An asphalt parking lot has a useful life of about 22.5 years, the median of 14 published sources, which state 15–30 years.

Also listed as Parking lot, asphalt, paved parking

  • Confidence C
  • Version 0.6.0 (permanent link)
  • Reviewed 2026-10-22

Service life

22.5 yearsmedian of the stated lives · sources say 15–30 years
051015202530351530

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Work out when yours is due for replacement · Compare with what municipalities assume

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for parking lots (G2020)

16 municipalities in Ontario state a life for parking lots as a whole, in 16 distinct tables: 12.2–100 years, median 25. 18 rows come from capital asset policies (accounting lives, used for amortization) and 3 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 25 yearsCornwall: Parking lots, 12.2 yearsBarrie: Parking lot, asphalt, 15 yearsKingston: Parking lot, asphalt, 18 yearsAmherstburg: Parking lot, asphalt, 20 yearsKirkland Lake: Parking lots, 20 yearsLondon: Parking lots, 20 yearsOrillia: Parking lots, 20 yearsSimcoe: Parking lots, 20 yearsWelland: Parking lot, asphalt, 20 yearsGreater Napanee: Parking lots, 25 yearsGrey Highlands: Parking lot, asphalt, 25 yearsMeaford: Parking lot, asphalt, 30 yearsMeaford: Parking lots, gravel, 30 yearsOrillia: Parking lots, concrete, 30 yearsThe Blue Mountains: Parking lot, asphalt, 30 yearsThe Blue Mountains: Parking lots, gravel, 30 yearsOrillia: Parking lots, 40 yearsSevern: Parking lots, 50 yearsChapple: Parking lots, gravel, 80 yearsCornwall: Parking lots, 100 yearsPrince Edward: Parking lot, asphalt, 20–25 years020406080100120

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 21 stated lives
MunicipalityCoversYearsKindSource
CornwallParking lots12.2planningp252 · 2025
BarrieParking lot, asphalt15planningp110 · 2025
KingstonParking lot, asphalt18accountingp12 · 2016
AmherstburgParking lot, asphalt20accountingp8 · 2026
Kirkland LakeParking lots20accountingp10 · 2020
LondonParking lots20accountingp2 · 2023
OrilliaParking lots20accountingp18
SimcoeParking lots20accountingp18 · 2025
WellandParking lot, asphalt20accountingp8 · 2021
Prince EdwardParking lot, asphalt20–25accountingp34 · 2022
Greater NapaneeParking lots25accountingp16 · 2012
Grey HighlandsParking lot, asphalt25accountingp10 · 2026
MeafordParking lot, asphalt30accountingp16 · 2020
MeafordParking lots, gravel30accountingp16 · 2020
OrilliaParking lots, concrete30accountingp18
The Blue MountainsParking lot, asphalt30accountingp11 · 2019
The Blue MountainsParking lots, gravel30accountingp11 · 2019
OrilliaParking lots40accountingp18
SevernParking lots50accountingp400 · 2019
ChappleParking lots, gravel80accountingp1
CornwallParking lots100planningp252 · 2025

Of 21 rows, 3 were compared with an image of their page; 18 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

1 tasks in 1 work order.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6Semi
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12Semi

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Semi-annual · 1 task

Source: UFM 3-270-01 O&M Manual: Asphalt and Concrete Pavement Maintenance and Repair, Chapter 9 Asphalt Crack Sealing, 9-2.1 Field Evaluations

TaskPage
Evaluate asphalt cracks and existing sealant (summer and winter)p71

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • HUD gives planning lives for US multifamily housing; the municipal rows are Ontario accounting lives. Neither is observed replacement data.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Parking lot, asphalt, v0.6.0. https://unfinished.one/c/parking-lot-asphalt/v/0.6.0

BibTeX

@misc{unfinished_parking_lot_asphalt_0_6_0,
  title = {Parking lot, asphalt},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.6.0},
  url = {https://unfinished.one/c/parking-lot-asphalt/v/0.6.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.6.0, 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0