A surface-treated road has a useful life of about 10 years, the median of 17 published sources, which state 3–54 years.
Also listed as Road surface treatment, LCB surface, tar and chip, chip seal
This is version 0.5.0. The latest is 0.6.0.
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Work out when yours is due for replacement · Compare with what municipalities assume
Basis
- 20 years · Amherstburg: Tangible Capital Assets Policy, Appendix A: TCA Categories, Life Years, and Thresholds, p7 · “Infrastructure - Transportation - Tar and Chip Road Surface” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Brockton: Policy F06-2009-03 Capital Asset Amortization, p2 · “Roads - Surface - Surface Treatment” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 15 years · Greater Madawaska: By-Law 21-2025 Tangible Capital Asset Policy (Finance Policy 4-02), p16 · “Roads - Surface Treatment (LCB)” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 10 years · Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03, p10 · “Surface Treatment” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 5 years · Kapuskasing: By-law No. 3103, Tangible Capital Assets Policy, p15 · “Roads Surface - Surface Treated” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 15 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p16 · “Road Network - Surface Treated” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 3–7 years · Meaford: By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives, p20 · “Linear - Road Surface - Surface Treatment” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 8 years · Prince Edward: FIN-12 Tangible Capital Assets Policy, p34 · “Roads - Surface - Paved - LCB” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 10 years · Rainy River: F-9 Tangible Capital Assets Policy, p12 · “Roads - tar and Chip” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Severn: By-law 2019-04, Corporate Policy Manual: Tangible Capital Asset Policy, Useful Life Guide, p402 · “Infrastructure - Roads - LCB Roads” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 6 years · The Blue Mountains: POL.COR.19.04 Tangible Capital Assets Policy, p12 · “Linear - Road Top - Surface Treatment” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 8 years · Trent Lakes: 5.17 Capital Asset Policy, p10 · “Roads - Surface Treatment (LCB)” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 15–54 years · Amherstburg: Asset Management Plan Town of Amherstburg 2025, p36 · “Tar & Chip Road Surface” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 8 years · Bruce: Asset Management Plan 2025, Bruce County, p44 · “Road Network - Surface Treated (weighted avg EUL)” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 7 years · Meaford: Municipality of Meaford Asset Management Plan - Core Assets (Appendix 1 to Report CAO2022-28), p40 · “Rural - LCB Surface” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 10 years · Rainy River: Asset Management Plan 2025-2035, p17 · “Roads - tar and Chip” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 7 years · Thunder Bay: Future-Ready Roadmap: Asset Management Plan Phase Three, p50 · “Roads - Chip Seal” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for roadways (G2010)
50 municipalities in Ontario state a life for roadways as a whole, in 60 distinct tables: 3–200 years, median 45. 112 rows come from capital asset policies (accounting lives, used for amortization) and 237 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 341 stated lives
| Municipality | Covers | Years | Kind | Source |
|---|---|---|---|---|
| Meaford | Road surface treatment | 3–7 | accounting | p20 · 2020 |
| Brantford | Roadways | 4 | planning | p13 · 2025 |
| Kapuskasing | Road surface treatment | 5 | accounting | p15 · 2009 |
| The Blue Mountains | Road surface treatment | 6 | accounting | p12 · 2019 |
| Elgin | Roadways | 7 | planning | p10 · 2025 |
| Meaford | Road surface treatment | 7 | planning | p40 · 2022 |
| Thunder Bay | Road surface treatment | 7 | planning | p50 · 2025 |
| Brantford | Roadways | 8 | planning | p13 · 2025 |
| Bruce | Road surface treatment | 8 | planning | p44 · 2025 |
| Prince Edward | Road, gravel | 8 | accounting | p34 · 2022 |
| Prince Edward | Road surface treatment | 8 | accounting | p34 · 2022 |
| Trent Lakes | Road surface treatment | 8 | accounting | p10 · 2009 |
| Chapple | Roadways | 9 | planning | p55 · 2025 |
| Brantford | Roadways | 10 | planning | p13 · 2025 |
| Chapple | Roadways | 10 | accounting | p1 |
| Chatham-Kent | Roadways | 10 | planning | p10 · 2025 |
| Grey Highlands | Road surface treatment | 10 | accounting | p10 · 2026 |
| Kapuskasing | Roadways | 10 | accounting | p15 · 2009 |
| Kenora | Road, gravel | 10 | accounting | p16 · 2026 |
| Rainy River | Road surface treatment | 10 | accounting | p12 · 2010 |
| Rainy River | Road surface treatment | 10 | planning | p17 · 2026 |
| Bruce | Roadways | 10.2 | planning | p44 · 2025 |
| Essex | Roadways, asphalt | 12 | planning | p42 · 2025 |
| Essex | Roadways | 12 | planning | p42 · 2025 |
| Essex | Roadways | 12–40 | planning | p42 · 2025 |
| Norfolk County | Roadways | 13 | planning | p49 · 2025 |
| Barrie | Roadways | 15 | planning | p77 · 2025 |
| Brantford | Roadways | 15 | planning | p13 · 2025 |
| Brantford | Guardrail | 15 | planning | p13 · 2025 |
| Brantford | Roadways | 15 | planning | p13 · 2025 |
| Chatham-Kent | Road surface, asphalt | 15 | planning | p24 · 2025 |
| Greater Madawaska | Road surface treatment | 15 | accounting | p16 · 2025 |
| Kenora | Road surface treatment | 15 | accounting | p16 · 2026 |
| Kenora | Roadways | 15 | accounting | p16 · 2026 |
| Norfolk County | Roadways | 15 | planning | p49 · 2025 |
| Norfolk County | Roadways | 15 | planning | p49 · 2025 |
| Severn | Roadways | 15 | accounting | p402 · 2019 |
| Quinte West | Roadways | 15–20 | accounting | p37 · 2024 |
| Centre Hastings | Roadways | 15–25 | accounting | p5 |
| Greater Madawaska | Roadways | 15–25 | planning | p43 · 2025 |
| Kingston | Roadways | 15–25 | planning | p67 · 2024 |
| Amherstburg | Road surface treatment | 15–54 | planning | p36 · 2025 |
| Cornwall | Roadways | 17.6 | planning | p252 · 2025 |
| Kingston | Roadways | 18 | accounting | p14 · 2016 |
| Kingston | Roadways | 18 | accounting | p14 · 2016 |
| Kingston | Roadways | 18 | accounting | p14 · 2016 |
| Middlesex | Road surface, asphalt | 18 | planning | p12 · 2022 |
| Norfolk County | Roadways | 18 | planning | p49 · 2025 |
| Amherstburg | Road surface, asphalt | 20 | accounting | p7 · 2026 |
| Amherstburg | Road surface treatment | 20 | accounting | p7 · 2026 |
| Brantford | Roadways, wood | 20 | planning | p12 · 2025 |
| Brantford | Roadways, wood | 20 | planning | p12 · 2025 |
| Brantford | Roadways, wood | 20 | planning | p12 · 2025 |
| Brantford | Roadways, wood | 20 | planning | p12 · 2025 |
| Brantford | Road, gravel | 20 | planning | p13 · 2025 |
| Brantford | Guardrail | 20 | planning | p13 · 2025 |
| Brockton | Road surface treatment | 20 | accounting | p2 · 2009 |
| Bruce | Roadways, asphalt | 20 | planning | p44 · 2025 |
| Bruce | Roadways, asphalt | 20 | planning | p44 · 2025 |
| Chapple | Road surface, asphalt | 20 | accounting | p1 |
| Chatham-Kent | Roadways | 20 | planning | p10 · 2025 |
| Chatham-Kent | Roadways | 20 | planning | p10 · 2025 |
| Essex | Bridge deck | 20 | planning | p60 · 2025 |
| Grey Highlands | Road surface, asphalt | 20 | accounting | p10 · 2026 |
| Grey Highlands | Road base, granular | 20 | accounting | p10 · 2026 |
| Kapuskasing | Roadways | 20 | planning | p7 · 2022 |
| Northumberland | Roadways | 20 | planning | p62 · 2022 |
| Prescott and Russell | Road surface, asphalt | 20 | planning | p47 · 2025 |
| Prince Edward | Road surface, asphalt | 20 | accounting | p34 · 2022 |
| Quinte West · same table | Roadways, asphalt | 20 | accounting | p36, p36 · 2024 |
| Rainy River | Roadways, asphalt | 20 | accounting | p12 · 2010 |
| Rainy River | Roadways, asphalt | 20 | planning | p17 · 2026 |
| Sarnia | Roadways | 20 | accounting | p1 |
| Severn | Road surface treatment | 20 | accounting | p402 · 2019 |
| Severn | Bridge deck | 20 | accounting | p402 · 2019 |
| Kapuskasing | Roadways | 20–40 | planning | p7 · 2022 |
| Peterborough | Roadways | 21 | planning | p118 · 2025 |
| Huron | Roadways | 22 | planning | p17 · 2025 |
| Amherstburg | Road, concrete pavement | 25 | accounting | p7 · 2026 |
| Brantford | Roadways | 25 | planning | p13 · 2025 |
| Brockton | Bridge deck | 25 | accounting | p2 · 2009 |
| Chapple | Roadways, asphalt | 25 | accounting | p1 |
| Chatham-Kent | Road surface, asphalt | 25 | planning | p24 · 2025 |
| Cornwall | Roadways | 25 | planning | p252 · 2025 |
| Greater Madawaska | Road surface, asphalt | 25 | accounting | p16 · 2025 |
| Kenora | Roadways | 25 | accounting | p16 · 2026 |
| London | Roadways | 25 | planning | p157 · 2023 |
| Meaford | Road surface, asphalt | 25 | planning | p39 · 2022 |
| Northumberland | Roadways | 25 | planning | p62 · 2022 |
| Oxford | Roadways | 25 | planning | p307 · 2025 |
| Oxford | Roadways | 25 | planning | p307 · 2025 |
| Oxford | Roadways | 25 | planning | p307 · 2025 |
| Peterborough | Roadways | 25 | planning | p44 · 2025 |
| Peterborough | Roadways | 25 | planning | p44 · 2025 |
| Peterborough | Roadways | 25 | planning | p44 · 2025 |
| Severn | Road surface, asphalt | 25 | accounting | p402 · 2019 |
| Simcoe | Roadways | 25 | planning | p43 · 2025 |
| Simcoe | Roadways | 25 | planning | p43 · 2025 |
| Simcoe | Roadways | 25 | planning | p43 · 2025 |
| Thunder Bay | Roadways | 25 | planning | p50 · 2025 |
| Thunder Bay | Roadways | 25 | planning | p50 · 2025 |
| Trent Lakes | Road surface, asphalt | 25 | accounting | p10 · 2009 |
| Welland | Roadways | 25 | accounting | p9 · 2021 |
| Welland | Roadways | 25 | accounting | p9 · 2021 |
| Wellington | Roadways | 25 | planning | p95 · 2025 |
| Grey Highlands | Roadways | 25–30 | planning | p62 · 2025 |
| Amherstburg | Roadways | 25–45 | planning | p36 · 2025 |
| Amherstburg | Road surface, asphalt | 25–75 | planning | p36 · 2025 |
| Amherstburg | Roadways | 25–75 | planning | p36 · 2025 |
| Meaford | Roadways | 25–75 | accounting | p19 · 2020 |
| Haldimand County | Roadways | 25.6 | planning | p76 · 2025 |
| Cornwall | Roadways | 26.1 | planning | p252 · 2025 |
| Haldimand County | Roadways, asphalt | 28 | planning | p76 · 2025 |
| Haldimand County | Roadways | 28 | planning | p76 · 2025 |
| Amherstburg | Roadways | 30 | accounting | p7 · 2026 |
| Grey Highlands | Roadways, asphalt | 30 | accounting | p10 · 2026 |
| Kingston | Guardrail | 30 | planning | p44 · 2024 |
| Lanark | Roadways | 30 | planning | p56 · 2022 |
| Meaford | Bridge deck | 30 | accounting | p19 · 2020 |
| Meaford | Roadways, asphalt | 30 | accounting | p20 · 2020 |
| Meaford | Road surface, asphalt | 30 | planning | p40 · 2022 |
| Orillia | Roadways | 30 | planning | p65 · 2025 |
| Orillia | Roadways | 30 | planning | p65 · 2025 |
| Orillia | Roadways | 30 | planning | p65 · 2025 |
| Oxford | Guardrail | 30 | planning | p292 · 2025 |
| Oxford | Guardrail | 30 | planning | p307 · 2025 |
| Oxford | Roadways | 30 | planning | p307 · 2025 |
| Oxford | Roadways | 30 | planning | p307 · 2025 |
| Peterborough | Roadways | 30 | planning | p118 · 2025 |
| Prince Edward | Curb and gutter, concrete | 30 | accounting | p34 · 2022 |
| Prince Edward | Roadways | 30 | accounting | p34 · 2022 |
| Stormont | Roadways | 30 | planning | p17 · 2025 |
| The Blue Mountains | Roadways, gravel | 30 | accounting | p12 · 2019 |
| The Blue Mountains | Roadways, asphalt | 30 | accounting | p12 · 2019 |
| Thunder Bay | Roadways | 30 | planning | p50 · 2025 |
| Thunder Bay | Roadways | 30 | planning | p50 · 2025 |
| Trent Lakes | Roadways | 30 | planning | p68 · 2024 |
| Welland | Roadways | 30 | accounting | p9 · 2021 |
| Grey Highlands | Roadways | 30–75 | planning | p64 · 2025 |
| Wellington | Roadways | 33.75 | planning | p95 · 2025 |
| Brantford | Roadways, asphalt | 35 | planning | p13 · 2025 |
| Brockton | Road surface, asphalt | 35 | accounting | p2 · 2009 |
| Grey Highlands | Curb and gutter, concrete | 35 | accounting | p10 · 2026 |
| Kirkland Lake | Roadways | 35 | planning | p49 · 2025 |
| Quinte West · same table | Road base, granular | 35 | accounting | p36, p36 · 2024 |
| Amherstburg | Roadways | 40 | accounting | p7 · 2026 |
| Brantford | Roadways, steel | 40 | planning | p13 · 2025 |
| Chatham-Kent | Guardrail | 40 | planning | p10 · 2025 |
| Elgin | Roadways | 40 | planning | p10 · 2025 |
| Essex | Roadways, concrete | 40 | planning | p42 · 2025 |
| Essex | Roadways | 40 | planning | p60 · 2025 |
| Greater Madawaska | Road base, granular | 40 | accounting | p16 · 2025 |
| Greater Napanee | Roadways | 40 | accounting | p17 · 2012 |
| Greater Sudbury | Roadways, wood | 40 | planning | p22 · 2023 |
| Kirkland Lake | Roadways | 40 | planning | p49 · 2025 |
| Kirkland Lake | Roadways, asphalt | 40 | planning | p49 · 2025 |
| Prince Edward | Roadways | 40 | accounting | p34 · 2022 |
| Severn | Curb and gutter, concrete | 40 | accounting | p402 · 2019 |
| Simcoe | Roadways | 40 | planning | p43 · 2025 |
| Simcoe | Roadways | 40 | planning | p43 · 2025 |
| Simcoe | Roadways | 40 | planning | p43 · 2025 |
| Simcoe | Roadways | 40 | accounting | p21 · 2025 |
| The Blue Mountains | Roadways | 40 | accounting | p12 · 2019 |
| The Blue Mountains | Culvert, corrugated steel | 40 | planning | p107 · 2025 |
| Thunder Bay | Roadways | 40 | planning | p50 · 2025 |
| Thunder Bay | Roadways | 40 | planning | p50 · 2025 |
| Trent Lakes · same table | Roadways | 40 | planning | p67, p67, p67 · 2024 |
| Wellington | Roadways, wood | 40 | planning | p117 · 2025 |
| Kirkland Lake | Roadways | 40.2 | planning | p62 · 2025 |
| Haldimand County | Roadways | 43.5 | planning | p84 · 2025 |
| Barrie | Roadways | 45 | planning | p76 · 2025 |
| Chatham-Kent | Roadways | 45 | planning | p10 · 2025 |
| Chatham-Kent | Curb and gutter, concrete | 45 | planning | p10 · 2025 |
| Greater Napanee | Bridge, concrete | 45 | accounting | p17 · 2012 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p157 · 2023 |
| London | Roadways | 45 | planning | p197 · 2023 |
| Northumberland | Roadways, asphalt | 45 | planning | p62 · 2022 |
| Orillia | Roadways | 45 | accounting | p23 |
| Sarnia | Roadways | 45 | accounting | p2 |
| Bruce | Roadways | 45.4 | planning | p56 · 2025 |
| Amherstburg | Roadways | 50 | planning | p36 · 2025 |
| Brantford | Roadways | 50 | planning | p12 · 2025 |
| Brantford | Roadways | 50 | planning | p12 · 2025 |
| Brantford | Roadways | 50 | planning | p12 · 2025 |
| Brantford | Roadways | 50 | planning | p12 · 2025 |
| Brantford | Roadways, wood | 50 | planning | p13 · 2025 |
| Brantford | Roadways | 50 | planning | p13 · 2025 |
| Brantford | Roadways, concrete | 50 | planning | p13 · 2025 |
| Brockton | Roadways | 50 | accounting | p2 · 2009 |
| Centre Hastings | Roadways | 50 | planning | p58 · 2025 |
| Centre Hastings | Road base, granular | 50 | accounting | p5 |
| Greater Napanee | Roadways, concrete | 50 | accounting | p17 · 2012 |
| Grey Highlands | Road base, granular | 50 | accounting | p10 · 2026 |
| Haldimand County | Roadways | 50 | planning | p84 · 2025 |
| Halton | Roadways | 50 | planning | p107 · 2025 |
| Halton | Roadways | 50 | planning | p107 · 2025 |
| Halton | Roadways | 50 | planning | p107 · 2025 |
| Huron | Road base, granular | 50 | planning | p17 · 2025 |
| Kenora | Roadways | 50 | accounting | p16 · 2026 |
| Kingston | Roadways | 50 | accounting | p14 · 2016 |
| Kingston | Roadways | 50 | accounting | p14 · 2016 |
| Kingston | Roadways | 50 | accounting | p14 · 2016 |
| Kirkland Lake | Roadways | 50 | accounting | p10 · 2020 |
| Kirkland Lake | Roadways | 50 | accounting | p10 · 2020 |
| Kirkland Lake | Curb and gutter, concrete | 50 | planning | p49 · 2025 |
| Kirkland Lake | Roadways | 50 | planning | p62 · 2025 |
| Meaford | Roadways | 50 | accounting | p19 · 2020 |
| Meaford | Roadways, gravel | 50 | accounting | p19 · 2020 |
| Meaford · same table | Road base, granular | 50 | planning | p40, p40 · 2022 |
| Norfolk County | Guardrail | 50 | planning | p49 · 2025 |
| Norfolk County | Roadways | 50 | planning | p49 · 2025 |
| Norfolk County | Roadways | 50 | planning | p49 · 2025 |
| Orillia | Roadways, steel | 50 | accounting | p23 |
| Oxford | Roadways | 50 | planning | p307 · 2025 |
| Peterborough | Roadways | 50 | planning | p60 · 2025 |
| Prince Edward | Road base, granular | 50 | accounting | p34 · 2022 |
| Rainy River | Roadways | 50 | planning | p17 · 2026 |
| Sarnia | Roadways | 50 | accounting | p2 |
| Sarnia | Roadways | 50 | accounting | p2 |
| Sault Ste. Marie | Roadways | 50 | planning | p17 · 2025 |
| Severn | Roadways | 50 | accounting | p402 · 2019 |
| The Blue Mountains | Roadways, asphalt | 50 | accounting | p12 · 2019 |
| Thunder Bay | Roadways | 50 | planning | p51 · 2025 |
| Welland | Roadways | 50 | accounting | p9 · 2021 |
| Wellington | Roadways, steel | 50 | planning | p51 · 2025 |
| Greater Madawaska, Quinte West · same table | Roadways | 50–75 | accounting | p16, p17, p36, p36 · 2025 |
| Grey Highlands | Roadways | 50–75 | accounting | p10 · 2026 |
| Meaford | Roadways | 50–75 | accounting | p19 · 2020 |
| Sault Ste. Marie | Roadways | 58 | planning | p17 · 2025 |
| Amherstburg | Roadways | 60 | planning | p36 · 2025 |
| Barrie | Roadways | 60 | planning | p76 · 2025 |
| Brantford | Roadways | 60 | planning | p13 · 2025 |
| Chatham-Kent | Roadways | 60 | planning | p10 · 2025 |
| Greater Sudbury | Roadways | 60 | planning | p22 · 2023 |
| Greater Sudbury | Roadways | 60 | planning | p34 · 2023 |
| Greater Sudbury | Roadways, gravel | 60 | planning | p34 · 2023 |
| Kingston | Roadways | 60 | accounting | p15 · 2016 |
| Kingston | Roadways | 60 | accounting | p15 · 2016 |
| Oxford | Roadways | 60 | planning | p292 · 2025 |
| Prescott and Russell | Roadways | 60 | planning | p47 · 2025 |
| Prescott and Russell | Roadways | 60 | planning | p57 · 2025 |
| Prince Edward | Roadways | 60 | accounting | p34 · 2022 |
| Severn | Roadways | 60 | accounting | p402 · 2019 |
| Trent Lakes | Road base, granular | 60 | accounting | p10 · 2009 |
| Trent Lakes | Roadways | 60 | planning | p67 · 2024 |
| Wellington | Roadways, concrete | 60 | planning | p51 · 2025 |
| Peterborough | Roadways | 61.5 | planning | p60 · 2025 |
| Cornwall | Roadways | 65.1 | planning | p252 · 2025 |
| Cornwall | Roadways | 66 | planning | p252 · 2025 |
| Peterborough | Roadways | 69 | planning | p118 · 2025 |
| Barrie | Roadways | 70 | planning | p76 · 2025 |
| Chatham-Kent | Roadways | 70 | planning | p9 · 2025 |
| Chatham-Kent | Roadways | 70 | planning | p9 · 2025 |
| Halton | Roadways | 70 | planning | p107 · 2025 |
| Prescott and Russell | Road base, granular | 70 | planning | p46 · 2025 |
| Toronto | Roadways | 70 | planning | p294 · 2025 |
| Bruce | Road base, granular | 70.9 | planning | p44 · 2025 |
| Wellington | Roadways, steel | 73 | planning | p51 · 2025 |
| Cornwall | Roadways | 73.7 | planning | p252 · 2025 |
| Barrie | Roadways | 75 | planning | p76 · 2025 |
| Brantford | Bridge, concrete | 75 | planning | p12 · 2025 |
| Brantford | Bridge, steel | 75 | planning | p12 · 2025 |
| Brantford | Roadways | 75 | planning | p12 · 2025 |
| Brantford | Roadways, concrete | 75 | planning | p12 · 2025 |
| Brantford | Roadways, steel | 75 | planning | p12 · 2025 |
| Brantford | Roadways | 75 | planning | p12 · 2025 |
| Brantford | Roadways, concrete | 75 | planning | p12 · 2025 |
| Brantford | Roadways, steel | 75 | planning | p12 · 2025 |
| Brantford | Roadways | 75 | planning | p12 · 2025 |
| Brantford | Roadways, concrete | 75 | planning | p12 · 2025 |
| Brantford | Roadways, steel | 75 | planning | p12 · 2025 |
| Brantford | Roadways | 75 | planning | p12 · 2025 |
| Brockton | Roadways | 75 | accounting | p2 · 2009 |
| Brockton | Roadways | 75 | accounting | p2 · 2009 |
| Chapple | Roadways | 75 | planning | p65 · 2025 |
| Elgin | Bridge, concrete | 75 | planning | p10 · 2025 |
| Elgin | Bridge, steel | 75 | planning | p10 · 2025 |
| Greater Sudbury | Road, gravel | 75 | planning | p22 · 2023 |
| Huron | Roadways | 75 | planning | p26 · 2025 |
| Kapuskasing | Roadways | 75 | accounting | p15 · 2009 |
| Lambton | Roadways | 75 | planning | p89 · 2025 |
| Leeds and Grenville | Roadways | 75 | planning | p49 · 2025 |
| Meaford | Roadways | 75 | planning | p79 · 2022 |
| Middlesex | Roadways | 75 | planning | p18 · 2022 |
| Norfolk County | Roadways | 75 | planning | p49 · 2025 |
| Northumberland | Roadways | 75 | planning | p62 · 2022 |
| Orillia | Roadways | 75 | planning | p65 · 2025 |
| Orillia | Roadways | 75 | planning | p65 · 2025 |
| Prince Edward | Roadways | 75 | accounting | p34 · 2022 |
| Simcoe | Roadways | 75 | planning | p68 · 2025 |
| Simcoe | Roadways | 75 | planning | p68 · 2025 |
| Simcoe | Roadways | 75 | accounting | p21 · 2025 |
| The Blue Mountains | Roadways | 75 | accounting | p12 · 2019 |
| The Blue Mountains | Roadways | 75 | planning | p107 · 2025 |
| Toronto | Roadways | 75 | planning | p294 · 2025 |
| Toronto | Roadways | 75 | planning | p295 · 2025 |
| Welland | Roadways | 75 | accounting | p9 · 2021 |
| Welland | Roadways | 75 | accounting | p9 · 2021 |
| Wellington | Roadways, concrete | 75 | planning | p117 · 2025 |
| York | Roadways | 75 | planning | p53 · 2024 |
| Amherstburg | Roadways | 75–80 | planning | p51 · 2025 |
| Brockton | Roadways | 80 | accounting | p2 · 2009 |
| Brockton | Roadways | 80 | accounting | p2 · 2009 |
| Chapple | Roadways | 80 | accounting | p1 |
| Chapple | Road, gravel | 80 | accounting | p1 |
| Chatham-Kent | Roadways | 80 | planning | p10 · 2025 |
| Chatham-Kent | Roadways | 80 | planning | p10 · 2025 |
| Essex | Roadways | 80 | planning | p60 · 2025 |
| London | Roadways | 80 | planning | p158 · 2023 |
| London | Roadways | 80 | planning | p158 · 2023 |
| Meaford | Roadways, asphalt | 80 | accounting | p19 · 2020 |
| Meaford | Road base, granular | 80 | planning | p40 · 2022 |
| Rainy River | Road base, granular | 80 | accounting | p11 · 2010 |
| Rainy River | Road, gravel | 80 | accounting | p11 · 2010 |
| Rainy River | Road, gravel | 80 | planning | p17 · 2026 |
| Wellington | Roadways, concrete | 84.08 | planning | p51 · 2025 |
| Brantford | Road base, granular | 85 | planning | p13 · 2025 |
| Simcoe | Roadways | 85 | planning | p43 · 2025 |
| Simcoe | Roadways | 85 | planning | p43 · 2025 |
| Simcoe | Roadways | 85 | planning | p43 · 2025 |
| Lanark | Bridge, concrete | 90 | planning | p78 · 2022 |
| Cornwall | Roadways | 100 | planning | p252 · 2025 |
| Cornwall | Roadways | 100 | planning | p253 · 2025 |
| Cornwall | Roadways | 100 | planning | p253 · 2025 |
| Cornwall | Roadways | 100 | planning | p253 · 2025 |
| Lanark | Bridge, concrete | 100 | planning | p78 · 2022 |
| Orillia | Roadways | 100 | accounting | p23 |
| Toronto | Roadways | 100 | planning | p295 · 2025 |
| Toronto | Roadways | 100 | planning | p295 · 2025 |
| Prescott and Russell | Roadways | 110 | planning | p52 · 2025 |
| Lanark | Bridge, steel | 115 | planning | p78 · 2022 |
| Lanark | Roadways | 166 | planning | p78 · 2022 |
| Rainy River | Road base, granular | 200 | planning | p17 · 2026 |
Of 349 rows, 29 were compared with an image of their page; 320 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
3 tasks in 3 work orders.
Weekly · 1 task
Source: O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018, s.3 Table Patrolling Frequency (Class 3 highways)
| Task | Page |
|---|---|
| Patrol Class 3 municipal roads to check for the conditions set out in the regulation (potholes, cracks, discontinuities, drop-offs) | pundefined |
Every 2 weeks · 1 task
Source: O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018, s.3 Table Patrolling Frequency (Class 4 highways)
| Task | Page |
|---|---|
| Patrol Class 4 municipal roads to check for the conditions set out in the regulation | pundefined |
Every 30 days · 1 task
Source: O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways (Municipal Act, 2001), consolidated from May 3, 2018, s.3 Table Patrolling Frequency (Class 5 highways)
| Task | Page |
|---|---|
| Patrol Class 5 municipal roads to check for the conditions set out in the regulation | pundefined |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
- A municipal minimum standard tied to the statutory defence in s.44 of the Municipal Act, 2001; patrolling is a drive-by observation of the whole road, not a component-level inspection. Not an official version.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Road surface treatment, v0.5.0. https://unfinished.one/c/road-surface-treatment/v/0.5.0BibTeX
@misc{unfinished_road_surface_treatment_0_5_0,
title = {Road surface treatment},
author = {{unfinished.one}},
year = {2026},
version = {0.5.0},
url = {https://unfinished.one/c/road-surface-treatment/v/0.5.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.6.0, 0.5.0, 0.2.0, 0.1.0