Uniformat D3060
Temperature sensor
A temperature sensor lasts about 12.5 years, as stated by the one published source on file.
Also listed as temp sensor, RTD, thermistor
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Work out when yours is due for replacement
One source. This value rests on a single document (CNA e-Tool Estimated Useful Life Table, p13). Treat it as that source's figure, not a settled life, until others confirm it.
Basis
- 15 years · CNA e-Tool Estimated Useful Life Table, p13 · HUD CNA 3.4.3.2.2 “Heat sensors” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing.
- 10 years · CNA e-Tool Estimated Useful Life Table, p13 · HUD CNA 3.4.3.2.3 “Outdoor temperature sensor” — U.S. Department of Housing and Urban Development (planning life)Same life for family and elderly properties. US multifamily housing.
How sources are chosen and recorded: sourcing policy.
Municipal lives for HVAC (D30)
48 municipalities in Ontario, British Columbia and Alberta state a life for HVAC as a whole, in 39 distinct tables: 10–50 years, median 20. 65 rows come from capital asset policies (accounting lives, used for amortization) and 6 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 61 stated lives
| Municipality | Covers | Years | Kind | Source |
|---|---|---|---|---|
| Trent Lakes | HVAC | 10 | accounting | p10 · 2009 |
| Fort St. James, Revelstoke, Rossland, Sicamous, Tumbler Ridge · same table | HVAC | 10–12 | accounting | p5, p9, p7, p9, p5 · 2010 |
| Okanagan-Similkameen | HVAC | 10–12 | accounting | p11 · 2023 |
| Salmo | HVAC | 10–12 | accounting | p6 · 2016 |
| Duncan, North Cowichan · same table | HVAC | 15 | accounting | p17, p9 · 2011 |
| Lantzville | HVAC | 15 | accounting | p11 · 2019 |
| Grey Highlands | Furnace, gas-fired | 15 | accounting | p11 · 2026 |
| Kapuskasing | HVAC | 15 | accounting | p14 · 2009 |
| Sarnia | HVAC | 15 | accounting | p1 |
| The Blue Mountains | Furnace, gas-fired | 15 | accounting | p11 · 2019 |
| Westlock | HVAC | 15–20 | accounting | p11 · 2021 |
| Meaford | Furnace, gas-fired | 15–25 | accounting | p17 · 2020 |
| Lloydminster | HVAC | 20 | accounting | p11 · 2023 |
| Lloydminster | HVAC | 20 | accounting | p11 · 2023 |
| Lloydminster | HVAC | 20 | accounting | p11 · 2023 |
| Lloydminster | HVAC | 20 | accounting | p11 · 2023 |
| Comox Valley | Plumbing, HVAC, Electrical | 20 | accounting | p6 · 2010 |
| Cranbrook | Plumbing, HVAC, Electrical | 20 | accounting | p9 · 2010 |
| Parksville | HVAC | 20 | accounting | p9 · 2023 |
| Telkwa | HVAC | 20 | accounting | p8 |
| Amherstburg | HVAC, Electrical | 20 | accounting | p8 · 2026 |
| Amherstburg | Ice plant compressor; Ice plant brine chiller; Arena dehumidifier | 20 | accounting | p8 · 2026 |
| Chapple | HVAC | 20 | accounting | p1 |
| Greater Napanee | Unit heater, gas-fired; Unit heater, hydronic | 20 | accounting | p16 · 2012 |
| Grey Highlands | HVAC | 20 | accounting | p11 · 2026 |
| Huron | HVAC | 20 | planning | p42 · 2025 |
| Huron | HVAC | 20 | planning | p57 · 2025 |
| Huron | HVAC | 20 | planning | p68 · 2025 |
| Huron | HVAC | 20 | planning | p77 · 2025 |
| Kenora | HVAC | 20 | accounting | p15 · 2026 |
| London | Plumbing, HVAC, Electrical | 20 | accounting | p2 · 2023 |
| Meaford | HVAC | 20 | accounting | p17 · 2020 |
| Prince Edward | HVAC | 20 | accounting | p34 · 2022 |
| Rainy River | HVAC | 20 | accounting | p11 · 2010 |
| Rainy River | HVAC | 20 | planning | p17 · 2026 |
| Severn | HVAC | 20 | accounting | p400 · 2019 |
| The Blue Mountains | HVAC | 20 | accounting | p11 · 2019 |
| Welland | HVAC, Electrical | 20 | accounting | p8 · 2021 |
| Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same table | HVAC | 20–25 | accounting | p5, p4, p6, p5 |
| Orillia | HVAC | 20–25 | accounting | p19 |
| Vulcan County | HVAC, Electrical | 20–30 | accounting | p5 · 2024 |
| Canmore | HVAC | 25 | accounting | p10 · 2025 |
| Leduc | HVAC | 25 | accounting | p13 · 2019 |
| Duncan, North Cowichan · same table | HVAC, Electrical | 25 | accounting | p17, p9 · 2011 |
| Lantzville | Plumbing, HVAC, Electrical | 25 | accounting | p11 · 2019 |
| Tofino | HVAC, Electrical | 25 | accounting | p12 · 2009 |
| Amherstburg | Evaporative condenser | 25 | accounting | p8 · 2026 |
| Greater Madawaska, Quinte West · same table | HVAC | 25 | accounting | p17, p38 · 2025 |
| Greater Napanee | HVAC, Electrical | 25 | accounting | p16 · 2012 |
| Grey Highlands | HVAC | 25 | accounting | p11 · 2026 |
| Kingston | HVAC | 25 | accounting | p15 · 2016 |
| Kirkland Lake | HVAC, Electrical | 25 | accounting | p10 · 2020 |
| Orillia | Ice plant compressor; Evaporative condenser | 25 | accounting | p19 |
| Severn | HVAC | 25 | accounting | p400 · 2019 |
| Severn | HVAC | 25 | accounting | p400 · 2019 |
| The Blue Mountains | HVAC | 25 | accounting | p11 · 2019 |
| Brantford | HVAC | 30 | planning | p10 · 2025 |
| Greater Napanee | Ice plant brine chiller | 30 | accounting | p16 · 2012 |
| Simcoe | HVAC | 30 | accounting | p19 · 2025 |
| Brockton | HVAC, Electrical | 40 | accounting | p2 · 2009 |
| Meaford | HVAC | 50 | accounting | p17 · 2020 |
Of 71 rows, 4 were compared with an image of their page; 67 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
7 tasks in 2 work orders. Intervals that fall due together are one visit: the annual visit also covers the semi-annual tasks.
- 1
- 2
- 3
- 4
- 5
- 6Semi
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Semi-annual · 1 task
Source: Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, 9.6.10 Building Controls Checklist
| Task | Page |
|---|---|
| Check all sensors (temperature, pressure, humidity, flow) read expected values | p204 |
Annual · 6 tasks
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- Only one source so far: HUD planning lives for US multifamily housing. Canadian and observed sources are needed.
- Written for GSA contracted O&M in US federal buildings; job plans are generic and defer to manufacturer instructions, and the fire extinguisher plans only point to NFPA 10.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Temperature sensor, v0.4.0. https://unfinished.one/c/sensor-temperature/v/0.4.0BibTeX
@misc{unfinished_sensor_temperature_0_4_0,
title = {Temperature sensor},
author = {{unfinished.one}},
year = {2026},
version = {0.4.0},
url = {https://unfinished.one/c/sensor-temperature/v/0.4.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.4.0, 0.3.0, 0.2.0, 0.1.0