Service life

60 yearsmedian of the stated lives · sources say 50–75 years
01020304050607080905075

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Basis

  • 50 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p18 · “Wastewater Mains - Manholes” (accounting life)
    Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
  • 75 years · Kingston: Tangible Capital Assets Policy, p16 · “Sewer Utility - Sewer - manholes” (accounting life)
    Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
  • 60 years · Prince Edward: FIN-12 Tangible Capital Assets Policy, p34 · “Sewer - Manholes (Pooled)” (accounting life)
    Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
  • 60 years · Design standards: employer's requirements – Technical Manual (ER-DFE-XX-XX-T-X-0201, revision A-C01), p222 · 5.2.4 “Below ground drainage and manholes: 60 years” — Department for Education (England) (design life)
    Printed page 222. On-site below-ground drainage and manholes of a school, not a municipal network; foul or surface water not stated. Minimum life expectancy (design requirement) for DfE-funded school buildings. Minimum design requirements placed on contractors for school buildings, not observed replacement ages. Section 5.1.4 (sanitaryware) refers to CIBSE Guide M Appendix 12.A1 'in general'.
  • 50 years · General depreciation rates (IR265), July 2021, p46 · BUIL “Manholes” — Inland Revenue (Te Tari Taake), New Zealand (accounting life)
    Printed page 46. Manholes, service not stated. Buildings and structures category. Printed DV 4%, SL 3%. Tax depreciation lives set by the Commissioner of Inland Revenue for New Zealand income tax, not engineering or asset-management lives; they are banded and often short (e.g. reticulation piping 25 years). The July 2021 edition was the newest PDF reachable; the online Depreciation Rate Finder may hold later determinations.

How sources are chosen and recorded: sourcing policy.

Municipal lives for sanitary sewer (G3020)

33 municipalities in Ontario state a life for sanitary sewer as a whole, in 39 distinct tables: 9.3–150 years, median 75. 56 rows come from capital asset policies (accounting lives, used for amortization) and 139 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 75 yearsHaldimand County: Sanitary - General Equipment, 9.3 yearsChapple: Sewer Equipment, 10 yearsCornwall: Wastewater Treatment - Process Instrumentation, 10 yearsSarnia: Wastewater Pumping Stations - mechanical/equipment, 15 yearsCornwall: Wastewater Treatment - Process Mechanical, 20 yearsKenora: Wastewater Mains - Metal, 25 yearsSarnia: Wastewater Pumping Stations - pumps, 25 yearsThunder Bay: WPCP Process Assets, 26 yearsPeterborough: Wastewater Facilities (average), 28 yearsCornwall: Wastewater Treatment - Process Electrical, 30 yearsCornwall: Wastewater Treatment - Process Piping, 30 yearsOxford: Mount Elgin wastewater - Collection Tanks, 30 yearsRainy River: Building Improvements - Lift Station pumps/inlet pipes, 30 yearsRainy River: Building Improvements - Lift Station pumps/inlet pipes, 30 yearsChapple: Sewage Lift Station, 32 yearsOrillia: Wastewater Treatment Centre, 32.2 yearsKirkland Lake: Sanitary Treatment, 37.6 yearsChapple: Sewer Mains, 40 yearsKapuskasing: Wastewater Treatment Plant (Upgrade at 40 years), 40 yearsSevern: Buildings/Structures - Water & Sewer - Lift Station, 40 yearsSevern: Buildings/Structures - Water & Sewer - Lagoon Structure, 40 yearsHaldimand County: Sanitary Treatment Plant, 40.4 yearsHalton: Wastewater Pumping Stations, 41 yearsBrantford: Collection - Wastewater Pump Stations, 44 yearsLondon: Pump stations, 44 yearsOrillia: Pumping Stations, 44.5 yearsHalton: Wastewater Storage Tank, 46 yearsHaldimand County: Sanitary Pumping Station, 46.8 yearsKirkland Lake: Sanitary - Pumping Station, 48.6 yearsHaldimand County: Sanitary Lagoons, 49.3 yearsAmherstburg: Infrastructure - Wastewater - Pump Stations, 50 yearsBarrie: Sewer Laterals, 50 yearsBarrie: Maintenance Holes, 50 yearsBelleville: Table B 5 Wastewater Pipework - Vitrified Clay (all diameters), 50 yearsBelleville: Table B 5 Wastewater Pipework - Vit. Clay (all diameters), 50 yearsBelleville: Table B 6 Sanitary Pipework - Vitrified Clay (all diameters), 50 yearsBelleville: Table B 6 Sanitary Pipework - CSP (all diameters), 50 yearsChapple: Site Works - Septic Systems & Wells etc., 50 yearsChatham-Kent: Sewage Lagoons (2), 50 yearsChatham-Kent: Pump Stations (55), 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Wet Well, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Dry Well, 50 yearsHaldimand County: Sanitary - General Building, 50 yearsKapuskasing: Sanitary Sewer Collections System (pipes, force mains, etc), 50 yearsKapuskasing: Wastewater Lift Stations, 50 yearsKenora: Wastewater Mains - Clay Tile, 50 yearsKenora: Wastewater Mains - Manholes, 50 yearsKingston: Sewer Utility - Sewer pipes: DI, 50 yearsKingston: Sewer Utility - Sewer pipes: Asbestos Cement, 50 yearsKirkland Lake: Sanitary Sewer Collections System (pipes, force mains, etc), 50 yearsKirkland Lake: Sanitary - Manholes, 50 yearsMeaford: Wet Well, 50 yearsMeaford: Dry Well, 50 yearsNorfolk County: Vertical - Sewage Pumping Stations, 50 yearsNorfolk County: Vertical - Wastewater Treatment Plants, 50 yearsOrillia: Land Improvement (Infrastructure) - Lagoons and Inlet Structures, 50 yearsQuinte West: Pipe Relining, 50 yearsThe Blue Mountains: Wet Well, 50 yearsThe Blue Mountains: Dry Well, 50 yearsNorfolk County: Linear - Sanitary Forcemains, 52 yearsGreater Sudbury: AC Cement Sewer, 55 yearsSault Ste. Marie: Pump Stations, 57 yearsCornwall: CSO Chamber, 58.9 yearsSault Ste. Marie: WWTP-EE (East End plant, weighted average of components), 59 yearsCentre Hastings: Sewer, 60 yearsCentre Hastings: Sewer infrastructure, 60 yearsGreater Sudbury: Cast Iron Sewer, 60 yearsGreater Sudbury: Steel Sewer, 60 yearsGreater Sudbury: Service Connection, 60 yearsKingston: Sewer Utility - Sewer pipes: Concrete, 60 yearsPrince Edward: Sewer - Sanitary Laterals (Pooled), 60 yearsPrince Edward: Sewer - Manholes (Pooled), 60 yearsThunder Bay: Lift Stations, 60 yearsThunder Bay: WPCP Building, 60 yearsBrantford: Treatment - Wastewater Treatment Plant, 61 yearsSault Ste. Marie: WWTP-WE (West End plant, weighted average of components), 62 yearsCornwall: Wastewater Treatment Plant, 63.5 yearsKingston: Sewer Utility - Sewer pipes: Average, 64 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Ductile Iron, 65 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Clay, 70 yearsCornwall: Combined Sewer - Asbestos Cement, 70 yearsCornwall: Sanitary Sewer - Asbestos Cement, 70 yearsGreater Sudbury: Maintenance Hole, 70 yearsKingston: Sewer Utility - Sewer pipes: HDPE, 70 yearsNorfolk County: Linear - Sanitary Mains, 70 yearsKirkland Lake: Sewerlines, 72.4 yearsBelleville: Table B 5 Wastewater Pipework - Concrete (all diameters), 75 yearsBelleville: Table B 5 Wastewater Pipework - Ductile Iron (all diameters), 75 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Asbestos Cement, 75 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Unknown, 75 yearsBrantford: Collection - Forcemains - Asbestos Cement, 75 yearsChapple: Lagoons, 75 yearsChapple: Lagoons, 75 yearsChatham-Kent: Sanitary Force Mains (70 km), 75 yearsChatham-Kent: Gravity Mains (550 km), 75 yearsChatham-Kent: Combined Sewers (50 km), 75 yearsChatham-Kent: Sanitary Manholes (6600), 75 yearsGrey Highlands: Sanitary Sewer Pipe, 75 yearsHaldimand County: Sanitary Pipe, 75 yearsKenora: Wastewater Mains - PVC, 75 yearsKenora: Pumping / Lift Stations, 75 yearsKingston: Sewer Utility - Sewer Facilities: Tankage, 75 yearsKingston: Sewer Utility - Sewer pipes: CI, 75 yearsKingston: Sewer Utility - Sewer - manholes, 75 yearsMeaford: Sanitary Pumping Station, 75 yearsOrillia: Forcemains, 75 yearsOrillia: Sewermains (<200mm), 75 yearsOrillia: Sewermains (200-300mm), 75 yearsOrillia: Sewermains (>300mm), 75 yearsPeterborough: Wastewater Conveyance (average), 75 yearsRainy River: Sewage Lagoon Cells, 75 yearsRainy River: Sewage Lagoon Cells, 75 yearsSault Ste. Marie: Conveyance - Force Main, 75 yearsSault Ste. Marie: Conveyance - Gravity Main, 78 yearsBarrie: Wastewater Mains (Remaining Assets), 80 yearsBrockton: Sewer Lines - Concrete, 80 yearsBrockton: Sewer Lines - Brick, 80 yearsBrockton: Sewer Lines - Metal, 80 yearsGreater Sudbury: HDPE Sewer, 80 yearsKapuskasing: Wastewater Piping, 80 yearsKingston: Sewer Utility - Sewer pipes: PVC, 80 yearsMeaford: Force main, 80 yearsQuinte West: Sanitary Sewer Mains - Polyethylene, 80 yearsSault Ste. Marie: Conveyance - Manhole and Chamber, 80 yearsSault Ste. Marie: Conveyance - Service Connections, 80 yearsSevern: Infrastructure - Water & Sewer - Sanitary Sewers, 80 yearsWelland: Sanitary & Storm Sewers (by component) - Sewers Mains & Tunnels (Storm/Sanitary/Combined), 80 yearsWelland: Sanitary & Storm Sewers (by component) - Pipe & Tunnel Linings, 80 yearsWelland: Sanitary & Storm Sewers (by component) - Laterals (includes fittings), 80 yearsWelland: Sanitary & Storm Sewers (by component) - Manholes, Shafts & Chambers, 80 yearsHalton: Forcemains, 83 yearsHalton: Gravity Mains, 85 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - ABS (Acrylonitrile Butadiene Styrene), 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Cast Iron, 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - FRP (Fibreglass Reinforced Pipe), 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - HDPE (High Density Polyethylene), 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Steel, 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Polyethylene, 90 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - PVC (Polyvinyl chloride), 90 yearsBrantford: Collection - Forcemains - PVC, 90 yearsBrantford: Collection - Forcemains - Polyethylene, 90 yearsGreater Sudbury: Concrete Sewer, 90 yearsOxford: Woodstock wastewater - Sanitary Main (>=450mm), 90 yearsOxford: Woodstock wastewater - Sanitary Main (<450mm), 90 yearsOxford: Woodstock wastewater - Sanitary Service Connection, 90 yearsThunder Bay: Sanitary Sewers, 93 yearsCornwall: Sanitary Sewers, 94.7 yearsLondon: Local sewers (<450 mm), 95 yearsCornwall: Combined Sewers, 99.6 yearsAmherstburg: Infrastructure - Wastewater - Sewer Mains, 100 yearsBarrie: Wastewater Mains (Vitrified Clay), 100 yearsBelleville: Table B 5 Wastewater Pipework - PVC (all diameters), 100 yearsBelleville: Table B 5 Wastewater Pipework - AC (all diameters), 100 yearsBelleville: Table B 6 Sanitary Pipework - Concrete (all diameters), 100 yearsBrantford: Collection - Gravity Main Siphons / WW Services / SW Services - Concrete, 100 yearsBrockton: Sewer Lines - Polyethylene (PVC), 100 yearsCornwall: Combined Sewer - Concrete Pipe, 100 yearsCornwall: Combined Sewer - Reinforced Concrete, 100 yearsCornwall: Combined Sewer - Stone, 100 yearsCornwall: Combined Sewer - Vitrified Clay, 100 yearsCornwall: Sanitary Pumping Stations, 100 yearsCornwall: Sanitary Sewer - Concrete Pipe, 100 yearsCornwall: Sanitary Sewer - Concrete Pressure Pipe, 100 yearsCornwall: Sanitary Sewer - Reinforced Concrete, 100 yearsCornwall: Sanitary Sewer - Vitrified Clay, 100 yearsHaldimand County: Sanitary Manhole, 100 yearsKenora: Wastewater Mains - Concrete, 100 yearsKenora: Wastewater Mains - PE, 100 yearsLondon: Trunk sewers (450 mm to <1500 mm), 100 yearsLondon: Trunk sewers (> and equal to 1500 mm), 100 yearsLondon: Storage tanks, 100 yearsLondon: Forcemains, 100 yearsQuinte West: Pipe Replacement, 100 yearsGreater Sudbury: PVC Sewer, 105 yearsCornwall: Forcemains, 108.3 yearsCornwall: Combined Sewer - Polyvinyl Chloride, 110 yearsCornwall: Sanitary Sewer - Ductile Iron, 110 yearsCornwall: Sanitary Sewer - High-Density Polyethylene, 110 yearsCornwall: Sanitary Sewer - Polyvinyl Chloride, 110 yearsBarrie: Wastewater Mains (PVC), 120 yearsCornwall: Combined Sewer - Brick, 120 yearsBelleville: Table B 6 Sanitary Pipework - PVC (all diameters), 125 yearsBelleville: Table B 6 Sanitary Pipework - RCP (all diameters), 125 yearsChatham-Kent: Wastewater Treatment Plants (7), 50–60 yearsToronto: Conveyance - Linear Infrastructure (Forcemains, Trunk & Local Sewers), 50–150 yearsPrince Edward: Sewer - Sewer Mains, 60–80 years020406080100120140160

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 186 stated lives
MunicipalityAs writtenYearsKindSource
Haldimand CountySanitary - General Equipment9.3planningp107 · 2025
ChappleSewer Equipment10planningp86 · 2025
CornwallWastewater Treatment - Process Instrumentation10planningp372 · 2025
SarniaWastewater Pumping Stations - mechanical/equipment15accountingp1
CornwallWastewater Treatment - Process Mechanical20planningp372 · 2025
KenoraWastewater Mains - Metal25accountingp18 · 2026
SarniaWastewater Pumping Stations - pumps25accountingp1
Thunder BayWPCP Process Assets26planningp105 · 2025
PeterboroughWastewater Facilities (average)28planningp182 · 2025
CornwallWastewater Treatment - Process Electrical30planningp372 · 2025
CornwallWastewater Treatment - Process Piping30planningp372 · 2025
OxfordMount Elgin wastewater - Collection Tanks30planningp168 · 2025
Rainy RiverBuilding Improvements - Lift Station pumps/inlet pipes30accountingp11 · 2010
Rainy RiverBuilding Improvements - Lift Station pumps/inlet pipes30planningp17 · 2026
ChappleSewage Lift Station32planningp86 · 2025
OrilliaWastewater Treatment Centre32.2planningp123 · 2025
Kirkland LakeSanitary Treatment37.6planningp83 · 2025
ChappleSewer Mains40planningp86 · 2025
KapuskasingWastewater Treatment Plant (Upgrade at 40 years)40planningp7 · 2022
SevernBuildings/Structures - Water & Sewer - Lift Station40accountingp400 · 2019
SevernBuildings/Structures - Water & Sewer - Lagoon Structure40accountingp400 · 2019
Haldimand CountySanitary Treatment Plant40.4planningp107 · 2025
HaltonWastewater Pumping Stations41planningp86 · 2025
BrantfordCollection - Wastewater Pump Stations44planningp11 · 2025
LondonPump stations44planningp95 · 2023
OrilliaPumping Stations44.5planningp123 · 2025
HaltonWastewater Storage Tank46planningp86 · 2025
Haldimand CountySanitary Pumping Station46.8planningp107 · 2025
Kirkland LakeSanitary - Pumping Station48.6planningp83 · 2025
Haldimand CountySanitary Lagoons49.3planningp107 · 2025
AmherstburgInfrastructure - Wastewater - Pump Stations50accountingp7 · 2026
BarrieSewer Laterals50planningp165 · 2025
BarrieMaintenance Holes50planningp165 · 2025
BellevilleTable B 5 Wastewater Pipework - Vitrified Clay (all diameters)50planningp119 · 2022
BellevilleTable B 5 Wastewater Pipework - Vit. Clay (all diameters)50planningp119 · 2022
BellevilleTable B 6 Sanitary Pipework - Vitrified Clay (all diameters)50planningp119 · 2022
BellevilleTable B 6 Sanitary Pipework - CSP (all diameters)50planningp119 · 2022
ChappleSite Works - Septic Systems & Wells etc.50accountingp1
Chatham-KentSewage Lagoons (2)50planningp12 · 2025
Chatham-KentPump Stations (55)50planningp12 · 2025
Grey HighlandsWater & Wastewater Treatment Assets - Wet Well50accountingp11 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Dry Well50accountingp11 · 2026
Haldimand CountySanitary - General Building50planningp107 · 2025
KapuskasingSanitary Sewer Collections System (pipes, force mains, etc)50accountingp15 · 2009
KapuskasingWastewater Lift Stations50planningp7 · 2022
KenoraWastewater Mains - Clay Tile50accountingp18 · 2026
KenoraWastewater Mains - Manholes50accountingp18 · 2026
KingstonSewer Utility - Sewer pipes: DI50accountingp16 · 2016
KingstonSewer Utility - Sewer pipes: Asbestos Cement50accountingp16 · 2016
Kirkland LakeSanitary Sewer Collections System (pipes, force mains, etc)50accountingp10 · 2020
Kirkland LakeSanitary - Manholes50planningp83 · 2025
MeafordWet Well50accountingp18 · 2020
MeafordDry Well50accountingp18 · 2020
Norfolk CountyVertical - Sewage Pumping Stations50planningp67 · 2025
Norfolk CountyVertical - Wastewater Treatment Plants50planningp67 · 2025
OrilliaLand Improvement (Infrastructure) - Lagoons and Inlet Structures50accountingp22
Quinte WestPipe Relining50planningp22 · 2025
The Blue MountainsWet Well50accountingp11 · 2019
The Blue MountainsDry Well50accountingp11 · 2019
Chatham-KentWastewater Treatment Plants (7)50–60planningp12 · 2025
TorontoConveyance - Linear Infrastructure (Forcemains, Trunk & Local Sewers)50–150planningp366 · 2025
Norfolk CountyLinear - Sanitary Forcemains52planningp67 · 2025
Greater SudburyAC Cement Sewer55planningp28 · 2023
Sault Ste. MariePump Stations57planningp14 · 2025
CornwallCSO Chamber58.9planningp299 · 2025
Sault Ste. MarieWWTP-EE (East End plant, weighted average of components)59planningp14 · 2025
Centre HastingsSewer60planningp64 · 2025
Centre HastingsSewer infrastructure60accountingp5
Greater SudburyCast Iron Sewer60planningp28 · 2023
Greater SudburySteel Sewer60planningp28 · 2023
Greater SudburyService Connection60planningp28 · 2023
KingstonSewer Utility - Sewer pipes: Concrete60accountingp16 · 2016
Prince EdwardSewer - Sanitary Laterals (Pooled)60accountingp34 · 2022
Prince EdwardSewer - Manholes (Pooled)60accountingp34 · 2022
Thunder BayLift Stations60planningp105 · 2025
Thunder BayWPCP Building60planningp105 · 2025
Prince EdwardSewer - Sewer Mains60–80accountingp34 · 2022
BrantfordTreatment - Wastewater Treatment Plant61planningp11 · 2025
Sault Ste. MarieWWTP-WE (West End plant, weighted average of components)62planningp14 · 2025
CornwallWastewater Treatment Plant63.5planningp372 · 2025
KingstonSewer Utility - Sewer pipes: Average64accountingp16 · 2016
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Ductile Iron65planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Clay70planningp10 · 2025
CornwallCombined Sewer - Asbestos Cement70planningp300 · 2025
CornwallSanitary Sewer - Asbestos Cement70planningp317 · 2025
Greater SudburyMaintenance Hole70planningp28 · 2023
KingstonSewer Utility - Sewer pipes: HDPE70accountingp16 · 2016
Norfolk CountyLinear - Sanitary Mains70planningp67 · 2025
Kirkland LakeSewerlines72.4planningp83 · 2025
BellevilleTable B 5 Wastewater Pipework - Concrete (all diameters)75planningp119 · 2022
BellevilleTable B 5 Wastewater Pipework - Ductile Iron (all diameters)75planningp119 · 2022
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Asbestos Cement75planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Unknown75planningp10 · 2025
BrantfordCollection - Forcemains - Asbestos Cement75planningp11 · 2025
ChappleLagoons75planningp86 · 2025
ChappleLagoons75accountingp1
Chatham-KentSanitary Force Mains (70 km)75planningp12 · 2025
Chatham-KentGravity Mains (550 km)75planningp12 · 2025
Chatham-KentCombined Sewers (50 km)75planningp12 · 2025
Chatham-KentSanitary Manholes (6600)75planningp12 · 2025
Grey HighlandsSanitary Sewer Pipe75accountingp10 · 2026
Haldimand CountySanitary Pipe75planningp107 · 2025
KenoraWastewater Mains - PVC75accountingp18 · 2026
KenoraPumping / Lift Stations75accountingp18 · 2026
KingstonSewer Utility - Sewer Facilities: Tankage75accountingp16 · 2016
KingstonSewer Utility - Sewer pipes: CI75accountingp16 · 2016
KingstonSewer Utility - Sewer - manholes75accountingp16 · 2016
Meaford · same tableSanitary Pumping Station75planningp166, p166 · 2022
OrilliaForcemains75planningp123 · 2025
OrilliaSewermains (<200mm)75planningp123 · 2025
OrilliaSewermains (200-300mm)75planningp123 · 2025
OrilliaSewermains (>300mm)75planningp123 · 2025
PeterboroughWastewater Conveyance (average)75planningp182 · 2025
Rainy RiverSewage Lagoon Cells75accountingp11 · 2010
Rainy RiverSewage Lagoon Cells75planningp17 · 2026
Sault Ste. MarieConveyance - Force Main75planningp14 · 2025
Sault Ste. MarieConveyance - Gravity Main78planningp14 · 2025
BarrieWastewater Mains (Remaining Assets)80planningp165 · 2025
BrocktonSewer Lines - Concrete80accountingp2 · 2009
BrocktonSewer Lines - Brick80accountingp2 · 2009
BrocktonSewer Lines - Metal80accountingp2 · 2009
Greater SudburyHDPE Sewer80planningp28 · 2023
KapuskasingWastewater Piping80planningp7 · 2022
KingstonSewer Utility - Sewer pipes: PVC80accountingp16 · 2016
Meaford · same tableForce main80planningp165, p165, p165 · 2022
Quinte West · same tableSanitary Sewer Mains - Polyethylene80accountingp37, p37, p37, p37, p37, p38, p38 · 2024
Sault Ste. MarieConveyance - Manhole and Chamber80planningp14 · 2025
Sault Ste. MarieConveyance - Service Connections80planningp14 · 2025
SevernInfrastructure - Water & Sewer - Sanitary Sewers80accountingp403 · 2019
WellandSanitary & Storm Sewers (by component) - Sewers Mains & Tunnels (Storm/Sanitary/Combined)80accountingp9 · 2021
WellandSanitary & Storm Sewers (by component) - Pipe & Tunnel Linings80accountingp9 · 2021
WellandSanitary & Storm Sewers (by component) - Laterals (includes fittings)80accountingp9 · 2021
WellandSanitary & Storm Sewers (by component) - Manholes, Shafts & Chambers80accountingp9 · 2021
HaltonForcemains83planningp86 · 2025
HaltonGravity Mains85planningp86 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - ABS (Acrylonitrile Butadiene Styrene)90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Cast Iron90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - FRP (Fibreglass Reinforced Pipe)90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - HDPE (High Density Polyethylene)90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Steel90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Polyethylene90planningp10 · 2025
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - PVC (Polyvinyl chloride)90planningp10 · 2025
BrantfordCollection - Forcemains - PVC90planningp11 · 2025
BrantfordCollection - Forcemains - Polyethylene90planningp11 · 2025
Greater SudburyConcrete Sewer90planningp28 · 2023
OxfordWoodstock wastewater - Sanitary Main (>=450mm)90planningp31 · 2025
OxfordWoodstock wastewater - Sanitary Main (<450mm)90planningp31 · 2025
OxfordWoodstock wastewater - Sanitary Service Connection90planningp31 · 2025
Thunder BaySanitary Sewers93planningp105 · 2025
CornwallSanitary Sewers94.7planningp316 · 2025
LondonLocal sewers (<450 mm)95planningp95 · 2023
CornwallCombined Sewers99.6planningp299 · 2025
AmherstburgInfrastructure - Wastewater - Sewer Mains100accountingp7 · 2026
BarrieWastewater Mains (Vitrified Clay)100planningp165 · 2025
BellevilleTable B 5 Wastewater Pipework - PVC (all diameters)100planningp119 · 2022
BellevilleTable B 5 Wastewater Pipework - AC (all diameters)100planningp119 · 2022
BellevilleTable B 6 Sanitary Pipework - Concrete (all diameters)100planningp119 · 2022
BrantfordCollection - Gravity Main Siphons / WW Services / SW Services - Concrete100planningp10 · 2025
BrocktonSewer Lines - Polyethylene (PVC)100accountingp3 · 2009
CornwallCombined Sewer - Concrete Pipe100planningp300 · 2025
CornwallCombined Sewer - Reinforced Concrete100planningp300 · 2025
CornwallCombined Sewer - Stone100planningp300 · 2025
CornwallCombined Sewer - Vitrified Clay100planningp300 · 2025
CornwallSanitary Pumping Stations100planningp316 · 2025
CornwallSanitary Sewer - Concrete Pipe100planningp317 · 2025
CornwallSanitary Sewer - Concrete Pressure Pipe100planningp317 · 2025
CornwallSanitary Sewer - Reinforced Concrete100planningp317 · 2025
CornwallSanitary Sewer - Vitrified Clay100planningp317 · 2025
Haldimand CountySanitary Manhole100planningp107 · 2025
KenoraWastewater Mains - Concrete100accountingp18 · 2026
KenoraWastewater Mains - PE100accountingp18 · 2026
LondonTrunk sewers (450 mm to <1500 mm)100planningp95 · 2023
LondonTrunk sewers (> and equal to 1500 mm)100planningp95 · 2023
LondonStorage tanks100planningp95 · 2023
LondonForcemains100planningp95 · 2023
Quinte WestPipe Replacement100planningp22 · 2025
Greater SudburyPVC Sewer105planningp28 · 2023
CornwallForcemains108.3planningp316 · 2025
CornwallCombined Sewer - Polyvinyl Chloride110planningp300 · 2025
CornwallSanitary Sewer - Ductile Iron110planningp317 · 2025
CornwallSanitary Sewer - High-Density Polyethylene110planningp317 · 2025
CornwallSanitary Sewer - Polyvinyl Chloride110planningp317 · 2025
BarrieWastewater Mains (PVC)120planningp165 · 2025
CornwallCombined Sewer - Brick120planningp300 · 2025
BellevilleTable B 6 Sanitary Pipework - PVC (all diameters)125planningp119 · 2022
BellevilleTable B 6 Sanitary Pipework - RCP (all diameters)125planningp119 · 2022

Of 195 rows, 45 were compared with an image of their page; 150 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

2 tasks in 1 work order.

  1. 1
  2. 2
  3. 3Qtr
  4. 4
  5. 5
  6. 6Qtr
  7. 7
  8. 8
  9. 9Qtr
  10. 10
  11. 11
  12. 12Qtr

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Quarterly · 2 tasks

Source: TM 5-692-1 Maintenance of Mechanical and Electrical Equipment at Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities: Recommended Maintenance Practices, Table 18-1 Drain and vent system

TaskPage
Open manhole and inspect interiorp141
Remove debris and sediment and flush manholep141

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • Every source here is a published planning, design or accounting life. None is observed replacement data.
  • Some maintenance intervals come from TM 5-692-1, an Army manual for mission-critical (C4ISR) facilities; they may be tighter than typical commercial practice.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Sanitary manhole, v0.3.0. https://unfinished.one/c/sanitary-manhole/v/0.3.0

BibTeX

@misc{unfinished_sanitary_manhole_0_3_0,
  title = {Sanitary manhole},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.3.0},
  url = {https://unfinished.one/c/sanitary-manhole/v/0.3.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0