Uniformat G2010
Road surface, asphalt
Also called HCB surface, hot mix asphalt surface, wearing course
This is version 0.2.0. The latest is 0.3.0.
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 20 years · Amherstburg: Tangible Capital Assets Policy, Appendix A: TCA Categories, Life Years, and Thresholds, p7 · “Infrastructure - Transportation - Asphalt Road Surface” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 35 years · Brockton: Policy F06-2009-03 Capital Asset Amortization, p2 · “Roads - Surface - Hot Mix - HCB” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Chapple: Schedule A - By-law 1873: Asset Useful Life - General Guidelines, p1 · “Roads Hard Surface - Asphalt” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 25 years · Greater Madawaska: By-Law 21-2025 Tangible Capital Asset Policy (Finance Policy 4-02), p16 · “Roads - Asphalt Surface (HL4)” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03, p10 · “Asphalt Road Surface” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Prince Edward: FIN-12 Tangible Capital Assets Policy, p34 · “Roads - Surface - Paved - HCB” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 25 years · Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide, p402 · “Infrastructure - Roads - HCB Roads” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 25 years · Trent Lakes: 5.17 Capital Asset Policy, p10 · “Roads - Asphalt (HCB)” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for roadways (G2010)
50 municipalities in Ontario state a life for roadways as a whole, in 60 distinct tables: 3–200 years, median 45. 112 rows come from capital asset policies (accounting lives, used for amortization) and 237 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 341 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Meaford | Linear - Road Surface - Surface Treatment | 3–7 | accounting | p20 · 2020 |
| Brantford | On-road Active Transportation - Pavement Markings – Surface | 4 | planning | p13 · 2025 |
| Kapuskasing | Roads Surface - Surface Treated | 5 | accounting | p15 · 2009 |
| The Blue Mountains | Linear - Road Top - Surface Treatment | 6 | accounting | p12 · 2019 |
| Elgin | Handrails and guiderails | 7 | planning | p10 · 2025 |
| Meaford | Rural - LCB Surface | 7 | planning | p40 · 2022 |
| Thunder Bay | Roads - Chip Seal | 7 | planning | p50 · 2025 |
| Brantford | On-road Active Transportation - Pavement Markings – Inlaid | 8 | planning | p13 · 2025 |
| Bruce | Road Network - Surface Treated (weighted avg EUL) | 8 | planning | p44 · 2025 |
| Prince Edward | Roads - Surface - Gravel | 8 | accounting | p34 · 2022 |
| Prince Edward | Roads - Surface - Paved - LCB | 8 | accounting | p34 · 2022 |
| Trent Lakes | Roads - Surface Treatment (LCB) | 8 | accounting | p10 · 2009 |
| Chapple | Paved Roads | 9 | planning | p55 · 2025 |
| Brantford | On-road Active Transportation - Flexible Bollards | 10 | planning | p13 · 2025 |
| Chapple | Roads Hard Surface - tar & chip (low bituminous) | 10 | accounting | p1 |
| Chatham-Kent | Road Signs - Regulatory | 10 | planning | p10 · 2025 |
| Grey Highlands | Surface Treatment | 10 | accounting | p10 · 2026 |
| Kapuskasing | Roads Surface - Gravel / Asphalt | 10 | accounting | p15 · 2009 |
| Kenora | Road Network - Gravel | 10 | accounting | p16 · 2026 |
| Rainy River | Roads - tar and Chip | 10 | accounting | p12 · 2010 |
| Rainy River | Roads - tar and Chip | 10 | planning | p17 · 2026 |
| Bruce | Road Network - Signs (weighted avg EUL) | 10.2 | planning | p44 · 2025 |
| Essex | Asphalt | 12 | planning | p42 · 2025 |
| Essex | Tar & Chip | 12 | planning | p42 · 2025 |
| Essex | Roundabouts | 12–40 | planning | p42 · 2025 |
| Norfolk County | Roads - Collector | 13 | planning | p49 · 2025 |
| Barrie | Paved Lots | 15 | planning | p77 · 2025 |
| Brantford | Roads - Arterial | 15 | planning | p13 · 2025 |
| Brantford | Guide Rails - 3 Cable on Wood Posts | 15 | planning | p13 · 2025 |
| Brantford | On-road Active Transportation - Rubber Curbs | 15 | planning | p13 · 2025 |
| Chatham-Kent | Surface asphalt - arterial roads (prose) | 15 | planning | p24 · 2025 |
| Greater Madawaska | Roads - Surface Treatment (LCB) | 15 | accounting | p16 · 2025 |
| Kenora | Road Network - Surface Treated | 15 | accounting | p16 · 2026 |
| Kenora | Bridges - Substructure | 15 | accounting | p16 · 2026 |
| Norfolk County | Roads - Major Arterial | 15 | planning | p49 · 2025 |
| Norfolk County | Roads - Minor Arterial | 15 | planning | p49 · 2025 |
| Severn | Infrastructure - Roads - G Roads | 15 | accounting | p402 · 2019 |
| Quinte West | Bridges - Wearing (Asphalt, Wood) | 15–20 | accounting | p37 · 2024 |
| Centre Hastings | Road surface | 15–25 | accounting | p5 |
| Greater Madawaska | Roads - Paved | 15–25 | planning | p43 · 2025 |
| Kingston | Wildlife Mitigation Infrastructure - Wildlife Fencing | 15–25 | planning | p67 · 2024 |
| Amherstburg | Tar & Chip Road Surface | 15–54 | planning | p36 · 2025 |
| Cornwall | Street Signs | 17.6 | planning | p252 · 2025 |
| Kingston | Roads and Related - Urban road surface | 18 | accounting | p14 · 2016 |
| Kingston | Roads and Related - Semi-urban surface | 18 | accounting | p14 · 2016 |
| Kingston | Roads and Related - Rural road surface | 18 | accounting | p14 · 2016 |
| Middlesex | Asphalt road surface (average) | 18 | planning | p12 · 2022 |
| Norfolk County | Roads - Local | 18 | planning | p49 · 2025 |
| Amherstburg | Infrastructure - Transportation - Asphalt Road Surface | 20 | accounting | p7 · 2026 |
| Amherstburg | Infrastructure - Transportation - Tar and Chip Road Surface | 20 | accounting | p7 · 2026 |
| Brantford | Bridges - Wood | 20 | planning | p12 · 2025 |
| Brantford | Stairways - Wood | 20 | planning | p12 · 2025 |
| Brantford | Retaining Walls - Wood | 20 | planning | p12 · 2025 |
| Brantford | Sound Walls - Wood | 20 | planning | p12 · 2025 |
| Brantford | Roads - Local – Gravel | 20 | planning | p13 · 2025 |
| Brantford | Guide Rails - Steel Beam Guide Rail | 20 | planning | p13 · 2025 |
| Brockton | Roads - Surface - Surface Treatment | 20 | accounting | p2 · 2009 |
| Bruce | Road Network - Asphalt Rural (weighted avg EUL) | 20 | planning | p44 · 2025 |
| Bruce | Road Network - Asphalt Urban (weighted avg EUL) | 20 | planning | p44 · 2025 |
| Chapple | Roads Hard Surface - Asphalt | 20 | accounting | p1 |
| Chatham-Kent | Road Signs - Guide Signs | 20 | planning | p10 · 2025 |
| Chatham-Kent | Road Signs - Info Signs | 20 | planning | p10 · 2025 |
| Essex | Bridges - Deck | 20 | planning | p60 · 2025 |
| Grey Highlands | Asphalt Road Surface | 20 | accounting | p10 · 2026 |
| Grey Highlands | Granular A Base | 20 | accounting | p10 · 2026 |
| Kapuskasing | Bridges (Overhaul at 20 years) | 20 | planning | p7 · 2022 |
| Northumberland | Roads - Surface Treated | 20 | planning | p62 · 2022 |
| Prescott and Russell | Road wear course | 20 | planning | p47 · 2025 |
| Prince Edward | Roads - Surface - Paved - HCB | 20 | accounting | p34 · 2022 |
| Quinte West · same table | Roads - Asphalt Surface (HDB;LCB) | 20 | accounting | p36, p36 · 2024 |
| Rainy River | Roads - Asphalt | 20 | accounting | p12 · 2010 |
| Rainy River | Roads - Asphalt | 20 | planning | p17 · 2026 |
| Sarnia | Land Improvements - Paving | 20 | accounting | p1 |
| Severn | Infrastructure - Roads - LCB Roads | 20 | accounting | p402 · 2019 |
| Severn | Infrastructure - Roads - Bridges - Deck | 20 | accounting | p402 · 2019 |
| Kapuskasing | Roads (Paved) | 20–40 | planning | p7 · 2022 |
| Peterborough | Roads - Right of Way (weighted average) | 21 | planning | p118 · 2025 |
| Huron | Roads Surface | 22 | planning | p17 · 2025 |
| Amherstburg | Infrastructure - Transportation - Concrete Road Surface | 25 | accounting | p7 · 2026 |
| Brantford | Roads - Collector | 25 | planning | p13 · 2025 |
| Brockton | Bridges - Deck | 25 | accounting | p2 · 2009 |
| Chapple | Site Works - Asphalt etc. | 25 | accounting | p1 |
| Chatham-Kent | Surface asphalt - local roads (prose) | 25 | planning | p24 · 2025 |
| Cornwall | Small Retaining Walls (under 600mm height) | 25 | planning | p252 · 2025 |
| Greater Madawaska | Roads - Asphalt Surface (HL4) | 25 | accounting | p16 · 2025 |
| Kenora | Road Network - Paved | 25 | accounting | p16 · 2026 |
| London | Expressway | 25 | planning | p157 · 2023 |
| Meaford | Rural/Semi-Urban - Asphalt Surface | 25 | planning | p39 · 2022 |
| Northumberland | Structures - Retaining Walls | 25 | planning | p62 · 2022 |
| Oxford | Arterial Road | 25 | planning | p307 · 2025 |
| Oxford | Collector Road | 25 | planning | p307 · 2025 |
| Oxford | Local Road | 25 | planning | p307 · 2025 |
| Peterborough | Class A Roads | 25 | planning | p44 · 2025 |
| Peterborough | Class B Roads | 25 | planning | p44 · 2025 |
| Peterborough | Class C Roads | 25 | planning | p44 · 2025 |
| Severn | Infrastructure - Roads - HCB Roads | 25 | accounting | p402 · 2019 |
| Simcoe | Primary Arterial - Deterioration Curve Useful Life | 25 | planning | p43 · 2025 |
| Simcoe | Primary Arterial - Controlled Access - Deterioration Curve Useful Life | 25 | planning | p43 · 2025 |
| Simcoe | Secondary Arterial - Deterioration Curve Useful Life | 25 | planning | p43 · 2025 |
| Thunder Bay | Roads - Urban/Arterial | 25 | planning | p50 · 2025 |
| Thunder Bay | Roads - Rural/Arterial | 25 | planning | p50 · 2025 |
| Trent Lakes | Roads - Asphalt (HCB) | 25 | accounting | p10 · 2009 |
| Welland | All Roads (by component) - Paved road surface | 25 | accounting | p9 · 2021 |
| Welland | Bridges (by component) - Bridge Deck - treated as paved road surface | 25 | accounting | p9 · 2021 |
| Wellington | Roads - With no intervention or lifecycle events | 25 | planning | p95 · 2025 |
| Grey Highlands | Roads Related | 25–30 | planning | p62 · 2025 |
| Amherstburg | Signalized Crossings | 25–45 | planning | p36 · 2025 |
| Amherstburg | Asphalt Road Surface (Rural) | 25–75 | planning | p36 · 2025 |
| Amherstburg | Multi-Type Road Surface (Urban) | 25–75 | planning | p36 · 2025 |
| Meaford | Linear - Bridges - Superstructure | 25–75 | accounting | p19 · 2020 |
| Haldimand County | Lights | 25.6 | planning | p76 · 2025 |
| Cornwall | Pedestrian Crossings | 26.1 | planning | p252 · 2025 |
| Haldimand County | Asphalt Roads | 28 | planning | p76 · 2025 |
| Haldimand County | Surface Treated Roads | 28 | planning | p76 · 2025 |
| Amherstburg | Infrastructure - Transportation - Bridges/Culverts/Sidewalks | 30 | accounting | p7 · 2026 |
| Grey Highlands | Asphalt Curb | 30 | accounting | p10 · 2026 |
| Kingston | Guide Rails - Guide Rail | 30 | planning | p44 · 2024 |
| Lanark | Roads (counted from last rehabilitation) | 30 | planning | p56 · 2022 |
| Meaford | Linear - Bridges - Wearing Surface | 30 | accounting | p19 · 2020 |
| Meaford | Linear - Road Surface - Asphalt - Curb | 30 | accounting | p20 · 2020 |
| Meaford | Urban – Asphalt Surface | 30 | planning | p40 · 2022 |
| Orillia | Arterial Roads | 30 | planning | p65 · 2025 |
| Orillia | Collector Roads | 30 | planning | p65 · 2025 |
| Orillia | Local Roads | 30 | planning | p65 · 2025 |
| Oxford | Guide Rails (bridges and structural culverts) | 30 | planning | p292 · 2025 |
| Oxford | Guide Rails | 30 | planning | p307 · 2025 |
| Oxford | Pedestrian Crossover | 30 | planning | p307 · 2025 |
| Oxford | Beacon | 30 | planning | p307 · 2025 |
| Peterborough | Active Transportation (weighted average) | 30 | planning | p118 · 2025 |
| Prince Edward | Curb and Gutter | 30 | accounting | p34 · 2022 |
| Prince Edward | Curb Stops (Pooled) | 30 | accounting | p34 · 2022 |
| Stormont | Safety Structures | 30 | planning | p17 · 2025 |
| The Blue Mountains | Linear - Road Base - Gravel | 30 | accounting | p12 · 2019 |
| The Blue Mountains | Linear - Road Top - Asphalt - Curb | 30 | accounting | p12 · 2019 |
| Thunder Bay | Roads - Urban/Collector | 30 | planning | p50 · 2025 |
| Thunder Bay | Roads - Rural/Collector | 30 | planning | p50 · 2025 |
| Trent Lakes | Paved Roads | 30 | planning | p68 · 2024 |
| Welland | All Roads (by component) - Road bed - unpaved | 30 | accounting | p9 · 2021 |
| Grey Highlands | Bridges and Culverts | 30–75 | planning | p64 · 2025 |
| Wellington | Roads - With County capital lifecycle events | 33.75 | planning | p95 · 2025 |
| Brantford | Roads - Local - Asphalt | 35 | planning | p13 · 2025 |
| Brockton | Roads - Surface - Hot Mix - HCB | 35 | accounting | p2 · 2009 |
| Grey Highlands | Concrete Curb | 35 | accounting | p10 · 2026 |
| Kirkland Lake | LCB | 35 | planning | p49 · 2025 |
| Quinte West · same table | Roads - Base | 35 | accounting | p36, p36 · 2024 |
| Amherstburg | Infrastructure - Transportation - Road Reconstruction | 40 | accounting | p7 · 2026 |
| Brantford | Signalized Intersections - Steel Pole | 40 | planning | p13 · 2025 |
| Chatham-Kent | Guide Rails | 40 | planning | p10 · 2025 |
| Elgin | Roads (all road types) | 40 | planning | p10 · 2025 |
| Essex | Concrete | 40 | planning | p42 · 2025 |
| Essex | Bridges - Structure | 40 | planning | p60 · 2025 |
| Greater Madawaska | Roads - Base | 40 | accounting | p16 · 2025 |
| Greater Napanee | LA40 Road Bed - Low Class Bituminous (Surface Treatment considered maintenance), Gravel & Stone - Road Bed, Bridge - Steel | 40 | accounting | p17 · 2012 |
| Greater Sudbury | Treated Wood Pole | 40 | planning | p22 · 2023 |
| Kirkland Lake | G/S | 40 | planning | p49 · 2025 |
| Kirkland Lake | HCB | 40 | planning | p49 · 2025 |
| Prince Edward | Bridges & Culverts - Bridge - Deck | 40 | accounting | p34 · 2022 |
| Severn | Infrastructure - Roads - Curbs | 40 | accounting | p402 · 2019 |
| Simcoe | Primary Arterial - Estimated Financial Useful Life | 40 | planning | p43 · 2025 |
| Simcoe | Primary Arterial - Controlled Access - Estimated Financial Useful Life | 40 | planning | p43 · 2025 |
| Simcoe | Secondary Arterial - Estimated Financial Useful Life | 40 | planning | p43 · 2025 |
| Simcoe | Road Segment - Reconstruction | 40 | accounting | p21 · 2025 |
| The Blue Mountains | Linear - Road Base - Surface Treatment | 40 | accounting | p12 · 2019 |
| The Blue Mountains | corrugated steel pipes (CSP) | 40 | planning | p107 · 2025 |
| Thunder Bay | Roads - Urban/Residential | 40 | planning | p50 · 2025 |
| Thunder Bay | Roads - Rural/Residential | 40 | planning | p50 · 2025 |
| Trent Lakes · same table | Pirates Glen (#206) | 40 | planning | p67, p67, p67 · 2024 |
| Wellington | Retaining Walls - Wood | 40 | planning | p117 · 2025 |
| Kirkland Lake | Bridges | 40.2 | planning | p62 · 2025 |
| Haldimand County | Non-OSIM Bridges | 43.5 | planning | p84 · 2025 |
| Barrie | Arterial/Parkway | 45 | planning | p76 · 2025 |
| Chatham-Kent | Paved Roads (Arterial) - includes both Rural & Urban | 45 | planning | p10 · 2025 |
| Chatham-Kent | Curbs & Gutter | 45 | planning | p10 · 2025 |
| Greater Napanee | LA45 Bridge - Concrete - Precast Girder | 45 | accounting | p17 · 2012 |
| London | Rural Throughfare | 45 | planning | p157 · 2023 |
| London | Rural Connector | 45 | planning | p157 · 2023 |
| London | Civic Boulevard | 45 | planning | p157 · 2023 |
| London | Urban Throughfare | 45 | planning | p157 · 2023 |
| London | Main Street | 45 | planning | p157 · 2023 |
| London | Neighbourhood Street | 45 | planning | p157 · 2023 |
| London | Neighbourhood Connector | 45 | planning | p157 · 2023 |
| London | Rapid Transit Boulevard | 45 | planning | p157 · 2023 |
| London | Interchange Ramps | 45 | planning | p157 · 2023 |
| London | Surface Lots | 45 | planning | p197 · 2023 |
| Northumberland | Roads - Asphalt | 45 | planning | p62 · 2022 |
| Orillia | Bridge Component: Prestressed Concrete/Steel without Truss | 45 | accounting | p23 |
| Sarnia | Bridges | 45 | accounting | p2 |
| Bruce | Bridges (weighted avg EUL) | 45.4 | planning | p56 · 2025 |
| Amherstburg | ROW Structures | 50 | planning | p36 · 2025 |
| Brantford | Bridges - Unknown | 50 | planning | p12 · 2025 |
| Brantford | Stairways - Unknown | 50 | planning | p12 · 2025 |
| Brantford | Retaining Walls - Unknown | 50 | planning | p12 · 2025 |
| Brantford | Sound Walls - Other | 50 | planning | p12 · 2025 |
| Brantford | Signalized Intersections - Wood Pole | 50 | planning | p13 · 2025 |
| Brantford | Signalized Intersections - Aluminum Pole | 50 | planning | p13 · 2025 |
| Brantford | Signalized Intersections - Concrete Pole | 50 | planning | p13 · 2025 |
| Brockton | Bridges - Super-Structures | 50 | accounting | p2 · 2009 |
| Centre Hastings | Bridges & Culverts | 50 | planning | p58 · 2025 |
| Centre Hastings | Road base | 50 | accounting | p5 |
| Greater Napanee | LA50 Bridge - Concrete - Mass, Culvert - Concrete | 50 | accounting | p17 · 2012 |
| Grey Highlands | Granular B Base | 50 | accounting | p10 · 2026 |
| Haldimand County | OSIM Bridges | 50 | planning | p84 · 2025 |
| Halton | Urban | 50 | planning | p107 · 2025 |
| Halton | Rural | 50 | planning | p107 · 2025 |
| Halton | Sub - Urban | 50 | planning | p107 · 2025 |
| Huron | Roads Base | 50 | planning | p17 · 2025 |
| Kenora | Bridges - Superstructure | 50 | accounting | p16 · 2026 |
| Kingston | Roads and Related - Urban road bed | 50 | accounting | p14 · 2016 |
| Kingston | Roads and Related - Semi-urban bed | 50 | accounting | p14 · 2016 |
| Kingston | Roads and Related - Rural road bed | 50 | accounting | p14 · 2016 |
| Kirkland Lake | Roads Surface | 50 | accounting | p10 · 2020 |
| Kirkland Lake | Bridges | 50 | accounting | p10 · 2020 |
| Kirkland Lake | Curbs | 50 | planning | p49 · 2025 |
| Kirkland Lake | Pedestrian Bridges | 50 | planning | p62 · 2025 |
| Meaford | Linear - Road Base - Surface Treatment | 50 | accounting | p19 · 2020 |
| Meaford | Linear - Road Base - Gravel | 50 | accounting | p19 · 2020 |
| Meaford · same table | Rural/Semi-Urban - Asphalt Base | 50 | planning | p40, p40 · 2022 |
| Norfolk County | Roads - Guiderails | 50 | planning | p49 · 2025 |
| Norfolk County | Roads - Retaining Walls | 50 | planning | p49 · 2025 |
| Norfolk County | Structures - Pedestrian Bridges | 50 | planning | p49 · 2025 |
| Orillia | Bridge Component: Structure/Steel with Truss | 50 | accounting | p23 |
| Oxford | Retaining Wall | 50 | planning | p307 · 2025 |
| Peterborough | Retaining Walls | 50 | planning | p60 · 2025 |
| Prince Edward | Roads - Base | 50 | accounting | p34 · 2022 |
| Rainy River | Signs | 50 | planning | p17 · 2026 |
| Sarnia | Roads - Arterial | 50 | accounting | p2 |
| Sarnia | Roads - Local | 50 | accounting | p2 |
| Sault Ste. Marie | Pedestrian Bridges (weighted average ESL) | 50 | planning | p17 · 2025 |
| Severn | Infrastructure - Roads - Bridges - Structures | 50 | accounting | p402 · 2019 |
| The Blue Mountains | Linear - Road Base - Asphalt - Curb | 50 | accounting | p12 · 2019 |
| Thunder Bay | Bridge | 50 | planning | p51 · 2025 |
| Welland | All Roads (by component) - Road bed - paved | 50 | accounting | p9 · 2021 |
| Wellington | Bridges and Culverts (Steel, CSP Arch) - EUL with no intervention or lifecycle events | 50 | planning | p51 · 2025 |
| Greater Madawaska, Quinte West · same table | Bridges - Deck (Wood, Concrete) | 50–75 | accounting | p16, p17, p36, p36 · 2025 |
| Grey Highlands | Bridges | 50–75 | accounting | p10 · 2026 |
| Meaford | Linear - Bridges - Substructure | 50–75 | accounting | p19 · 2020 |
| Sault Ste. Marie | Vehicular Bridges (weighted average ESL) | 58 | planning | p17 · 2025 |
| Amherstburg | ROW Trails | 60 | planning | p36 · 2025 |
| Barrie | Collector | 60 | planning | p76 · 2025 |
| Brantford | Signalized Intersections - Composite Pole | 60 | planning | p13 · 2025 |
| Chatham-Kent | Paved Roads (Collectors) - includes both Rural & Urban | 60 | planning | p10 · 2025 |
| Greater Sudbury | Paved Road | 60 | planning | p22 · 2023 |
| Greater Sudbury | Paved Lot | 60 | planning | p34 · 2023 |
| Greater Sudbury | Gravel Lot | 60 | planning | p34 · 2023 |
| Kingston | Bridges - Bridge structures | 60 | accounting | p15 · 2016 |
| Kingston | Bridges - Box and arch culverts | 60 | accounting | p15 · 2016 |
| Oxford | Bridges | 60 | planning | p292 · 2025 |
| Prescott and Russell | Roundabouts | 60 | planning | p47 · 2025 |
| Prescott and Russell | PXO (pedestrian crossover) | 60 | planning | p57 · 2025 |
| Prince Edward | Bridges & Culverts - Culverts | 60 | accounting | p34 · 2022 |
| Severn | Infrastructure - Roads - Sublayer | 60 | accounting | p402 · 2019 |
| Trent Lakes | Roads - Base | 60 | accounting | p10 · 2009 |
| Trent Lakes | Crowes Line Bridge (#209) | 60 | planning | p67 · 2024 |
| Wellington | Bridges and Culverts (Concrete) - EUL with no intervention or lifecycle events | 60 | planning | p51 · 2025 |
| Peterborough | Bridges | 61.5 | planning | p60 · 2025 |
| Cornwall | Retaining Walls | 65.1 | planning | p252 · 2025 |
| Cornwall | Pole Footings | 66 | planning | p252 · 2025 |
| Peterborough | Municipal Structures (weighted average) | 69 | planning | p118 · 2025 |
| Barrie | Local | 70 | planning | p76 · 2025 |
| Chatham-Kent | Bridges & Culverts Greater than 3 m | 70 | planning | p9 · 2025 |
| Chatham-Kent | Access Bridges Less than 3 m | 70 | planning | p9 · 2025 |
| Halton | Bridge | 70 | planning | p107 · 2025 |
| Prescott and Russell | Road base | 70 | planning | p46 · 2025 |
| Toronto | Structures - Bridge Infrastructure | 70 | planning | p294 · 2025 |
| Bruce | Road Network - Road Base (weighted avg EUL) | 70.9 | planning | p44 · 2025 |
| Wellington | Bridges and Culverts (Steel, CSP Arch) - EUL with County maintenance lifecycle events | 73 | planning | p51 · 2025 |
| Cornwall | Bridges | 73.7 | planning | p252 · 2025 |
| Barrie | Road Bridges, Pedestrian Bridges (>3m span) | 75 | planning | p76 · 2025 |
| Brantford | Bridges - Concrete | 75 | planning | p12 · 2025 |
| Brantford | Bridges - Steel | 75 | planning | p12 · 2025 |
| Brantford | Bridges - Masonry | 75 | planning | p12 · 2025 |
| Brantford | Stairways - Concrete | 75 | planning | p12 · 2025 |
| Brantford | Stairways - Steel | 75 | planning | p12 · 2025 |
| Brantford | Stairways - Masonry | 75 | planning | p12 · 2025 |
| Brantford | Retaining Walls - Concrete | 75 | planning | p12 · 2025 |
| Brantford | Retaining Walls - Steel | 75 | planning | p12 · 2025 |
| Brantford | Retaining Walls - Masonry | 75 | planning | p12 · 2025 |
| Brantford | Sound Walls - Concrete | 75 | planning | p12 · 2025 |
| Brantford | Sound Walls - Steel | 75 | planning | p12 · 2025 |
| Brantford | Sound Walls - Masonry | 75 | planning | p12 · 2025 |
| Brockton | Bridges - Footings | 75 | accounting | p2 · 2009 |
| Brockton | Bridges - Whole | 75 | accounting | p2 · 2009 |
| Chapple | Bridges | 75 | planning | p65 · 2025 |
| Elgin | Concrete bridges | 75 | planning | p10 · 2025 |
| Elgin | Steel bridges | 75 | planning | p10 · 2025 |
| Greater Sudbury | Gravel Road | 75 | planning | p22 · 2023 |
| Huron | Bridges (CHBDC expected service life, new structures) | 75 | planning | p26 · 2025 |
| Kapuskasing | Bridges - Constructed | 75 | accounting | p15 · 2009 |
| Lambton | Bridges | 75 | planning | p89 · 2025 |
| Leeds and Grenville | Bridge | 75 | planning | p49 · 2025 |
| Meaford | Bridge | 75 | planning | p79 · 2022 |
| Middlesex | Bridges | 75 | planning | p18 · 2022 |
| Norfolk County | Structures - Bridge | 75 | planning | p49 · 2025 |
| Northumberland | Structures - Bridges | 75 | planning | p62 · 2022 |
| Orillia | Bridges | 75 | planning | p65 · 2025 |
| Orillia | Retaining Walls | 75 | planning | p65 · 2025 |
| Prince Edward | Bridges & Culverts - Bridge- Structure | 75 | accounting | p34 · 2022 |
| Simcoe | Bridges | 75 | planning | p68 · 2025 |
| Simcoe | Pedestrian Bridge | 75 | planning | p68 · 2025 |
| Simcoe | Bridges | 75 | accounting | p21 · 2025 |
| The Blue Mountains | Linear - Bridges | 75 | accounting | p12 · 2019 |
| The Blue Mountains | bridges | 75 | planning | p107 · 2025 |
| Toronto | Linear Infrastructure (Expressways - Highway 2A & William R Allen Rd) | 75 | planning | p294 · 2025 |
| Toronto | Linear Infrastructure (Minor & Major Arterial Roads) | 75 | planning | p295 · 2025 |
| Welland | Bridges (by component) - Bridge Superstructure | 75 | accounting | p9 · 2021 |
| Welland | Bridges (by component) - Culverts | 75 | accounting | p9 · 2021 |
| Wellington | Retaining Walls - Concrete (including Armour Stone, Gabion Wall, and Masonry) | 75 | planning | p117 · 2025 |
| York | Bridges: Replacement | 75 | planning | p53 · 2024 |
| Amherstburg | Bridges | 75–80 | planning | p51 · 2025 |
| Brockton | Roads - Base - Urban | 80 | accounting | p2 · 2009 |
| Brockton | Roads - Base - Rural | 80 | accounting | p2 · 2009 |
| Chapple | Bridges | 80 | accounting | p1 |
| Chapple | Roads - gravel | 80 | accounting | p1 |
| Chatham-Kent | Paved Roads (Local) | 80 | planning | p10 · 2025 |
| Chatham-Kent | Surface Treated Roads | 80 | planning | p10 · 2025 |
| Essex | Bridges - Foundation | 80 | planning | p60 · 2025 |
| London | Bridges | 80 | planning | p158 · 2023 |
| London | Footbridges | 80 | planning | p158 · 2023 |
| Meaford | Linear - Road Base - Asphalt - Curb | 80 | accounting | p19 · 2020 |
| Meaford | Urban – Asphalt Base | 80 | planning | p40 · 2022 |
| Rainy River | Roads - base | 80 | accounting | p11 · 2010 |
| Rainy River | Roads - Gravel | 80 | accounting | p11 · 2010 |
| Rainy River | Roads - Gravel | 80 | planning | p17 · 2026 |
| Wellington | Bridges and Culverts (Concrete) - EUL with County maintenance lifecycle events | 84.08 | planning | p51 · 2025 |
| Brantford | Roads - Base | 85 | planning | p13 · 2025 |
| Simcoe | Primary Arterial - Lifecycle EUL Extended by Events | 85 | planning | p43 · 2025 |
| Simcoe | Primary Arterial - Controlled Access - Lifecycle EUL Extended by Events | 85 | planning | p43 · 2025 |
| Simcoe | Secondary Arterial - Lifecycle EUL Extended by Events | 85 | planning | p43 · 2025 |
| Lanark | Bridges - Precast (most common) | 90 | planning | p78 · 2022 |
| Cornwall | Roads | 100 | planning | p252 · 2025 |
| Cornwall | Roads - Arterial | 100 | planning | p253 · 2025 |
| Cornwall | Roads - Collector | 100 | planning | p253 · 2025 |
| Cornwall | Roads - Local | 100 | planning | p253 · 2025 |
| Lanark | Bridges - Cast in Place (most common) | 100 | planning | p78 · 2022 |
| Orillia | Bridge Component: Abutments | 100 | accounting | p23 |
| Toronto | Linear Infrastructure (Local & Collector Roads) | 100 | planning | p295 · 2025 |
| Toronto | Linear Infrastructure (Laneways) | 100 | planning | p295 · 2025 |
| Prescott and Russell | Bridge | 110 | planning | p52 · 2025 |
| Lanark | Bridges - Steel (most common) | 115 | planning | p78 · 2022 |
| Lanark | Bridges - Stone (most common) | 166 | planning | p78 · 2022 |
| Rainy River | Roads - base | 200 | planning | p17 · 2026 |
Of 349 rows, 29 were compared with an image of their page; 320 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
1 tasks in 1 work order.
- 1
- 2
- 3
- 4
- 5
- 6Semi
- 7
- 8
- 9
- 10
- 11
- 12Semi
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Semi-annual · 1 task
Source: UFM 3-270-01 O&M Manual: Asphalt and Concrete Pavement Maintenance and Repair, Chapter 9 Asphalt Crack Sealing, 9-2.1 Field Evaluations
| Task | Page |
|---|---|
| Evaluate asphalt cracks and existing sealant (summer and winter) | p71 |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Road surface, asphalt, v0.2.0. https://unfinished.one/c/road-asphalt-surface/v/0.2.0BibTeX
@misc{unfinished_road_asphalt_surface_0_2_0,
title = {Road surface, asphalt},
author = {{unfinished.one}},
year = {2026},
version = {0.2.0},
url = {https://unfinished.one/c/road-asphalt-surface/v/0.2.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.3.0, 0.2.0, 0.1.0