 2009 |
| Centre Hastings | Road base | 50 | p5 |
| Grey Highlands | Granular B Base | 50 | p10 · 2026 |
| Kenora | Bridges - Superstructure | 50 | p16 · 2026 |
| Kingston | Roads and Related - Urban road bed | 50 | p14 · 2016 |
| Kingston | Roads and Related - Semi-urban bed | 50 | p14 · 2016 |
| Kingston | Roads and Related - Rural road bed | 50 | p14 · 2016 |
| Kirkland Lake | Roads Surface | 50 | p10 · 2020 |
| Kirkland Lake | Bridges | 50 | p10 · 2020 |
| Meaford | Linear - Road Base - Surface Treatment | 50 | p19 · 2020 |
| Meaford | Linear - Road Base - Gravel | 50 | p19 · 2020 |
| Orillia | Bridge Component: Structure/Steel with Truss | 50 | p23 |
| Prince Edward | Roads - Base | 50 | p34 · 2022 |
| Sarnia | Roads - Arterial | 50 | p2 |
| Sarnia | Roads - Local | 50 | p2 |
| Severn | Infrastructure - Roads - Bridges - Structures | 50 | p402 · 2019 |
| The Blue Mountains | Linear - Road Base - Asphalt - Curb | 50 | p12 · 2019 |
| Welland | All Roads (by component) - Road bed - paved | 50 | p9 · 2021 |
| Greater Madawaska, Quinte West · same table | Bridges - Deck (Wood, Concrete) | 50–75 | p16, p17, p36, p36 · 2025 |
| Grey Highlands | Bridges | 50–75 | p10 · 2026 |
| Meaford | Linear - Bridges - Substructure | 50–75 | p19 · 2020 |
| Kingston | Bridges - Bridge structures | 60 | p15 · 2016 |
| Kingston | Bridges - Box and arch culverts | 60 | p15 · 2016 |
| Prince Edward | Bridges & Culverts - Culverts | 60 | p34 · 2022 |
| Trent Lakes | Roads - Base | 60 | p10 · 2009 |
| Brockton | Bridges - Footings | 75 | p2 · 2009 |
| Brockton | Bridges - Whole | 75 | p2 · 2009 |
| Kapuskasing | Bridges - Constructed | 75 | p15 · 2009 |
| Prince Edward | Bridges & Culverts - Bridge- Structure | 75 | p34 · 2022 |
| Simcoe | Bridges | 75 | p21 · 2025 |
| The Blue Mountains | Linear - Bridges | 75 | p12 · 2019 |
| Welland | Bridges (by component) - Bridge Superstructure | 75 | p9 · 2021 |
| Welland | Bridges (by component) - Culverts | 75 | p9 · 2021 |
| Brockton | Roads - Base - Urban | 80 | p2 · 2009 |
| Brockton | Roads - Base - Rural | 80 | p2 · 2009 |
| Chapple | Bridges | 80 | p1 |
| Chapple | Roads - gravel | 80 | p1 |
| Meaford | Linear - Road Base - Asphalt - Curb | 80 | p19 · 2020 |
| Rainy River | Roads - base | 80 | p11 · 2010 |
| Rainy River | Roads - Gravel | 80 | p11 · 2010 |
| Orillia | Bridge Component: Abutments | 100 | p23 |
Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON
Preventive maintenance
No maintenance tasks are sourced for this component yet.
Open questions
- HUD gives planning lives for US multifamily housing; the municipal rows are Ontario accounting lives. Neither is observed replacement data.
- No preventive maintenance tasks are sourced yet.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Curb and gutter, concrete, v0.2.0. https://unfinished.one/c/curb-gutter/v/0.2.0BibTeX
@misc{unfinished_curb_gutter_0_2_0,
title = {Curb and gutter, concrete},
author = {{unfinished.one}},
year = {2026},
version = {0.2.0},
url = {https://unfinished.one/c/curb-gutter/v/0.2.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0