unfinished.one

Uniformat B2030

Automatic entrance door

Also called auto door, sliding door, door operator

  • Confidence C
  • Version 0.2.0 (permanent link)
  • Reviewed 2026-10-22

Service life

30 yearsas stated by one source
051015202530353030

Years in service. One stated life so far; the band will widen as sources are added.

One source. This value rests on a single document (CNA e-Tool Estimated Useful Life Table, p7). Treat it as that source's figure, not a settled life, until others confirm it.

Basis

  • 30 years · CNA e-Tool Estimated Useful Life Table, p7 · HUD CNA 3.3.2.8.7 “Automatic Entry Doors” — U.S. Department of Housing and Urban Development (planning life)
    Same life for family and elderly properties. US multifamily housing.

How sources are chosen and recorded: sourcing policy.

Municipal lives for exterior enclosure (B20)

23 municipalities in Ontario, British Columbia and Alberta state a life for exterior enclosure as a whole, in 18 distinct tables: 10–85 years, median 30. 33 rows come from capital asset policies (accounting lives, used for amortization) and 6 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 30 yearsTrent Lakes: Exterior Shell - Wood Finishing maintenance, 10 yearsTelkwa: Exterior Envelope, 20 yearsAmherstburg: Exterior Envelops - Roof, Windows, Doors, Concrete, 20 yearsHuron: Patrol Yards - Building Exterior, 20 yearsHuron: Property Services - Building Exterior, 20 yearsHuron: Housing - Building Exterior, 20 yearsHuron: Homes for the Aged - Exterior, 20 yearsLondon: Building Components - Shell (siding, windows, roofing), 20 yearsMeaford: Exterior Closure - Overhead Doors, 20 yearsSimcoe: Envelope, 20 yearsTrent Lakes: Exterior Shell - Windows, 20 yearsGrey Highlands: Windows & Doors, 25 yearsMeaford: Exterior Closure - Windows, 25 yearsThe Blue Mountains: Windows and Doors, 25 yearsTrent Lakes: Exterior Shell - Vinyl, 25 yearsParksville: Metal Cladding, 30 yearsLondon: Building Components - Interiors (partitions, doors), 30 yearsMeaford: Exterior Closure - Vinyl Siding, 30 yearsMeaford: Exterior Closure - Standard Doors, 30 yearsMeaford: Exterior Closure - Wood Cladding, 40 yearsTrent Lakes: Exterior Shell - Brick / Masonry/Steel, 40 yearsCanmore: Envelope, 50 yearsParksville: Exterior Wall, 50 yearsChapple: Building Improvements - Exterior Envelope, 50 yearsKenora: Buildings - Exterior Components, 50 yearsMeaford: Exterior Closure - Concrete Block, 50 yearsMeaford: Exterior Closure - Metal Cladding, 50 yearsRainy River: Building Improvements - Exterior Envelope, 50 yearsRainy River: Building Improvements - Exterior Envelope, 50 yearsHuron: Homes for the Aged - Building Envelope, 60 yearsFort St. James, Revelstoke and 3 more: Exterior Envelope, 30–40 yearsOkanagan-Similkameen: Exterior Envelope, 30–40 yearsSalmo: Exterior Envelope, 30–40 yearsGreater Madawaska and Quinte West: Shell - Other, 55–85 years020406080100

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 34 stated lives
MunicipalityAs writtenYearsKindSource
Trent LakesExterior Shell - Wood Finishing maintenance10accountingp10 · 2009
TelkwaExterior Envelope20accountingp8
AmherstburgExterior Envelops - Roof, Windows, Doors, Concrete20accountingp8 · 2026
HuronPatrol Yards - Building Exterior20planningp42 · 2025
HuronProperty Services - Building Exterior20planningp57 · 2025
HuronHousing - Building Exterior20planningp68 · 2025
HuronHomes for the Aged - Exterior20planningp77 · 2025
LondonBuilding Components - Shell (siding, windows, roofing)20accountingp2 · 2023
MeafordExterior Closure - Overhead Doors20accountingp17 · 2020
SimcoeEnvelope20accountingp19 · 2025
Trent LakesExterior Shell - Windows20accountingp10 · 2009
Grey HighlandsWindows & Doors25accountingp11 · 2026
MeafordExterior Closure - Windows25accountingp17 · 2020
The Blue MountainsWindows and Doors25accountingp11 · 2019
Trent LakesExterior Shell - Vinyl25accountingp10 · 2009
ParksvilleMetal Cladding30accountingp9 · 2023
LondonBuilding Components - Interiors (partitions, doors)30accountingp2 · 2023
MeafordExterior Closure - Vinyl Siding30accountingp17 · 2020
MeafordExterior Closure - Standard Doors30accountingp17 · 2020
Fort St. James, Revelstoke, Rossland, Sicamous, Tumbler Ridge · same tableExterior Envelope30–40accountingp5, p9, p7, p9, p5 · 2010
Okanagan-SimilkameenExterior Envelope30–40accountingp11 · 2023
SalmoExterior Envelope30–40accountingp6 · 2016
MeafordExterior Closure - Wood Cladding40accountingp17 · 2020
Trent LakesExterior Shell - Brick / Masonry/Steel40accountingp10 · 2009
CanmoreEnvelope50accountingp10 · 2025
ParksvilleExterior Wall50accountingp9 · 2023
ChappleBuilding Improvements - Exterior Envelope50accountingp1
KenoraBuildings - Exterior Components50accountingp15 · 2026
MeafordExterior Closure - Concrete Block50accountingp17 · 2020
MeafordExterior Closure - Metal Cladding50accountingp17 · 2020
Rainy RiverBuilding Improvements - Exterior Envelope50accountingp11 · 2010
Rainy RiverBuilding Improvements - Exterior Envelope50planningp17 · 2026
Greater Madawaska, Quinte West · same tableShell - Other55–85accountingp17, p38 · 2025
HuronHomes for the Aged - Building Envelope60planningp77 · 2025

Of 39 rows, 2 were compared with an image of their page; 37 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

7 tasks in 1 work order.

  1. 1
  2. 2
  3. 3Qtr
  4. 4
  5. 5
  6. 6Qtr
  7. 7
  8. 8
  9. 9Qtr
  10. 10
  11. 11
  12. 12Qtr

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Quarterly · 7 tasks

Source: Public Buildings Service Preventive Maintenance Guide (Public Buildings Maintenance Standards), ARCS-DOR-02-03M Door - Hydraulic, Electric or Pneumatic Operated

TaskPage
Check door alignment; inspect mountings, hinges, mats and weather strippingp26
Run door under power; check actuating and safety sensors and door speedp26
Check manual operationp26
Inspect power unit; lubricate and tighten linesp26
Check control board relays; clean or adjust contactsp26
Clean and lubricate door pivot pointsp26
On pneumatic or hydraulic operators, check operating pressuresp26

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • Only one source so far: HUD planning lives for US multifamily housing. Canadian and observed sources are needed.
  • Written for GSA contracted O&M in US federal buildings; job plans are generic and defer to manufacturer instructions, and the fire extinguisher plans only point to NFPA 10.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Automatic entrance door, v0.2.0. https://unfinished.one/c/door-automatic/v/0.2.0

BibTeX

@misc{unfinished_door_automatic_0_2_0,
  title = {Automatic entrance door},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.2.0},
  url = {https://unfinished.one/c/door-automatic/v/0.2.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0