Uniformat G3030

Concrete storm sewer

A concrete storm sewer has a useful life of about 90 years, the median of 4 published sources, which state 50–100 years.

Also listed as Storm sewer, concrete, concrete storm main, RCP storm

  • Confidence C
  • Version 0.6.0 (permanent link)
  • Reviewed 2026-10-22

Service life

90 yearsmedian of the stated lives · sources say 50–100 years
010203040506070809010011012050100

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Work out when yours is due for replacement · Compare with what municipalities assume

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for storm sewer (G3030)

49 municipalities in Ontario state a life for storm sewer as a whole, in 58 distinct tables: 20–150 years, median 50.3. 60 rows come from capital asset policies (accounting lives, used for amortization) and 201 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 50.3 yearsBrantford: Storm sewer, 20 yearsKenora: Culvert, corrugated steel, 20 yearsNorfolk County: Storm sewer, 20 yearsSault Ste. Marie: Storm sewer, 20 yearsSevern: Storm sewer, 20 yearsBarrie: Storm sewer, 25 yearsBrantford: Storm sewer, 25 yearsGreater Madawaska: Storm sewer, 25 yearsGreater Sudbury: Stormwater management pond, 25 yearsHalton: Stormwater management pond, 25 yearsKapuskasing: Culvert, corrugated steel, 25 yearsKenora: Storm sewer, 25 yearsLondon: Storm sewer, 25 yearsMeaford: Storm sewer, asphalt, 25 yearsSault Ste. Marie: Storm sewer, 25 yearsSevern: Storm sewer, 25 yearsThe Blue Mountains: Storm sewer, asphalt, 25 yearsSault Ste. Marie: Storm sewer, 29 yearsGreater Sudbury: Storm sewer, steel, 30 yearsKingston: Culvert, corrugated steel, 30 yearsLeeds and Grenville: Culvert, corrugated steel, 30 yearsLeeds and Grenville: Storm sewer, steel, 30 yearsPeterborough: Stormwater management pond, 30 yearsChapple: Storm sewer, 35 yearsYork: Culvert, corrugated steel, 35 yearsHalton: Storm sewer, 39 yearsThunder Bay: Storm sewer, 39 yearsBrockton: Storm sewer, steel, 40 yearsChapple: Storm sewer, 40 yearsChapple: Storm sewer, 40 yearsChapple: Culvert, corrugated steel, 40 yearsEssex: Storm sewer, 40 yearsKingston: Storm sewer, 40 yearsKirkland Lake: Storm sewer, 40 yearsMeaford: Stormwater management pond, 40 yearsRainy River: Storm sewer, 40 yearsRainy River: Storm sewer, 40 yearsSevern: Storm sewer, 40 yearsThe Blue Mountains: Culvert, corrugated steel, 40 yearsThe Blue Mountains: Stormwater management pond, 40 yearsThe Blue Mountains: Storm sewer, asphalt, 40 yearsTrent Lakes: Storm sewer, 40 yearsTrent Lakes: Storm sewer, 40 yearsWellington: Storm sewer, 40 yearsBrantford: Storm sewer, 44 yearsBruce: Storm sewer, 44.1 yearsCornwall: Storm sewer, 47.9 yearsHaldimand County: Stormwater management pond, 49.9 yearsAmherstburg: Catch basin, 50 yearsAmherstburg: Storm sewer, 50 yearsAmherstburg: Storm sewer, 50 yearsAmherstburg: Storm sewer, 50 yearsBarrie: Storm sewer, steel, 50 yearsBarrie: Storm sewer, 50 yearsBarrie: Storm sewer, 50 yearsBarrie: Storm sewer, 50 yearsBrantford: Storm sewer, 50 yearsBrantford: Storm sewer, steel, 50 yearsBrantford: Storm sewer, PVC, 50 yearsBrantford: Storm sewer, 50 yearsChatham-Kent: Storm sewer, 50 yearsElgin: Culvert, corrugated steel, 50 yearsGreater Madawaska and Quinte West: Storm sewer, 50 yearsGreater Napanee: Storm manhole, 50 yearsGreater Sudbury: Storm sewer, 50 yearsGrey Highlands: Catch basin, 50 yearsHaldimand County: Storm sewer, 50 yearsHalton: Storm sewer, 50 yearsHalton: Storm sewer, 50 yearsHalton: Storm sewer, 50 yearsHalton: Storm sewer, 50 yearsHalton: Storm sewer, 50 yearsKapuskasing: Storm sewer, 50 yearsKapuskasing: Storm sewer, concrete, 50 yearsKenora: Storm sewer, PVC, 50 yearsKenora: Storm sewer, PVC, 50 yearsKenora: Storm manhole, 50 yearsKenora: Catch basin, 50 yearsKingston: Storm sewer, 50 yearsKingston: Culvert, concrete, 50 yearsKirkland Lake: Storm sewer, 50 yearsKirkland Lake: Storm sewer, 50 yearsKirkland Lake: Storm sewer, 50 yearsKirkland Lake: Catch basin, 50 yearsKirkland Lake: Storm manhole, 50 yearsLambton: Culvert, corrugated steel, 50 yearsLeeds and Grenville: Culvert, concrete, 50 yearsLeeds and Grenville: Storm sewer, concrete, 50 yearsLondon: Storm sewer, 50 yearsLondon: Storm sewer, 50 yearsMeaford: Storm sewer, asphalt, 50 yearsMiddlesex: Culvert, corrugated steel, 50 yearsNorfolk County: Storm sewer, 50 yearsNorfolk County: Storm sewer, 50 yearsNorthumberland: Storm sewer, 50 yearsOrillia: Storm sewer, 50 yearsOrillia: Storm sewer, 50 yearsPeterborough: Storm sewer, 50 yearsPeterborough: Storm sewer, 50 yearsPeterborough: Storm sewer, 50 yearsPeterborough: Catch basin, 50 yearsPeterborough: Storm manhole, 50 yearsPrince Edward: Storm sewer, 50 yearsPrince Edward: Catch basin, 50 yearsPrince Edward: Storm sewer, 50 yearsRainy River: Storm sewer, 50 yearsSarnia: Catch basin, 50 yearsSault Ste. Marie: Storm sewer, 50 yearsSault Ste. Marie: Storm sewer, 50 yearsSevern: Catch basin, 50 yearsSevern: Catch basin, 50 yearsSevern: Storm sewer, 50 yearsSevern: Storm sewer, 50 yearsSevern: Storm manhole, 50 yearsSevern: Storm sewer, 50 yearsSimcoe: Storm sewer, 50 yearsSimcoe: Storm sewer, 50 yearsSimcoe: Stormwater management pond, 50 yearsSimcoe: Stormwater management pond, 50 yearsSimcoe: Storm sewer, 50 yearsSimcoe: Storm sewer, 50 yearsStormont: Storm sewer, 50 yearsThunder Bay: Storm sewer, 50 yearsThunder Bay: Storm sewer, 50 yearsYork: Storm sewer, 50 yearsOrillia: Storm sewer, 50.3 yearsOrillia: Storm sewer, 51.1 yearsGreater Sudbury: Storm sewer, asbestos cement, 55 yearsChatham-Kent: Storm sewer, 60 yearsChatham-Kent: Storm sewer, 60 yearsChatham-Kent: Storm sewer, 60 yearsEssex: Storm sewer, 60 yearsLeeds and Grenville: Storm sewer, 60 yearsLondon: Storm sewer, 60 yearsMeaford: Culvert, corrugated steel, 60 yearsNorfolk County: Storm sewer, 60 yearsQuinte West: Stormwater management pond, 60 yearsRainy River: Storm sewer, 60 yearsRainy River: Storm sewer, 60 yearsSarnia: Storm sewer, 60 yearsYork: Storm sewer, 60 yearsYork: Storm sewer, 60 yearsSault Ste. Marie: Storm sewer, 66 yearsCornwall: Storm sewer, 66.2 yearsChatham-Kent: Storm sewer, 70 yearsCornwall: Storm sewer, asbestos cement, 70 yearsGreater Sudbury: Catch basin, 70 yearsGreater Sudbury: Storm sewer, 70 yearsKapuskasing: Culvert, concrete, 70 yearsSault Ste. Marie: Storm sewer, 72 yearsOrillia: Storm sewer, 73.4 yearsAmherstburg: Storm manhole, 75 yearsAmherstburg: Storm sewer, 75 yearsBarrie: Storm sewer, 75 yearsBarrie: Culvert, concrete, 75 yearsBrantford: Storm sewer, 75 yearsBrantford: Culvert, concrete, 75 yearsBrantford: Storm sewer, 75 yearsBrockton: Storm sewer, 75 yearsBrockton: Storm sewer, concrete, 75 yearsBruce: Catch basin, 75 yearsBruce: Storm manhole, 75 yearsBruce: Storm sewer, 75 yearsCentre Hastings: Storm sewer, 75 yearsChatham-Kent: Storm sewer, 75 yearsChatham-Kent: Catch basin, 75 yearsChatham-Kent: Storm sewer, 75 yearsChatham-Kent: Storm sewer, 75 yearsCornwall: Storm sewer, steel, 75 yearsCornwall: Storm sewer, steel, 75 yearsGreater Napanee: Catch basin, 75 yearsGrey Highlands: Storm sewer, 75 yearsHalton: Storm sewer, 75 yearsHuron: Storm sewer, 75 yearsHuron: Storm sewer, 75 yearsKingston: Stormwater management pond, 75 yearsKirkland Lake: Storm sewer, 75 yearsLambton: Culvert, concrete, 75 yearsMeaford: Culvert, concrete, 75 yearsMeaford: Culvert, concrete, 75 yearsMiddlesex: Culvert, concrete, 75 yearsOrillia: Storm sewer, 75 yearsOrillia: Storm manhole, 75 yearsOrillia: Storm sewer, 75 yearsPeterborough: Storm sewer, 75 yearsPeterborough: Storm sewer, 75 yearsPeterborough: Storm sewer, 75 yearsPrescott and Russell: Storm sewer, 75 yearsSimcoe: Culvert, concrete, 75 yearsSimcoe: Culvert, corrugated steel, 75 yearsStormont: Catch basin, 75 yearsStormont: Storm manhole, 75 yearsThe Blue Mountains: Culvert, concrete, 75 yearsThe Blue Mountains: Culvert, concrete, 75 yearsWellington: Storm sewer, 75 yearsYork: Culvert, concrete, 75 yearsChatham-Kent: Storm manhole, 80 yearsChatham-Kent: Storm sewer, 80 yearsGreater Sudbury: Storm sewer, polyethylene, 80 yearsKapuskasing: Storm sewer, 80 yearsLondon: Storm sewer, 80 yearsMeaford: Storm sewer, 80 yearsSault Ste. Marie: Storm sewer, 80 yearsSault Ste. Marie: Catch basin, 80 yearsSault Ste. Marie: Storm sewer, 80 yearsSault Ste. Marie: Storm sewer, 80 yearsSault Ste. Marie: Storm sewer, 80 yearsSault Ste. Marie: Stormwater management pond, 80 yearsWelland: Storm sewer, 80 yearsGreater Napanee: Storm sewer, 90 yearsGreater Sudbury: Sanitary sewer, concrete; Storm sewer, concrete, 90 yearsOxford: Catch basin, 90 yearsOxford: Storm sewer, 90 yearsOxford: Storm sewer, 90 yearsOxford: Storm sewer, 90 yearsOrillia: Stormwater management pond, 95.9 yearsAmherstburg: Stormwater management pond, 100 yearsBarrie: Storm sewer, 100 yearsCornwall: Storm sewer, 100 yearsCornwall: Storm sewer, concrete, 100 yearsCornwall: Storm sewer, concrete, 100 yearsCornwall: Storm sewer, concrete, 100 yearsCornwall: Storm sewer, clay, 100 yearsHaldimand County: Storm sewer, 100 yearsHaldimand County: Storm sewer, 100 yearsHaldimand County: Storm sewer, 100 yearsLondon: Storm sewer, 100 yearsLondon: Storm sewer, 100 yearsLondon: Storm sewer, 100 yearsLondon: Storm sewer, 100 yearsLondon: Storm sewer, 100 yearsNorfolk County: Storm sewer, 100 yearsSault Ste. Marie: Storm sewer, 100 yearsThunder Bay: Storm sewer, 100 yearsThunder Bay: Storm sewer, 100 yearsWellington: Storm sewer, 100 yearsWellington: Storm sewer, concrete, 100 yearsCornwall: Storm sewer, 101.5 yearsCornwall: Storm sewer, polyethylene, 110 yearsCornwall: Storm sewer, PVC, 110 yearsCornwall: Storm sewer, steel, 110 yearsThunder Bay: Storm sewer, 150 yearsGrey Highlands: Storm sewer, 20–40 yearsMeaford: Culvert, corrugated steel, 25–40 yearsAmherstburg: Storm sewer, 25–80 yearsGrey Highlands: Storm sewer, 30–40 yearsYork: Storm sewer, 35–75 yearsYork: Storm sewer, 35–75 yearsYork: Storm sewer, 35–75 yearsGrey Highlands: Storm sewer, 50–60 yearsOxford: Storm sewer, 50–65 yearsKapuskasing: Storm sewer, 50–80 yearsMeaford: Storm sewer, 50–80 yearsOxford: Storm sewer, 50–90 yearsToronto: Storm sewer, 50–150 yearsNorthumberland: Storm sewer, 60–80 yearsNorthumberland: Storm sewer, 60–80 years020406080100120140160

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 257 stated lives
MunicipalityCoversYearsKindSource
BrantfordStorm sewer20planningp11 · 2025
KenoraCulvert, corrugated steel20accountingp16 · 2026
Norfolk CountyStorm sewer20planningp75 · 2025
Sault Ste. MarieStorm sewer20planningp14 · 2025
SevernStorm sewer20accountingp402 · 2019
Grey HighlandsStorm sewer20–40planningp70 · 2025
BarrieStorm sewer25planningp127 · 2025
BrantfordStorm sewer25planningp11 · 2025
Greater MadawaskaStorm sewer25planningp43 · 2025
Greater SudburyStormwater management pond25planningp30 · 2023
HaltonStormwater management pond25planningp110 · 2025
KapuskasingCulvert, corrugated steel25accountingp15 · 2009
KenoraStorm sewer25accountingp16 · 2026
LondonStorm sewer25planningp127 · 2023
MeafordStorm sewer, asphalt25accountingp20 · 2020
Sault Ste. MarieStorm sewer25planningp14 · 2025
SevernStorm sewer25accountingp402 · 2019
The Blue MountainsStorm sewer, asphalt25accountingp12 · 2019
MeafordCulvert, corrugated steel25–40accountingp19 · 2020
AmherstburgStorm sewer25–80planningp51 · 2025
Sault Ste. MarieStorm sewer29planningp14 · 2025
Greater SudburyStorm sewer, steel30planningp30 · 2023
KingstonCulvert, corrugated steel30planningp67 · 2024
Leeds and GrenvilleCulvert, corrugated steel30planningp49 · 2025
Leeds and GrenvilleStorm sewer, steel30planningp69 · 2025
PeterboroughStormwater management pond30planningp155 · 2025
Grey HighlandsStorm sewer30–40accountingp10 · 2026
ChappleStorm sewer35planningp65 · 2025
YorkCulvert, corrugated steel35planningp53 · 2024
YorkStorm sewer35–75planningp53 · 2024
YorkStorm sewer35–75planningp53 · 2024
YorkStorm sewer35–75planningp53 · 2024
HaltonStorm sewer39planningp110 · 2025
Thunder BayStorm sewer39planningp92 · 2025
BrocktonStorm sewer, steel40accountingp3 · 2009
ChappleStorm sewer40planningp97 · 2025
ChappleStorm sewer40planningp97 · 2025
ChappleCulvert, corrugated steel40accountingp1
EssexStorm sewer40planningp74 · 2025
KingstonStorm sewer40planningp67 · 2024
Kirkland LakeStorm sewer40accountingp10 · 2020
MeafordStormwater management pond40accountingp19 · 2020
Rainy RiverStorm sewer40accountingp11 · 2010
Rainy RiverStorm sewer40planningp17 · 2026
SevernStorm sewer40accountingp400 · 2019
The Blue MountainsCulvert, corrugated steel40accountingp12 · 2019
The Blue MountainsStormwater management pond40accountingp12 · 2019
The Blue MountainsStorm sewer, asphalt40accountingp12 · 2019
Trent LakesStorm sewer40accountingp10 · 2009
Trent Lakes · same tableStorm sewer40planningp67, p67, p67, p67 · 2024
WellingtonStorm sewer40planningp133 · 2025
BrantfordStorm sewer44planningp11 · 2025
BruceStorm sewer44.1planningp56 · 2025
CornwallStorm sewer47.9planningp252 · 2025
Haldimand CountyStormwater management pond49.9planningp91 · 2025
AmherstburgCatch basin50planningp62 · 2025
AmherstburgStorm sewer50planningp62 · 2025
AmherstburgStorm sewer50planningp62 · 2025
AmherstburgStorm sewer50accountingp7 · 2026
BarrieStorm sewer, steel50planningp127 · 2025
BarrieStorm sewer50planningp127 · 2025
BarrieStorm sewer50planningp127 · 2025
BarrieStorm sewer50planningp127 · 2025
BrantfordStorm sewer50planningp11 · 2025
BrantfordStorm sewer, steel50planningp12 · 2025
BrantfordStorm sewer, PVC50planningp12 · 2025
BrantfordStorm sewer50planningp12 · 2025
Chatham-KentStorm sewer50planningp11 · 2025
ElginCulvert, corrugated steel50planningp10 · 2025
Greater Madawaska, Quinte West · same tableStorm sewer50accountingp17, p37 · 2025
Greater NapaneeStorm manhole50accountingp17 · 2012
Greater SudburyStorm sewer50planningp30 · 2023
Grey HighlandsCatch basin50accountingp10 · 2026
Haldimand CountyStorm sewer50planningp84 · 2025
HaltonStorm sewer50planningp107 · 2025
HaltonStorm sewer50planningp107 · 2025
HaltonStorm sewer50planningp110 · 2025
HaltonStorm sewer50planningp110 · 2025
HaltonStorm sewer50planningp110 · 2025
KapuskasingStorm sewer50accountingp15 · 2009
KapuskasingStorm sewer, concrete50accountingp15 · 2009
KenoraStorm sewer, PVC50accountingp16 · 2026
KenoraStorm sewer, PVC50accountingp16 · 2026
KenoraStorm manhole50accountingp16 · 2026
KenoraCatch basin50accountingp16 · 2026
KingstonStorm sewer50accountingp15 · 2016
KingstonCulvert, concrete50planningp67 · 2024
Kirkland LakeStorm sewer50accountingp10 · 2020
Kirkland LakeStorm sewer50planningp49 · 2025
Kirkland LakeStorm sewer50planningp62 · 2025
Kirkland LakeCatch basin50planningp95 · 2025
Kirkland LakeStorm manhole50planningp95 · 2025
LambtonCulvert, corrugated steel50planningp89 · 2025
Leeds and GrenvilleCulvert, concrete50planningp49 · 2025
Leeds and GrenvilleStorm sewer, concrete50planningp69 · 2025
LondonStorm sewer50planningp158 · 2023
LondonStorm sewer50planningp158 · 2023
MeafordStorm sewer, asphalt50accountingp19 · 2020
MiddlesexCulvert, corrugated steel50planningp18 · 2022
Norfolk CountyStorm sewer50planningp49 · 2025
Norfolk CountyStorm sewer50planningp75 · 2025
NorthumberlandStorm sewer50planningp62 · 2022
OrilliaStorm sewer50planningp146 · 2025
OrilliaStorm sewer50planningp146 · 2025
PeterboroughStorm sewer50planningp60 · 2025
PeterboroughStorm sewer50planningp60 · 2025
PeterboroughStorm sewer50planningp60 · 2025
PeterboroughCatch basin50planningp71 · 2025
PeterboroughStorm manhole50planningp71 · 2025
Prince EdwardStorm sewer50accountingp34 · 2022
Prince EdwardCatch basin50accountingp34 · 2022
Prince EdwardStorm sewer50accountingp34 · 2022
Rainy RiverStorm sewer50planningp17 · 2026
SarniaCatch basin50accountingp2
Sault Ste. MarieStorm sewer50planningp14 · 2025
Sault Ste. MarieStorm sewer50planningp14 · 2025
SevernCatch basin50accountingp402 · 2019
SevernCatch basin50accountingp402 · 2019
SevernStorm sewer50accountingp403 · 2019
SevernStorm sewer50accountingp403 · 2019
SevernStorm manhole50accountingp403 · 2019
SevernStorm sewer50accountingp403 · 2019
SimcoeStorm sewer50planningp92 · 2025
SimcoeStorm sewer50planningp92 · 2025
SimcoeStormwater management pond50planningp92 · 2025
SimcoeStormwater management pond50accountingp21 · 2025
SimcoeStorm sewer50accountingp21 · 2025
SimcoeStorm sewer50accountingp21 · 2025
StormontStorm sewer50planningp27 · 2025
Thunder BayStorm sewer50planningp51 · 2025
Thunder BayStorm sewer50planningp92 · 2025
YorkStorm sewer50planningp53 · 2024
Grey HighlandsStorm sewer50–60planningp69 · 2025
OxfordStorm sewer50–65planningp292 · 2025
KapuskasingStorm sewer50–80planningp7 · 2022
MeafordStorm sewer50–80accountingp19 · 2020
OxfordStorm sewer50–90planningp326 · 2025
TorontoStorm sewer50–150planningp379 · 2025
OrilliaStorm sewer50.3planningp146 · 2025
OrilliaStorm sewer51.1planningp146 · 2025
Greater SudburyStorm sewer, asbestos cement55planningp30 · 2023
Chatham-KentStorm sewer60planningp9 · 2025
Chatham-KentStorm sewer60planningp9 · 2025
Chatham-KentStorm sewer60planningp11 · 2025
EssexStorm sewer60planningp60 · 2025
Leeds and GrenvilleStorm sewer60planningp69 · 2025
LondonStorm sewer60planningp127 · 2023
MeafordCulvert, corrugated steel60planningp79 · 2022
Norfolk CountyStorm sewer60planningp75 · 2025
Quinte WestStormwater management pond60accountingp38 · 2024
Rainy RiverStorm sewer60accountingp11 · 2010
Rainy RiverStorm sewer60planningp17 · 2026
SarniaStorm sewer60accountingp2
YorkStorm sewer60planningp53 · 2024
YorkStorm sewer60planningp53 · 2024
NorthumberlandStorm sewer60–80planningp62 · 2022
NorthumberlandStorm sewer60–80planningp62 · 2022
Sault Ste. MarieStorm sewer66planningp14 · 2025
CornwallStorm sewer66.2planningp252 · 2025
Chatham-KentStorm sewer70planningp9 · 2025
CornwallStorm sewer, asbestos cement70planningp336 · 2025
Greater SudburyCatch basin70planningp30 · 2023
Greater SudburyStorm sewer70planningp30 · 2023
KapuskasingCulvert, concrete70accountingp15 · 2009
Sault Ste. MarieStorm sewer72planningp14 · 2025
OrilliaStorm sewer73.4planningp146 · 2025
AmherstburgStorm manhole75planningp62 · 2025
AmherstburgStorm sewer75planningp62 · 2025
BarrieStorm sewer75planningp127 · 2025
BarrieCulvert, concrete75planningp127 · 2025
BrantfordStorm sewer75planningp11 · 2025
BrantfordCulvert, concrete75planningp12 · 2025
BrantfordStorm sewer75planningp12 · 2025
BrocktonStorm sewer75accountingp3 · 2009
BrocktonStorm sewer, concrete75accountingp3 · 2009
BruceCatch basin75planningp67 · 2025
BruceStorm manhole75planningp67 · 2025
BruceStorm sewer75planningp67 · 2025
Centre HastingsStorm sewer75planningp66 · 2025
Chatham-KentStorm sewer75planningp11 · 2025
Chatham-KentCatch basin75planningp11 · 2025
Chatham-KentStorm sewer75planningp11 · 2025
Chatham-KentStorm sewer75planningp11 · 2025
CornwallStorm sewer, steel75planningp336 · 2025
CornwallStorm sewer, steel75planningp336 · 2025
Greater NapaneeCatch basin75accountingp17 · 2012
Grey HighlandsStorm sewer75accountingp10 · 2026
HaltonStorm sewer75planningp110 · 2025
HuronStorm sewer75planningp35 · 2025
HuronStorm sewer75planningp35 · 2025
KingstonStormwater management pond75accountingp14 · 2016
Kirkland LakeStorm sewer75planningp95 · 2025
LambtonCulvert, concrete75planningp89 · 2025
MeafordCulvert, concrete75accountingp19 · 2020
MeafordCulvert, concrete75planningp79 · 2022
MiddlesexCulvert, concrete75planningp18 · 2022
OrilliaStorm sewer75planningp65 · 2025
OrilliaStorm manhole75planningp146 · 2025
OrilliaStorm sewer75planningp146 · 2025
PeterboroughStorm sewer75planningp155 · 2025
PeterboroughStorm sewer75planningp155 · 2025
PeterboroughStorm sewer75planningp71 · 2025
Prescott and RussellStorm sewer75planningp52 · 2025
SimcoeCulvert, concrete75planningp68 · 2025
SimcoeCulvert, corrugated steel75planningp68 · 2025
StormontCatch basin75planningp27 · 2025
StormontStorm manhole75planningp27 · 2025
The Blue MountainsCulvert, concrete75accountingp12 · 2019
The Blue MountainsCulvert, concrete75planningp107 · 2025
WellingtonStorm sewer75planningp133 · 2025
YorkCulvert, concrete75planningp53 · 2024
Chatham-KentStorm manhole80planningp11 · 2025
Chatham-KentStorm sewer80planningp11 · 2025
Greater SudburyStorm sewer, polyethylene80planningp30 · 2023
KapuskasingStorm sewer80planningp7 · 2022
LondonStorm sewer80planningp127 · 2023
MeafordStorm sewer80planningp111 · 2022
Sault Ste. MarieStorm sewer80planningp14 · 2025
Sault Ste. MarieCatch basin80planningp14 · 2025
Sault Ste. MarieStorm sewer80planningp14 · 2025
Sault Ste. MarieStorm sewer80planningp14 · 2025
Sault Ste. MarieStorm sewer80planningp14 · 2025
Sault Ste. MarieStormwater management pond80planningp14 · 2025
WellandStorm sewer80accountingp9 · 2021
Greater NapaneeStorm sewer90accountingp17 · 2012
Greater SudburySanitary sewer, concrete; Storm sewer, concrete90planningp30 · 2023
OxfordCatch basin90planningp326 · 2025
OxfordStorm sewer90planningp326 · 2025
OxfordStorm sewer90planningp326 · 2025
OxfordStorm sewer90planningp326 · 2025
OrilliaStormwater management pond95.9planningp146 · 2025
AmherstburgStormwater management pond100planningp62 · 2025
BarrieStorm sewer100planningp127 · 2025
CornwallStorm sewer100planningp335 · 2025
CornwallStorm sewer, concrete100planningp336 · 2025
CornwallStorm sewer, concrete100planningp336 · 2025
CornwallStorm sewer, concrete100planningp336 · 2025
CornwallStorm sewer, clay100planningp336 · 2025
Haldimand CountyStorm sewer100planningp91 · 2025
Haldimand CountyStorm sewer100planningp91 · 2025
Haldimand CountyStorm sewer100planningp91 · 2025
LondonStorm sewer100planningp127 · 2023
LondonStorm sewer100planningp127 · 2023
LondonStorm sewer100planningp127 · 2023
LondonStorm sewer100planningp127 · 2023
LondonStorm sewer100planningp127 · 2023
Norfolk CountyStorm sewer100planningp75 · 2025
Sault Ste. MarieStorm sewer100planningp14 · 2025
Thunder BayStorm sewer100planningp92 · 2025
Thunder BayStorm sewer100planningp92 · 2025
WellingtonStorm sewer100planningp133 · 2025
WellingtonStorm sewer, concrete100planningp133 · 2025
CornwallStorm sewer101.5planningp335 · 2025
CornwallStorm sewer, polyethylene110planningp336 · 2025
CornwallStorm sewer, PVC110planningp336 · 2025
CornwallStorm sewer, steel110planningp336 · 2025
Thunder BayStorm sewer150planningp92 · 2025

Of 261 rows, 31 were compared with an image of their page; 230 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

No maintenance tasks are sourced for this component yet.

Open questions

  • These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
  • No preventive maintenance tasks are sourced yet.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Storm sewer, concrete, v0.6.0. https://unfinished.one/c/storm-sewer-concrete/v/0.6.0

BibTeX

@misc{unfinished_storm_sewer_concrete_0_6_0,
  title = {Storm sewer, concrete},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.6.0},
  url = {https://unfinished.one/c/storm-sewer-concrete/v/0.6.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.6.0, 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0