Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 80 years · Brockton: Policy F06-2009-03 Capital Asset Amortization, p2 · “Sewer Lines - Concrete” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 100 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p18 · “Wastewater Mains - Concrete” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 60 years · Kingston: Tangible Capital Assets Policy, p16 · “Sewer Utility - Sewer pipes: Concrete” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 80 years · Quinte West: A09-POLICY-0034 Tangible Capital Asset Policy, p37 · “Sanitary Sewer Mains - Concrete” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 80 years · Quinte West: A09-POLICY-0034 Tangible Capital Asset Policy, p37 · “Sanitary Sewer Mains - Reinforced Concrete (RC)” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal accounting lives for sanitary sewer (G3020)
18 municipal policies from Ontario set a life for sanitary sewer as a whole, from 18 distinct tables: 15–100 years, median 62. These are amortization periods chosen for accounting, not measured lives, and they describe the system rather than this component.
Years. Each dot is one stated life and each bar a stated range; equal values stack. The dashed line is the median. Policies that copy the same table count once.
All 50 stated lives
| Municipality | As written | Years | Source |
|---|---|---|---|
| Sarnia | Wastewater Pumping Stations - mechanical/equipment | 15 | p1 |
| Kenora | Wastewater Mains - Metal | 25 | p18 · 2026 |
| Sarnia | Wastewater Pumping Stations - pumps | 25 | p1 |
| Rainy River | Building Improvements - Lift Station pumps/inlet pipes | 30 | p11 · 2010 |
| Severn | Buildings/Structures - Water & Sewer - Lift Station | 40 | p400 · 2019 |
| Severn | Buildings/Structures - Water & Sewer - Lagoon Structure | 40 | p400 · 2019 |
| Amherstburg | Infrastructure - Wastewater - Pump Stations | 50 | p7 · 2026 |
| Chapple | Site Works - Septic Systems & Wells etc. | 50 | p1 |
| Grey Highlands | Water & Wastewater Treatment Assets - Wet Well | 50 | p11 · 2026 |
| Grey Highlands | Water & Wastewater Treatment Assets - Dry Well | 50 | p11 · 2026 |
| Kapuskasing | Sanitary Sewer Collections System (pipes, force mains, etc) | 50 | p15 · 2009 |
| Kenora | Wastewater Mains - Clay Tile | 50 | p18 · 2026 |
| Kenora | Wastewater Mains - Manholes | 50 | p18 · 2026 |
| Kingston | Sewer Utility - Sewer pipes: DI | 50 | p16 · 2016 |
| Kingston | Sewer Utility - Sewer pipes: Asbestos Cement | 50 | p16 · 2016 |
| Kirkland Lake | Sanitary Sewer Collections System (pipes, force mains, etc) | 50 | p10 · 2020 |
| Meaford | Wet Well | 50 | p18 · 2020 |
| Meaford | Dry Well | 50 | p18 · 2020 |
| Orillia | Land Improvement (Infrastructure) - Lagoons and Inlet Structures | 50 | p22 |
| The Blue Mountains | Wet Well | 50 | p11 · 2019 |
| The Blue Mountains | Dry Well | 50 | p11 · 2019 |
| Centre Hastings | Sewer infrastructure | 60 | p5 |
| Kingston | Sewer Utility - Sewer pipes: Concrete | 60 | p16 · 2016 |
| Prince Edward | Sewer - Sanitary Laterals (Pooled) | 60 | p34 · 2022 |
| Prince Edward | Sewer - Manholes (Pooled) | 60 | p34 · 2022 |
| Prince Edward | Sewer - Sewer Mains | 60–80 | p34 · 2022 |
| Kingston | Sewer Utility - Sewer pipes: Average | 64 | p16 · 2016 |
| Kingston | Sewer Utility - Sewer pipes: HDPE | 70 | p16 · 2016 |
| Chapple | Lagoons | 75 | p1 |
| Grey Highlands | Sanitary Sewer Pipe | 75 | p10 · 2026 |
| Kenora | Wastewater Mains - PVC | 75 | p18 · 2026 |
| Kenora | Pumping / Lift Stations | 75 | p18 · 2026 |
| Kingston | Sewer Utility - Sewer Facilities: Tankage | 75 | p16 · 2016 |
| Kingston | Sewer Utility - Sewer pipes: CI | 75 | p16 · 2016 |
| Kingston | Sewer Utility - Sewer - manholes | 75 | p16 · 2016 |
| Rainy River | Sewage Lagoon Cells | 75 | p11 · 2010 |
| Brockton | Sewer Lines - Concrete | 80 | p2 · 2009 |
| Brockton | Sewer Lines - Brick | 80 | p2 · 2009 |
| Brockton | Sewer Lines - Metal | 80 | p2 · 2009 |
| Kingston | Sewer Utility - Sewer pipes: PVC | 80 | p16 · 2016 |
| Quinte West · same table | Sanitary Sewer Mains - Polyethylene | 80 | p37, p37, p37, p37, p37, p38, p38 · 2024 |
| Severn | Infrastructure - Water & Sewer - Sanitary Sewers | 80 | p403 · 2019 |
| Welland | Sanitary & Storm Sewers (by component) - Sewers Mains & Tunnels (Storm/Sanitary/Combined) | 80 | p9 · 2021 |
| Welland | Sanitary & Storm Sewers (by component) - Pipe & Tunnel Linings | 80 | p9 · 2021 |
| Welland | Sanitary & Storm Sewers (by component) - Laterals (includes fittings) | 80 | p9 · 2021 |
| Welland | Sanitary & Storm Sewers (by component) - Manholes, Shafts & Chambers | 80 | p9 · 2021 |
| Amherstburg | Infrastructure - Wastewater - Sewer Mains | 100 | p7 · 2026 |
| Brockton | Sewer Lines - Polyethylene (PVC) | 100 | p3 · 2009 |
| Kenora | Wastewater Mains - Concrete | 100 | p18 · 2026 |
| Kenora | Wastewater Mains - PE | 100 | p18 · 2026 |
Each row was matched to its page automatically: the label and the number appear in the text of the cited page. An editor has not yet compared every row with the table, so follow the page link before relying on one. About the policies · All approved rows as JSON
Preventive maintenance
No maintenance tasks are sourced for this component yet.
Open questions
- These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
- No preventive maintenance tasks are sourced yet.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Sanitary sewer, concrete, v0.1.0. https://unfinished.one/c/sanitary-sewer-concrete/v/0.1.0BibTeX
@misc{unfinished_sanitary_sewer_concrete_0_1_0,
title = {Sanitary sewer, concrete},
author = {{unfinished.one}},
year = {2026},
version = {0.1.0},
url = {https://unfinished.one/c/sanitary-sewer-concrete/v/0.1.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.1.0