Uniformat D5090
Uninterruptible power supply
Also called UPS
Withdrawn. This is version 0.1.0. The entry was withdrawn in version 0.2.0 (2026-10-22): Its only sources were outside North America, which the library no longer uses. No US or Canadian source is available yet. Current status.
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 10 years · Design standards: employer's requirements – Technical Manual (ER-DFE-XX-XX-T-X-0201, revision A-C01), p275 · 5.7.4 “UPS: 10 years” — Department for Education (England) (design life)Printed page 275. Electrical infrastructure section. Section 6.2.4 (p.348) also gives 'UPS device: 10 years' and 'UPS batteries: 5 years' for network equipment. Minimum life expectancy (design requirement) for DfE-funded school buildings. Minimum design requirements placed on contractors for school buildings, not observed replacement ages. Section 5.1.4 (sanitaryware) refers to CIBSE Guide M Appendix 12.A1 'in general'.
- 6.66 years · General depreciation rates (IR265), July 2021, p47 · COMP “Power supplies (uninterruptable)” — Inland Revenue (Te Tari Taake), New Zealand (accounting life)Printed page 47. Computers category. Spelling as printed. Printed DV 30%, SL 21%. Tax depreciation lives set by the Commissioner of Inland Revenue for New Zealand income tax, not engineering or asset-management lives; they are banded and often short (e.g. reticulation piping 25 years). The July 2021 edition was the newest PDF reachable; the online Depreciation Rate Finder may hold later determinations.
How sources are chosen and recorded: sourcing policy.
Municipal lives for electrical (D50)
39 municipalities in Ontario, British Columbia and Alberta state a life for electrical as a whole, in 30 distinct tables: 10–50 years, median 20. 47 rows come from capital asset policies (accounting lives, used for amortization) and 7 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 45 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Kingston | Electrical Equipment | 10 | accounting | p15 · 2016 |
| Grey Highlands | Exterior Lighting | 15 | accounting | p11 · 2026 |
| Meaford | Electrical - Exterior Lighting | 15 | accounting | p17 · 2020 |
| The Blue Mountains | Exterior Lighting | 15 | accounting | p11 · 2019 |
| Fort St. James, Revelstoke, Rossland, Sicamous, Tumbler Ridge · same table | Electrical/Plumbing/Fire | 15–20 | accounting | p5, p9, p7, p9, p5 · 2010 |
| Okanagan-Similkameen | Electrical/Plumbing/Fire | 15–20 | accounting | p11 · 2023 |
| Salmo | Electrical/Plumbing/Fire | 15–20 | accounting | p6 · 2016 |
| Lloydminster | Permanent Structures - Electrical | 20 | accounting | p11 · 2023 |
| Lloydminster | Portable Structures - Electrical | 20 | accounting | p11 · 2023 |
| Comox Valley | HVAC systems, mechanical, plumbing, wiring, etc. | 20 | accounting | p6 · 2010 |
| Cranbrook | HVAC, plumbing, lighting, etc | 20 | accounting | p9 · 2010 |
| Parksville | Electrical Infrastructure | 20 | accounting | p9 · 2023 |
| Telkwa | Electrical/Plumbing/Fire | 20 | accounting | p8 |
| Amherstburg | Mechanical/Electrical - HVA, Lighting, Security systems, Electrical Panel | 20 | accounting | p8 · 2026 |
| Grey Highlands | Interior Lighting | 20 | accounting | p11 · 2026 |
| Grey Highlands | Ice Surface Lighting | 20 | accounting | p11 · 2026 |
| Huron | Patrol Yards - Building Electrical | 20 | planning | p42 · 2025 |
| Huron | Property Services - Building Electrical | 20 | planning | p57 · 2025 |
| Huron | Housing - Building Electrical | 20 | planning | p68 · 2025 |
| Huron | Homes for the Aged - Electrical | 20 | planning | p77 · 2025 |
| Kenora | Buildings - Electrical System | 20 | accounting | p15 · 2026 |
| London | Building Components - Services (HVAC, lighting, communication, plumbing etc.) | 20 | accounting | p2 · 2023 |
| Meaford | Electrical - Interior Lighting - Standard | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Interior Lighting - High Wattage | 20 | accounting | p17 · 2020 |
| Meaford | Electrical - Emergency Lighting | 20 | accounting | p17 · 2020 |
| The Blue Mountains | Interior Lighting | 20 | accounting | p11 · 2019 |
| The Blue Mountains | Ice Surface Lighting | 20 | accounting | p11 · 2019 |
| Welland | HVAC/Electrical/Mechanical | 20 | accounting | p8 · 2021 |
| Vulcan County | HVAC (electrical, mechanical) | 20–30 | accounting | p5 · 2024 |
| Duncan, North Cowichan · same table | Building Other (Electrical, Mechanical, etc.) | 25 | accounting | p17, p9 · 2011 |
| Lantzville | Electrical, Mechanical, Plumbing | 25 | accounting | p11 · 2019 |
| Tofino | Systems - mechanical, electrical, HVAC | 25 | accounting | p12 · 2009 |
| Brantford | Buildings - Electrical | 25 | planning | p10 · 2025 |
| Brantford | Site Works - Lighting | 25 | planning | p10 · 2025 |
| Greater Napanee | E25 Plant Mechanical & Electrical | 25 | accounting | p16 · 2012 |
| Kirkland Lake | Buildings and Improvements - Mechanical/Electrical | 25 | accounting | p10 · 2020 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | accounting | p11 · 2010 |
| Rainy River | Building Improvements - Electrical/Plumbing | 25 | planning | p17 · 2026 |
| The Blue Mountains | Electrical System | 25 | accounting | p11 · 2019 |
| Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same table | Electrical/Plumbing | 25–30 | accounting | p5, p4, p6, p5 |
| Brockton | Mechanical/Electrical (Heating/Cooling System, Refridgerating System) | 40 | accounting | p2 · 2009 |
| Greater Madawaska, Quinte West · same table | Electrical | 40 | accounting | p17, p38 · 2025 |
| Simcoe | Electrical | 40 | accounting | p19 · 2025 |
| Trent Lakes | Electrical | 40 | accounting | p10 · 2009 |
| Meaford | Electrical - System | 50 | accounting | p17 · 2020 |
Of 54 rows, 2 were compared with an image of their page; 52 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
No maintenance tasks are sourced for this component yet.
Open questions
- Every source here is a published planning, design or accounting life. None is observed replacement data.
- No preventive maintenance tasks are sourced yet.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Uninterruptible power supply, v0.1.0. https://unfinished.one/c/ups/v/0.1.0BibTeX
@misc{unfinished_ups_0_1_0,
title = {Uninterruptible power supply},
author = {{unfinished.one}},
year = {2026},
version = {0.1.0},
url = {https://unfinished.one/c/ups/v/0.1.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.2.0, 0.1.0