Uniformat G4090
Traffic signal
A traffic signal has a useful life of about 25.1 years, the median of 25 published sources, which state 10–60 years.
Also listed as traffic light, signalized intersection, stop lights
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Work out when yours is due for replacement · Compare with what municipalities assume
Basis
- 20 years · Amherstburg: Tangible Capital Assets Policy, Appendix A: TCA Categories, Life Years, and Thresholds, p7 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 30 years · Barrie: City of Barrie Corporate Asset Management Plan: Proposed Levels of Service, p76 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 40 years · Greater Madawaska: By-Law 21-2025 Tangible Capital Asset Policy (Finance Policy 4-02), p17 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 25 years · Grey Highlands: By-law No. 2026-052, Tangible Capital Asset Policy A09-F-03, p10 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p16 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 40 years · Kingston: Tangible Capital Assets Policy, p15 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · London: 2023 Corporate Asset Management Plan, p159 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 25 years · Meaford: By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives, p20 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 30 years · Orillia: 4.1.8.1 Tangible Capital Assets Policy Manual, p22 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 40 years · Quinte West: A09-POLICY-0034 Tangible Capital Asset Policy, p37 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 25 years · The Blue Mountains: POL.COR.19.04 Tangible Capital Assets Policy, p12 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 10 years · Trent Lakes: 5.17 Capital Asset Policy, p9 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 20 years · Welland: FIN-001-0012 Tangible Capital Assets Policy, p9 (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 14.5 years · Bruce: Asset Management Plan 2025, Bruce County, p44 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 25 years · Chatham-Kent: Detailed Asset Management Plan: Roads 2025, p10 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 25.1 years · Kirkland Lake: Asset Management Plan 2025 Town of Kirkland Lake, p49 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 30 years · Lanark: Asset Management Plan 2022, p133 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 30 years · Norfolk County: 2025 Asset Management Plan, p49 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 30 years · Oxford: Oxford County Asset Management Plan 2025, p307 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 20 years · Peterborough: Asset Management Plan 2025 - Peterborough County, p44 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 60 years · Prescott and Russell: The United Counties of Prescott and Russell's 2025 Asset Management Plan, p57 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 27 years · Sault Ste. Marie: Roadway Appurtenance Asset Management Plan, City of Sault Ste. Marie, p15 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 25 years · Thunder Bay: Future-Ready Roadmap: Asset Management Plan Phase Three, p51 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 35 years · Wellington: County of Wellington 2025 Asset Management Plan, p118 (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 27.6 years · Cornwall: 2025 Asset Management Plan City of Cornwall, p252 (planning life)Asset management plan (planning life). Compared with an image of the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for traffic signals and other site electrical (G4090)
30 municipalities in Ontario state a life for traffic signals and other site electrical as a whole, in 30 distinct tables: 4–60 years, median 25. 18 rows come from capital asset policies (accounting lives, used for amortization) and 39 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 56 stated lives
| Municipality | Covers | Years | Kind | Source |
|---|---|---|---|---|
| Brantford | Traffic signals and other site electrical | 4 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 8 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 10 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 10 | planning | p13 · 2025 |
| Kingston | Traffic signals and other site electrical | 10 | planning | p44 · 2024 |
| Orillia | Traffic signals and other site electrical | 10 | accounting | p22 |
| Trent Lakes | Traffic signal | 10 | accounting | p9 · 2009 |
| Bruce | Traffic signal | 14.5 | planning | p44 · 2025 |
| Brantford | Traffic signals and other site electrical | 15 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 15 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 15 | planning | p13 · 2025 |
| Kingston | Traffic signals and other site electrical | 15 | planning | p45 · 2024 |
| Kingston | Traffic signals and other site electrical | 15 | planning | p45 · 2024 |
| Orillia | Traffic signals and other site electrical | 15 | accounting | p23 |
| Prescott and Russell | Traffic signals and other site electrical | 15 | planning | p58 · 2025 |
| Sault Ste. Marie | Traffic signals and other site electrical | 15 | planning | p15 · 2025 |
| Amherstburg | Traffic signal | 20 | accounting | p7 · 2026 |
| Kenora | Traffic signal | 20 | accounting | p16 · 2026 |
| Kingston | Traffic signals and other site electrical | 20 | planning | p45 · 2024 |
| London | Traffic signal | 20 | planning | p159 · 2023 |
| Orillia | Traffic signals and other site electrical | 20 | accounting | p23 |
| Peterborough | Traffic signal | 20 | planning | p44 · 2025 |
| Welland | Traffic signal | 20 | accounting | p9 · 2021 |
| Sault Ste. Marie | Traffic signals and other site electrical | 24 | planning | p15 · 2025 |
| Chatham-Kent | Traffic signal | 25 | planning | p10 · 2025 |
| Chatham-Kent | Traffic signals and other site electrical | 25 | planning | p10 · 2025 |
| Grey Highlands | Traffic signal | 25 | accounting | p10 · 2026 |
| Meaford | Traffic signal | 25 | accounting | p20 · 2020 |
| Orillia | Traffic signals and other site electrical | 25 | accounting | p23 |
| Sarnia | Traffic signals and other site electrical | 25 | accounting | p2 |
| Simcoe | Traffic signals and other site electrical | 25 | accounting | p21 · 2025 |
| The Blue Mountains | Traffic signal | 25 | accounting | p12 · 2019 |
| Thunder Bay | Traffic signal | 25 | planning | p51 · 2025 |
| Kirkland Lake | Traffic signal | 25.1 | planning | p49 · 2025 |
| Peterborough | Traffic signals and other site electrical | 26 | planning | p118 · 2025 |
| Sault Ste. Marie | Traffic signal | 27 | planning | p15 · 2025 |
| Cornwall | Traffic signal | 27.6 | planning | p252 · 2025 |
| Toronto | Traffic signals and other site electrical | 28 | planning | p295 · 2025 |
| Barrie | Traffic signal | 30 | planning | p76 · 2025 |
| Brantford | Traffic signals and other site electrical | 30 | planning | p13 · 2025 |
| Brantford | Traffic signals and other site electrical | 30 | planning | p13 · 2025 |
| Lanark | Traffic signal | 30 | planning | p133 · 2022 |
| Norfolk County | Traffic signal | 30 | planning | p49 · 2025 |
| Orillia | Traffic signal | 30 | accounting | p22 |
| Orillia | Traffic signals and other site electrical | 30 | accounting | p23 |
| Oxford | Traffic signal | 30 | planning | p307 · 2025 |
| Prescott and Russell | Traffic signals and other site electrical | 30 | planning | p58 · 2025 |
| Kingston | Traffic signals and other site electrical | 35 | planning | p45 · 2024 |
| Wellington | Traffic signal | 35 | planning | p118 · 2025 |
| Brantford | Traffic signals and other site electrical, steel | 40 | planning | p13 · 2025 |
| Greater Madawaska, Quinte West · same table | Traffic signal | 40 | accounting | p17, p37 · 2025 |
| Kingston | Traffic signal | 40 | accounting | p15 · 2016 |
| Brantford | Traffic signals and other site electrical | 60 | planning | p13 · 2025 |
| Prescott and Russell | Traffic signal | 60 | planning | p57 · 2025 |
| Prescott and Russell | Traffic signals and other site electrical | 60 | planning | p57 · 2025 |
| Prescott and Russell | Traffic signals and other site electrical, concrete | 60 | planning | p58 · 2025 |
Of 57 rows, 2 were compared with an image of their page; 55 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
1 tasks in 1 work order.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Annual · 1 task
Source: Guidelines for Transportation Management Systems Maintenance Concept and Plans (FHWA-OP-04-011), Appendix B, Loop Preventive Maintenance - Annually (at the cabinet level)
| Task | Page |
|---|---|
| Test inductive loop detectors at the cabinet: inductance, resistance, insulation (megger) | pundefined |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
- Written for freeway traffic management devices; the row used here is its inductive loop detector test, a part of actuated traffic signals.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Traffic signal, v0.5.0. https://unfinished.one/c/traffic-signal/v/0.5.0BibTeX
@misc{unfinished_traffic_signal_0_5_0,
title = {Traffic signal},
author = {{unfinished.one}},
year = {2026},
version = {0.5.0},
url = {https://unfinished.one/c/traffic-signal/v/0.5.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0