Uniformat D5090
Emergency lighting unit
Also called battery pack, emergency light
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 5–10 years · CNA e-Tool Estimated Useful Life Table, p15 · HUD CNA 3.6.2.6 “Emergency lights, illuminated signs” — U.S. Department of Housing and Urban Development (planning life)Family properties 5 years, elderly 10. US multifamily housing.
- 20 years · Meaford: By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives, p17 · “Electrical - Emergency Lighting” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for electrical (D50)
39 municipalities in Ontario, British Columbia and Alberta state a life for electrical as a whole, in 30 distinct tables: 10–50 years, median 20. 47 rows come from capital asset policies (accounting lives, used for amortization) and 7 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 45 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Kingston | Electrical Equipment | 10 | accounting | p15 · 2016 |
| Grey Highlands | Exterior Lighting | 15 | accounting | p11 · 2026 |
| Meaford | Electrical - Exterior Lighting | 15 | accounting | p17 · 2020 |
| The Blue Mountains | Exterior Lighting | 15 | accounting | p11 · 2019 |
| Fort St. James, Revelstoke, Rossland, Sicamous, Tumbler Ridge · same table | Electrical/Plumbing/Fire | 15–20 | accounting | p5, p9, p7, p9, p5 · 2010 |
| Okanagan-Similkameen | Electrical/Plumbing/Fire | 15–20 | accounting | p11 · 2023 |
| Salmo | Electrical/Plumbing/Fire | 15–20 | accounting | p6 · 2016 |
| Lloydminster | Permanent Structures - Electrical | 20 | accounting | p11 · 2023 |
| Lloydminster | Portable Structures - Electrical | 20 | accounting | p11 · 2023 |
| Comox Valley | HVAC systems, mechanical, plumbing, wiring, etc. | 20 | accounting | p6 · 2010 |
| Cranbrook | HVAC, plumbing, lighting, etc | 20 | accounting | p9 · 2010 |
| Parksville | Electrical Infrastructure | 20 | accounting | p9 · 2023 |
| Telkwa | Electrical/Plumbing/Fire | 20 | accounting | p8 |
| Amherstburg | Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel | 20 | accounting | p8 · 2026 |
| Grey Highlands | Interior Lighting | 20 | accounting | p11 · 2026 |
| Grey Highlands | Ice Surface Lighting | 20 | accounting | p11 · 2026 |
| Huron | Patrol Yards - Building Electrical | 20 | planning | p42 · 2025 |
| Huron | Property Services - Building Electrical | 20 | planning | p57 · 2025 |
| Huron | Housing - Building Electrical | 20 | planning | p68 · 2025 |
| Huron | Homes for the Aged - Electrical | 20 | planning | p77 · 2025 |
| Kenora | Buildings - Electrical System | 20 | accounting | p15 · 2026 |
| London | Building Components - Services (HVAC, lighting, communication, plumbing etc.) | 20 | accounting | p2 · 2023 |
| Meaford | Electrical - Interior Lighting - Standard | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Interior Lighting - High Wattage | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Emergency Lighting | 20 | accounting | p17 · 2020 |
| The Blue Mountains | Interior Lighting | 20 | accounting | p11 · 2019 |
| The Blue Mountains | Ice Surface Lighting | 20 | accounting | p11 · 2019 |
| Welland | HVAC/Electrical/Mechanical | 20 | accounting | p8 · 2021 |
| Vulcan County | HVAC (electrical, mechanical) | 20–30 | accounting | p5 · 2024 |
| Duncan, North Cowichan · same table | Building Other (Electrical, Mechanical, etc.) | 25 | accounting | p17, p9 · 2011 |
| Lantzville | Electrical, Mechanical, Plumbing | 25 | accounting | p11 · 2019 |
| Tofino | Systems - mechanical, electrical, HVAC | 25 | accounting | p12 · 2009 |
| Brantford | Buildings - Electrical | 25 | planning | p10 · 2025 |
| Brantford | Site Works - Lighting | 25 | planning | p10 · 2025 |
| Greater Napanee | E25 Plant Mechanical & Electrical | 25 | accounting | p16 · 2012 |
| Kirkland Lake | Buildings and Improvements - Mechanical/Electrical | 25 | accounting | p10 · 2020 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | accounting | p11 · 2010 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | planning | p17 · 2026 |
| The Blue Mountains | Electrical System | 25 | accounting | p11 · 2019 |
| Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same table | Electrical/Plumbing | 25–30 | accounting | p5, p4, p6, p5 |
| Brockton | Mechanical/Electrical (Heating/Cooling System, Refridgerating System) | 40 | accounting | p2 · 2009 |
| Greater Madawaska, Quinte West · same table | Electrical | 40 | accounting | p17, p38 · 2025 |
| Simcoe | Electrical | 40 | accounting | p19 · 2025 |
| Trent Lakes | Electrical | 40 | accounting | p10 · 2009 |
| Meaford | Electrical - System | 50 | accounting | p17 · 2020 |
Of 54 rows, 2 were compared with an image of their page; 52 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
1 tasks in 1 work order.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Annual · 1 task
Source: UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance (7 October 2021, with Change 1, 18 April 2025), Table 2-27 Emergency Lighting System ITM Tasks
| Task | Page |
|---|---|
| Run battery emergency lights at least 90 minutes | p85 |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- HUD gives planning lives for US multifamily housing; the municipal rows are Ontario accounting lives. Neither is observed replacement data.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Emergency lighting unit, v0.4.0. https://unfinished.one/c/emergency-lighting/v/0.4.0BibTeX
@misc{unfinished_emergency_lighting_0_4_0,
title = {Emergency lighting unit},
author = {{unfinished.one}},
year = {2026},
version = {0.4.0},
url = {https://unfinished.one/c/emergency-lighting/v/0.4.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.4.0, 0.3.0, 0.2.0, 0.1.0