Service life

50 yearsmedian of the stated lives · sources say 40–75.1 years
01020304050607080904075.1

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for water supply (G3010)

34 municipalities in Ontario state a life for water supply as a whole, in 40 distinct tables: 10–160 years, median 60. 73 rows come from capital asset policies (accounting lives, used for amortization) and 231 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 60 yearsCornwall: Water Treatment - Process Instrumentation, 10 yearsBrantford: Distribution - Water Meters / Curb Stops, 15 yearsChatham-Kent: Wells, 15 yearsSarnia: Water Pumping Stations - mechanical/equipment, 15 yearsHaldimand County: Water - General Equipment, 15.2 yearsCornwall: Water Treatment - Process Mechanical, 20 yearsHaldimand County: Water Meters, 20 yearsNorfolk County: Linear - Water Meters, 20 yearsOxford: Woodstock water - Water Meter, 20 yearsPeterborough: Water Meters - Residential <50 mm, 20 yearsPeterborough: Water Meters - ICI >50 mm, 20 yearsThe Blue Mountains: Linear - Fire Hydrants, 20 yearsMeaford: Linear - Valves - Gate, 25 yearsMeaford: Linear - Valves - Air Release, 25 yearsOrillia: Roads: Hydrants, 25 yearsSarnia: Water Pumping Stations - pumps, 25 yearsThunder Bay: Water fills station, 25 yearsHaldimand County: Water Depot, 28.3 yearsBarrie: Watermain - Galvanized, 30 yearsCornwall: Water Treatment - Process Electrical, 30 yearsCornwall: Water Treatment - Process Piping, 30 yearsPeterborough: Communication Devices - Repeater, 30 yearsPeterborough: Communication Devices - Gate Keepers, 30 yearsRainy River: Water valves/services, 30 yearsRainy River: Water valves/services, 30 yearsChatham-Kent: Bulk Water Stations, 35 yearsLondon: Pump Stations (Including Rechlorination), 35 yearsBelleville: Table B 4 Water Pipework - RL (all diameters), 40 yearsChapple: Water Mains & Hydrants, 40 yearsChapple: Water Meters, 40 yearsChapple: Fire Hydrants, 40 yearsChatham-Kent: Booster Pump Stations, 40 yearsGreater Sudbury: System Valve, 40 yearsKapuskasing: Water Treatment Plant (Upgrade at 40 years), 40 yearsOxford: Woodstock water - Hydrant, 40 yearsOxford: Woodstock water - Valve, 40 yearsPrince Edward: Water - Valves (Pooled), 40 yearsSarnia: Fire Hydrants, 40 yearsHaldimand County: Water Treatment Plant, 40.5 yearsHaldimand County: Water - Booster Station, 40.8 yearsThe Blue Mountains: Polyvinyl Chloride- Grey DR26, 45 yearsTrent Lakes: CurbStop-Service, 45 yearsBrantford: Distribution - Pump Stations, 46 yearsBrantford: Distribution - Elevated Tanks, 46 yearsHaldimand County: Water - General Building, 46.6 yearsKirkland Lake: Water Valves, 48.7 yearsKirkland Lake: Water Treatment, 49.1 yearsOrillia: Booster Station, 49.4 yearsKirkland Lake: Booster Station, 49.8 yearsAmherstburg: Infrastructure - Water - Water Tower, 50 yearsBarrie: Watermain - Cross linked Polyethylene, 50 yearsBarrie: Watermain - Steel, 50 yearsBarrie: Watermain - Cured-in-Place-Pipe (Lining), 50 yearsBelleville: Table B 4 Water Pipework - CU (all diameters), 50 yearsBrantford: Distribution - Watermain / Water Services - Copper, 50 yearsBrantford: Distribution - Water Services (from property line to watermain) - Copper, 50 yearsChapple: Water Treatment Plant, 50 yearsChapple: Wells, 50 yearsChapple: Pumphouse, 50 yearsChatham-Kent: Re-chlorination Stations, 50 yearsGreater Napanee: Water & Sewer Networks: LA50 Water Services, 50 yearsGrey Highlands: Hydrants, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Water Tower, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Valve Chamber, 50 yearsGrey Highlands: Water & Wastewater Treatment Assets - Clearwell, 50 yearsHaldimand County: Water - Hydrant, 50 yearsKapuskasing: Water Distribution System (pipes, hydrants, valves etc.), 50 yearsKenora: Water Mains - Cast Iron, 50 yearsKingston: Water Utility - Water Pipes: DI, 50 yearsKingston: Water Utility - Water Pipes: Asbestos Cement, 50 yearsKingston: Water Utility - Water Other: Water valves, 50 yearsKirkland Lake: Water Distribution System (pipes, hydrants, valves etc.), 50 yearsKirkland Lake: Hydrants, 50 yearsLondon: Valves, 50 yearsLondon: Hydrants, 50 yearsMeaford: Valve Chamber, 50 yearsMeaford: Linear - Valves - Pressure Release, 50 yearsMeaford: Linear - Valves - Globe, 50 yearsNorfolk County: Vertical - Booster Stations and Reservoirs, 50 yearsNorfolk County: Vertical - Other Water Facilities, 50 yearsNorfolk County: Vertical - Water Towers and Standpipes, 50 yearsNorfolk County: Vertical - Water Treatment Plants, 50 yearsNorfolk County: Vertical - Wells, 50 yearsOrillia: Fire Hydrants, 50 yearsQuinte West: Water Mains - Cast Iron, 50 yearsQuinte West: Pipe Relining, 50 yearsThe Blue Mountains: Valve Chamber, 50 yearsTrent Lakes: Water - Valves, 50 yearsWelland: Water Systems (by component) - Water Services (includes fittings), 50 yearsOrillia: Water Filtration Plant, 52.3 yearsHalton: Booster Stations, Reservoirs, and Storage Facilities, 54 yearsCornwall: Watermain - Steel, 55 yearsBarrie: Watermain - Ductile Iron, 60 yearsBarrie: Watermain - Plastic, 60 yearsBarrie: Watermain - Stainless Steel, 60 yearsBelleville: Table B 4 Water Pipework - CI <= 250mm, 60 yearsBelleville: Table B 4 Water Pipework - C <= 250mm, 60 yearsBrantford: Treatment - Water Treatment Plant, 60 yearsChatham-Kent: Water Treatment Plant, 60 yearsChatham-Kent: Water Towers, Standpipes, & Surge Towers, 60 yearsChatham-Kent: Reservoirs, 60 yearsGreater Sudbury: Cast Iron Watermain, 60 yearsGreater Sudbury: Hydrants, 60 yearsGreater Sudbury: Service Connection, 60 yearsKenora: Water Mains - Ductile Iron, 60 yearsKingston: Water Utility - Water Pipes: Concrete, 60 yearsKingston: Water Utility - Water Other: Water hydrants, 60 yearsLondon: Service Connections, 60 yearsLondon: Chambers (main diameter <= 450mm ), 60 yearsLondon: Chambers (main diameter > 450mm), 60 yearsLondon: Pressure Release Valve, 60 yearsPeterborough: Ancillaries - Valves <300 mm, 60 yearsPeterborough: Ancillaries - Valves Including Chambers >300 mm, 60 yearsPeterborough: Ancillaries - Hydrants, 60 yearsPeterborough: Water Treatment Plant - Waste Process Building, 60 yearsPeterborough: Water Treatment Plant - Generator Building, 60 yearsPeterborough: Pumping Stations - Water Street Pumphouse, 60 yearsPeterborough: Pumping Stations - Clonsilla Reservoir, 60 yearsPeterborough: Pumping Stations - Clonsilla (Zone 2), 60 yearsPeterborough: Pumping Stations - Cumberland, 60 yearsPeterborough: Pumping Stations - Greencrest, 60 yearsPeterborough: Pumping Stations - Lansdowne, 60 yearsPeterborough: Pumping Stations - Chemong, 60 yearsPeterborough: Pumping Stations - Fairmount, 60 yearsPeterborough: Pumping Stations - Scollard, 60 yearsPeterborough: Elevated Storage Tanks - Milroy, 60 yearsPeterborough: Underground Reservoirs - Clonsilla, 60 yearsPeterborough: Underground Reservoirs - Towerhill, 60 yearsPeterborough: Bulk Fill Station - Milroy, 60 yearsPrince Edward: Water - Laterals/Connections (Pooled), 60 yearsQuinte West: Hydrants, 60 yearsRainy River: Water lines/Hydrants, 60 yearsRainy River: Water lines/Hydrants, 60 yearsSarnia: Water Distribution, 60 yearsSevern: Infrastructure - Water & Sewer - Hydrants, 60 yearsThe Blue Mountains: Asbestos Cement, 60 yearsThunder Bay: Pumping Stations, 60 yearsThunder Bay: Reservoirs, 60 yearsThunder Bay: Water Treatment Plant, 60 yearsThunder Bay: Standpipe, 60 yearsTrent Lakes: Water - Mains, 60 yearsTrent Lakes: Water Facilities, 60 yearsWelland: Water Systems (by component) - Hydrant Assemblies, 60 yearsOrillia: Reservoirs and Wells, 61.1 yearsCornwall: Water Purification Plant, 62.6 yearsKingston: Water Utility - Water Pipes: Average, 64 yearsBrantford: Distribution - Watermain / Water Services - Cast Iron, 65 yearsBrantford: Distribution - Watermain / Water Services - Ductile Iron, 65 yearsCornwall: Reservoirs and Storage Tanks, 67 yearsHaldimand County: Water - Storage, 69.3 yearsBrantford: Distribution - Valves, 70 yearsGreater Sudbury: Maint. Hole & Chamber, 70 yearsKingston: Water Utility - Water Pipes: HDPE, 70 yearsNorfolk County: Linear - Local Mains, 70 yearsPrince Edward: Water - Hydrants (Pooled), 70 yearsPrince Edward: Water - Hydrants - Leads (Pooled), 70 yearsThe Blue Mountains: Cast Iron, 70 yearsKirkland Lake: Waterlines, 74.8 yearsAmherstburg: Other - Pooled Assets - Fire Hydrants, 75 yearsBarrie: Watermain - Ductile Iron with Cathodic Protection, 75 yearsBarrie: Watermain - Asbestos Cement, 75 yearsBelleville: Table B 4 Water Pipework - HYPOTEC > 400mm, 75 yearsBelleville: Table B 4 Water Pipework - CC > 400mm, 75 yearsBelleville: Table B 4 Water Pipework - Concrete > 400mm, 75 yearsBelleville: Table B 4 Water Pipework - CPP > 400mm, 75 yearsBelleville: Table B 4 Water Pipework - CPP AWWA C301 > 400mm, 75 yearsBelleville: Table B 4 Water Pipework - UNKNOWN > 400mm, 75 yearsBrantford: Distribution - Hydrants, 75 yearsBrantford: Distribution - Watermain / Water Services - Asbestos Cement, 75 yearsBrantford: Distribution - Watermain / Water Services - Unknown, 75 yearsBrantford: Distribution - Water Services (from property line to watermain) - Unknown, 75 yearsChatham-Kent: Hydrants, 75 yearsGrey Highlands: Watermain Pipe, 75 yearsHaldimand County: Water Pipe, 75 yearsKenora: Water Mains - PVC, 75 yearsKenora: Water Mains - PE, 75 yearsKenora: Water Mains - Valves, 75 yearsKenora: Water Mains - Hydrants, 75 yearsKenora: Booster Stations, 75 yearsKingston: Water Utility - Water Facilities: Tankage, 75 yearsKingston: Water Utility - Water Pipes: CI, 75 yearsKirkland Lake: Hydrant Leads, 75 yearsMeaford: Storage (Water Tower), 75 yearsOrillia: Watermains (<200mm), 75 yearsOrillia: Watermains (200-300mm), 75 yearsOrillia: Watermains (>300-450mm), 75 yearsOrillia: Watermains (>450mm), 75 yearsPeterborough: Services - Residential <50 mm, 75 yearsPeterborough: Services - ICI >50 mm, 75 yearsThe Blue Mountains: High Density Polethylene, 75 yearsThunder Bay: Watermains, 75 yearsHaldimand County: Water - Valve, 75.1 yearsCornwall: Raw Water Intake Facilities, 78 yearsBarrie: Watermain - Cast Iron, 80 yearsBarrie: Watermain - Copper, 80 yearsBelleville: Table B 4 Water Pipework - CI 251- 400mm, 80 yearsBelleville: Table B 4 Water Pipework - DI <= 250mm, 80 yearsBelleville: Table B 4 Water Pipework - GI (all diameters), 80 yearsBelleville: Table B 4 Water Pipework - C 251- 400mm, 80 yearsBrockton: Waterworks - Watermains, 80 yearsChatham-Kent: Watermains (below 200 mm), 80 yearsChatham-Kent: Watermains (200 - 550mm), 80 yearsChatham-Kent: Watermains (550-750 mm), 80 yearsChatham-Kent: Watermains (Above 750 mm), 80 yearsGreater Napanee: Water & Sewer Networks: LA80 Cast Iron Pipe, Concrete, Asbestos Cement Pipe, Fire Hydrants, Valves, 80 yearsGreater Sudbury: HDPE Watermain, 80 yearsKapuskasing: Water Tower, 80 yearsKapuskasing: Water Piping, 80 yearsKingston: Water Utility - Water Pipes: PVC, 80 yearsLondon: Distribution Mains, 80 yearsMeaford: Local Main, 80 yearsQuinte West: Water Mains - Polyethylene, 80 yearsSevern: Infrastructure - Water & Sewer - Valves, 80 yearsSevern: Infrastructure - Water & Sewer - Watermains, 80 yearsThe Blue Mountains: Polyvinyl Chloride- White DR26, 80 yearsWelland: Water Systems (by component) - Water Mains (includes valves & fittings), 80 yearsWelland: Water Systems (by component) - Chambers & Vaults (for valves & meters), 80 yearsCornwall: Watermain - Cast Iron, 81.5 yearsHalton: Distribution Mains (< 400mm), 83 yearsHalton: Trunk Mains (>400mm), 84 yearsPeterborough: Elevated Storage Tanks - Sherbrooke, 85 yearsBarrie: Watermain - High Density Polyethylene, 90 yearsBarrie: Watermain - PVC, 90 yearsBarrie: Watermain - Concrete, 90 yearsBrantford: Distribution - Watermain / Water Services - Polypropylene, 90 yearsBrantford: Distribution - Watermain / Water Services - Pre-Stressed Concrete Cylinder, 90 yearsBrantford: Distribution - Watermain / Water Services - PVC, 90 yearsBrantford: Distribution - Watermain / Water Services - PVC Bionax, 90 yearsBrantford: Distribution - Water Services (from property line to watermain) - PEX (cross-linked polyethylene), 90 yearsCornwall: Watermain - Ductile Iron, 90 yearsLondon: Transmission Mains, 90 yearsOxford: Woodstock water - Watermain (<416mm), 90 yearsOxford: Woodstock water - Watermain (>=416mm), 90 yearsOxford: Woodstock water - Water Service Connection, 90 yearsThe Blue Mountains: Ductile Iron, 90 yearsGreater Sudbury: Concrete Watermain, 95 yearsCornwall: Watermains, 95.6 yearsLondon: Storage Reservoirs, 96 yearsAmherstburg: Infrastructure - Water - Watermains, 100 yearsBelleville: Table B 4 Water Pipework - DI 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - HYPOTEC <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - HYPOTEC 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - CC <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - CC 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - Concrete <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - Concrete 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - Stainless-steel (all diameters), 100 yearsBelleville: Table B 4 Water Pipework - CPP <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - CPP 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - CPP AWWA C301 <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - CPP AWWA C301 251- 400mm, 100 yearsBelleville: Table B 4 Water Pipework - UNKNOWN <= 250mm, 100 yearsBelleville: Table B 4 Water Pipework - UNKNOWN 251- 400mm, 100 yearsCornwall: Watermain - Concrete Pressure Pipe, 100 yearsCornwall: Watermain - Copper, 100 yearsPeterborough: Watermains - Distribution 300/250 mm, 100 yearsPeterborough: Watermains - Distribution 200/150 mm, 100 yearsPeterborough: Watermains - Distribution <150 mm, 100 yearsPeterborough: Watermains - Trunk >300 mm, 100 yearsPeterborough: Dam - Water Street, 100 yearsPeterborough: Elevated Storage Tanks - High, 100 yearsQuinte West: Pipe Replacement, 100 yearsThe Blue Mountains: Polyvinyl Chloride- Blue DR18, 100 yearsGreater Sudbury: PVC Watermain, 105 yearsCornwall: Watermain - Polyvinyl Chloride, 110 yearsPeterborough: Water Treatment Plant - Filtration/Treatment Building, 130 yearsBelleville: Table B 4 Water Pipework - CI > 400mm, 140 yearsBelleville: Table B 4 Water Pipework - C > 400mm, 140 yearsBelleville: Table B 4 Water Pipework - PVC (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - AC (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - PVC CLASS 150 (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - PE (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - PVC DR-18 (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - PVC DR18 (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - PE SDR 11 (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - HDPE SDR-11 (all diameters), 150 yearsBelleville: Table B 4 Water Pipework - DI > 400mm, 160 yearsMeaford: Linear - Valves - Power Actuated, 20–30 yearsCentre Hastings: Water, 40–60 yearsCentre Hastings: Water infrastructure, 40–60 yearsMeaford: Linear - Fire Hydrant, 50–60 yearsOrillia: Land Improvement (Infrastructure) - Reservoirs, 50–60 yearsMeaford: Linear - Valves - Valve Chamber, 50–80 yearsMeaford: Linear - Valves - Maintenance Hatch, 50–80 yearsToronto: Conveyance - Linear Infrastructure (Transmission & Distribution), 50–100 yearsKapuskasing: Water Wells, 60–80 yearsPrince Edward: Water - Water Mains, 60–80 years020406080100120140160180

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 287 stated lives
MunicipalityAs writtenYearsKindSource
CornwallWater Treatment - Process Instrumentation10planningp386 · 2025
BrantfordDistribution - Water Meters / Curb Stops15planningp10 · 2025
Chatham-KentWells15planningp13 · 2025
SarniaWater Pumping Stations - mechanical/equipment15accountingp1
Haldimand CountyWater - General Equipment15.2planningp99 · 2025
CornwallWater Treatment - Process Mechanical20planningp386 · 2025
Haldimand CountyWater Meters20planningp99 · 2025
Norfolk CountyLinear - Water Meters20planningp59 · 2025
OxfordWoodstock water - Water Meter20planningp221 · 2025
PeterboroughWater Meters - Residential <50 mm20planningp19 · 2025
PeterboroughWater Meters - ICI >50 mm20planningp19 · 2025
The Blue MountainsLinear - Fire Hydrants20accountingp12 · 2019
MeafordLinear - Valves - Power Actuated20–30accountingp19 · 2020
MeafordLinear - Valves - Gate25accountingp19 · 2020
MeafordLinear - Valves - Air Release25accountingp19 · 2020
OrilliaRoads: Hydrants25accountingp22
SarniaWater Pumping Stations - pumps25accountingp1
Thunder BayWater fills station25planningp77 · 2025
Haldimand CountyWater Depot28.3planningp99 · 2025
BarrieWatermain - Galvanized30planningp148 · 2025
CornwallWater Treatment - Process Electrical30planningp386 · 2025
CornwallWater Treatment - Process Piping30planningp386 · 2025
PeterboroughCommunication Devices - Repeater30planningp19 · 2025
PeterboroughCommunication Devices - Gate Keepers30planningp19 · 2025
Rainy RiverWater valves/services30accountingp11 · 2010
Rainy RiverWater valves/services30planningp17 · 2026
Chatham-KentBulk Water Stations35planningp13 · 2025
LondonPump Stations (Including Rechlorination)35planningp70 · 2023
BellevilleTable B 4 Water Pipework - RL (all diameters)40planningp118 · 2022
ChappleWater Mains & Hydrants40planningp75 · 2025
ChappleWater Meters40planningp75 · 2025
ChappleFire Hydrants40accountingp1
Chatham-KentBooster Pump Stations40planningp13 · 2025
Greater SudburySystem Valve40planningp26 · 2023
KapuskasingWater Treatment Plant (Upgrade at 40 years)40planningp7 · 2022
OxfordWoodstock water - Hydrant40planningp221 · 2025
OxfordWoodstock water - Valve40planningp221 · 2025
Prince EdwardWater - Valves (Pooled)40accountingp34 · 2022
SarniaFire Hydrants40accountingp2
Centre HastingsWater40–60planningp61 · 2025
Centre HastingsWater infrastructure40–60accountingp5
Haldimand CountyWater Treatment Plant40.5planningp99 · 2025
Haldimand CountyWater - Booster Station40.8planningp99 · 2025
The Blue MountainsPolyvinyl Chloride- Grey DR2645planningp26 · 2025
Trent Lakes · same tableCurbStop-Service45planningp69, p69, p69, p69, p69, p69 · 2024
BrantfordDistribution - Pump Stations46planningp11 · 2025
BrantfordDistribution - Elevated Tanks46planningp11 · 2025
Haldimand CountyWater - General Building46.6planningp99 · 2025
Kirkland LakeWater Valves48.7planningp73 · 2025
Kirkland LakeWater Treatment49.1planningp73 · 2025
OrilliaBooster Station49.4planningp95 · 2025
Kirkland LakeBooster Station49.8planningp73 · 2025
AmherstburgInfrastructure - Water - Water Tower50accountingp7 · 2026
BarrieWatermain - Cross linked Polyethylene50planningp148 · 2025
BarrieWatermain - Steel50planningp148 · 2025
BarrieWatermain - Cured-in-Place-Pipe (Lining)50planningp148 · 2025
BellevilleTable B 4 Water Pipework - CU (all diameters)50planningp118 · 2022
BrantfordDistribution - Watermain / Water Services - Copper50planningp10 · 2025
BrantfordDistribution - Water Services (from property line to watermain) - Copper50planningp10 · 2025
ChappleWater Treatment Plant50planningp75 · 2025
ChappleWells50planningp75 · 2025
ChapplePumphouse50planningp75 · 2025
Chatham-KentRe-chlorination Stations50planningp13 · 2025
Greater NapaneeWater & Sewer Networks: LA50 Water Services50accountingp17 · 2012
Grey HighlandsHydrants50accountingp10 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Water Tower50accountingp11 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Valve Chamber50accountingp11 · 2026
Grey HighlandsWater & Wastewater Treatment Assets - Clearwell50accountingp11 · 2026
Haldimand CountyWater - Hydrant50planningp99 · 2025
KapuskasingWater Distribution System (pipes, hydrants, valves etc.)50accountingp15 · 2009
KenoraWater Mains - Cast Iron50accountingp17 · 2026
KingstonWater Utility - Water Pipes: DI50accountingp15 · 2016
KingstonWater Utility - Water Pipes: Asbestos Cement50accountingp15 · 2016
KingstonWater Utility - Water Other: Water valves50accountingp15 · 2016
Kirkland LakeWater Distribution System (pipes, hydrants, valves etc.)50accountingp10 · 2020
Kirkland LakeHydrants50planningp73 · 2025
LondonValves50planningp70 · 2023
LondonHydrants50planningp70 · 2023
MeafordValve Chamber50accountingp18 · 2020
MeafordLinear - Valves - Pressure Release50accountingp19 · 2020
MeafordLinear - Valves - Globe50accountingp19 · 2020
Norfolk CountyVertical - Booster Stations and Reservoirs50planningp59 · 2025
Norfolk CountyVertical - Other Water Facilities50planningp59 · 2025
Norfolk CountyVertical - Water Towers and Standpipes50planningp59 · 2025
Norfolk CountyVertical - Water Treatment Plants50planningp59 · 2025
Norfolk CountyVertical - Wells50planningp59 · 2025
OrilliaFire Hydrants50planningp95 · 2025
Quinte West · same tableWater Mains - Cast Iron50accountingp37, p37 · 2024
Quinte WestPipe Relining50planningp22 · 2025
The Blue MountainsValve Chamber50accountingp11 · 2019
Trent LakesWater - Valves50accountingp10 · 2009
WellandWater Systems (by component) - Water Services (includes fittings)50accountingp9 · 2021
MeafordLinear - Fire Hydrant50–60accountingp19 · 2020
OrilliaLand Improvement (Infrastructure) - Reservoirs50–60accountingp22
MeafordLinear - Valves - Valve Chamber50–80accountingp19 · 2020
MeafordLinear - Valves - Maintenance Hatch50–80accountingp19 · 2020
TorontoConveyance - Linear Infrastructure (Transmission & Distribution)50–100planningp355 · 2025
OrilliaWater Filtration Plant52.3planningp95 · 2025
HaltonBooster Stations, Reservoirs, and Storage Facilities54planningp67 · 2025
CornwallWatermain - Steel55planningp354 · 2025
BarrieWatermain - Ductile Iron60planningp148 · 2025
BarrieWatermain - Plastic60planningp148 · 2025
BarrieWatermain - Stainless Steel60planningp148 · 2025
BellevilleTable B 4 Water Pipework - CI <= 250mm60planningp118 · 2022
BellevilleTable B 4 Water Pipework - C <= 250mm60planningp118 · 2022
BrantfordTreatment - Water Treatment Plant60planningp11 · 2025
Chatham-KentWater Treatment Plant60planningp13 · 2025
Chatham-KentWater Towers, Standpipes, & Surge Towers60planningp13 · 2025
Chatham-KentReservoirs60planningp13 · 2025
Greater SudburyCast Iron Watermain60planningp26 · 2023
Greater SudburyHydrants60planningp26 · 2023
Greater SudburyService Connection60planningp26 · 2023
KenoraWater Mains - Ductile Iron60accountingp17 · 2026
KingstonWater Utility - Water Pipes: Concrete60accountingp15 · 2016
KingstonWater Utility - Water Other: Water hydrants60accountingp15 · 2016
LondonService Connections60planningp70 · 2023
LondonChambers (main diameter <= 450mm )60planningp70 · 2023
LondonChambers (main diameter > 450mm)60planningp70 · 2023
LondonPressure Release Valve60planningp70 · 2023
PeterboroughAncillaries - Valves <300 mm60planningp19 · 2025
PeterboroughAncillaries - Valves Including Chambers >300 mm60planningp19 · 2025
PeterboroughAncillaries - Hydrants60planningp19 · 2025
PeterboroughWater Treatment Plant - Waste Process Building60planningp15 · 2025
PeterboroughWater Treatment Plant - Generator Building60planningp15 · 2025
PeterboroughPumping Stations - Water Street Pumphouse60planningp15 · 2025
PeterboroughPumping Stations - Clonsilla Reservoir60planningp15 · 2025
PeterboroughPumping Stations - Clonsilla (Zone 2)60planningp15 · 2025
PeterboroughPumping Stations - Cumberland60planningp15 · 2025
PeterboroughPumping Stations - Greencrest60planningp15 · 2025
PeterboroughPumping Stations - Lansdowne60planningp15 · 2025
PeterboroughPumping Stations - Chemong60planningp15 · 2025
PeterboroughPumping Stations - Fairmount60planningp15 · 2025
PeterboroughPumping Stations - Scollard60planningp15 · 2025
PeterboroughElevated Storage Tanks - Milroy60planningp15 · 2025
PeterboroughUnderground Reservoirs - Clonsilla60planningp15 · 2025
PeterboroughUnderground Reservoirs - Towerhill60planningp15 · 2025
PeterboroughBulk Fill Station - Milroy60planningp15 · 2025
Prince EdwardWater - Laterals/Connections (Pooled)60accountingp34 · 2022
Quinte WestHydrants60accountingp37 · 2024
Rainy RiverWater lines/Hydrants60accountingp11 · 2010
Rainy RiverWater lines/Hydrants60planningp17 · 2026
SarniaWater Distribution60accountingp2
SevernInfrastructure - Water & Sewer - Hydrants60accountingp402 · 2019
The Blue MountainsAsbestos Cement60planningp26 · 2025
Thunder BayPumping Stations60planningp77 · 2025
Thunder BayReservoirs60planningp77 · 2025
Thunder BayWater Treatment Plant60planningp77 · 2025
Thunder BayStandpipe60planningp77 · 2025
Trent LakesWater - Mains60accountingp10 · 2009
Trent Lakes · same tableWater Facilities60planningp69, p69, p69, p69 · 2024
WellandWater Systems (by component) - Hydrant Assemblies60accountingp9 · 2021
KapuskasingWater Wells60–80planningp7 · 2022
Prince EdwardWater - Water Mains60–80accountingp34 · 2022
OrilliaReservoirs and Wells61.1planningp95 · 2025
CornwallWater Purification Plant62.6planningp386 · 2025
KingstonWater Utility - Water Pipes: Average64accountingp15 · 2016
BrantfordDistribution - Watermain / Water Services - Cast Iron65planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - Ductile Iron65planningp10 · 2025
CornwallReservoirs and Storage Tanks67planningp354 · 2025
Haldimand CountyWater - Storage69.3planningp99 · 2025
BrantfordDistribution - Valves70planningp10 · 2025
Greater SudburyMaint. Hole & Chamber70planningp26 · 2023
KingstonWater Utility - Water Pipes: HDPE70accountingp15 · 2016
Norfolk CountyLinear - Local Mains70planningp59 · 2025
Prince EdwardWater - Hydrants (Pooled)70accountingp34 · 2022
Prince EdwardWater - Hydrants - Leads (Pooled)70accountingp34 · 2022
The Blue MountainsCast Iron70planningp26 · 2025
Kirkland LakeWaterlines74.8planningp73 · 2025
AmherstburgOther - Pooled Assets - Fire Hydrants75accountingp8 · 2026
BarrieWatermain - Ductile Iron with Cathodic Protection75planningp148 · 2025
BarrieWatermain - Asbestos Cement75planningp148 · 2025
BellevilleTable B 4 Water Pipework - HYPOTEC > 400mm75planningp118 · 2022
BellevilleTable B 4 Water Pipework - CC > 400mm75planningp118 · 2022
BellevilleTable B 4 Water Pipework - Concrete > 400mm75planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP > 400mm75planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP AWWA C301 > 400mm75planningp118 · 2022
BellevilleTable B 4 Water Pipework - UNKNOWN > 400mm75planningp118 · 2022
BrantfordDistribution - Hydrants75planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - Asbestos Cement75planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - Unknown75planningp10 · 2025
BrantfordDistribution - Water Services (from property line to watermain) - Unknown75planningp10 · 2025
Chatham-KentHydrants75planningp13 · 2025
Grey HighlandsWatermain Pipe75accountingp10 · 2026
Haldimand CountyWater Pipe75planningp99 · 2025
KenoraWater Mains - PVC75accountingp17 · 2026
KenoraWater Mains - PE75accountingp17 · 2026
KenoraWater Mains - Valves75accountingp17 · 2026
KenoraWater Mains - Hydrants75accountingp17 · 2026
KenoraBooster Stations75accountingp17 · 2026
KingstonWater Utility - Water Facilities: Tankage75accountingp15 · 2016
KingstonWater Utility - Water Pipes: CI75accountingp15 · 2016
Kirkland LakeHydrant Leads75planningp73 · 2025
Meaford · same tableStorage (Water Tower)75planningp135, p135, p135 · 2022
OrilliaWatermains (<200mm)75planningp95 · 2025
OrilliaWatermains (200-300mm)75planningp95 · 2025
OrilliaWatermains (>300-450mm)75planningp95 · 2025
OrilliaWatermains (>450mm)75planningp95 · 2025
PeterboroughServices - Residential <50 mm75planningp19 · 2025
PeterboroughServices - ICI >50 mm75planningp19 · 2025
The Blue MountainsHigh Density Polethylene75planningp26 · 2025
Thunder BayWatermains75planningp77 · 2025
Haldimand CountyWater - Valve75.1planningp99 · 2025
CornwallRaw Water Intake Facilities78planningp386 · 2025
BarrieWatermain - Cast Iron80planningp148 · 2025
BarrieWatermain - Copper80planningp148 · 2025
BellevilleTable B 4 Water Pipework - CI 251- 400mm80planningp118 · 2022
BellevilleTable B 4 Water Pipework - DI <= 250mm80planningp118 · 2022
BellevilleTable B 4 Water Pipework - GI (all diameters)80planningp118 · 2022
BellevilleTable B 4 Water Pipework - C 251- 400mm80planningp118 · 2022
BrocktonWaterworks - Watermains80accountingp2 · 2009
Chatham-KentWatermains (below 200 mm)80planningp13 · 2025
Chatham-KentWatermains (200 - 550mm)80planningp13 · 2025
Chatham-KentWatermains (550-750 mm)80planningp13 · 2025
Chatham-KentWatermains (Above 750 mm)80planningp13 · 2025
Greater NapaneeWater & Sewer Networks: LA80 Cast Iron Pipe, Concrete, Asbestos Cement Pipe, Fire Hydrants, Valves80accountingp17 · 2012
Greater SudburyHDPE Watermain80planningp26 · 2023
KapuskasingWater Tower80planningp7 · 2022
KapuskasingWater Piping80planningp7 · 2022
KingstonWater Utility - Water Pipes: PVC80accountingp15 · 2016
LondonDistribution Mains80planningp70 · 2023
Meaford · same tableLocal Main80planningp135, p135 · 2022
Quinte West · same tableWater Mains - Polyethylene80accountingp37, p37, p37, p37, p37 · 2024
SevernInfrastructure - Water & Sewer - Valves80accountingp402 · 2019
SevernInfrastructure - Water & Sewer - Watermains80accountingp403 · 2019
The Blue MountainsPolyvinyl Chloride- White DR2680planningp26 · 2025
WellandWater Systems (by component) - Water Mains (includes valves & fittings)80accountingp9 · 2021
WellandWater Systems (by component) - Chambers & Vaults (for valves & meters)80accountingp9 · 2021
CornwallWatermain - Cast Iron81.5planningp354 · 2025
HaltonDistribution Mains (< 400mm)83planningp67 · 2025
HaltonTrunk Mains (>400mm)84planningp67 · 2025
PeterboroughElevated Storage Tanks - Sherbrooke85planningp15 · 2025
BarrieWatermain - High Density Polyethylene90planningp148 · 2025
BarrieWatermain - PVC90planningp148 · 2025
BarrieWatermain - Concrete90planningp148 · 2025
BrantfordDistribution - Watermain / Water Services - Polypropylene90planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - Pre-Stressed Concrete Cylinder90planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - PVC90planningp10 · 2025
BrantfordDistribution - Watermain / Water Services - PVC Bionax90planningp10 · 2025
BrantfordDistribution - Water Services (from property line to watermain) - PEX (cross-linked polyethylene)90planningp10 · 2025
CornwallWatermain - Ductile Iron90planningp354 · 2025
LondonTransmission Mains90planningp70 · 2023
OxfordWoodstock water - Watermain (<416mm)90planningp221 · 2025
OxfordWoodstock water - Watermain (>=416mm)90planningp221 · 2025
OxfordWoodstock water - Water Service Connection90planningp221 · 2025
The Blue Mountains · same tableDuctile Iron90planningp26, p26 · 2025
Greater SudburyConcrete Watermain95planningp26 · 2023
CornwallWatermains95.6planningp354 · 2025
LondonStorage Reservoirs96planningp70 · 2023
AmherstburgInfrastructure - Water - Watermains100accountingp7 · 2026
BellevilleTable B 4 Water Pipework - DI 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - HYPOTEC <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - HYPOTEC 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CC <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CC 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - Concrete <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - Concrete 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - Stainless-steel (all diameters)100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP AWWA C301 <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - CPP AWWA C301 251- 400mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - UNKNOWN <= 250mm100planningp118 · 2022
BellevilleTable B 4 Water Pipework - UNKNOWN 251- 400mm100planningp118 · 2022
CornwallWatermain - Concrete Pressure Pipe100planningp354 · 2025
CornwallWatermain - Copper100planningp354 · 2025
PeterboroughWatermains - Distribution 300/250 mm100planningp19 · 2025
PeterboroughWatermains - Distribution 200/150 mm100planningp19 · 2025
PeterboroughWatermains - Distribution <150 mm100planningp19 · 2025
PeterboroughWatermains - Trunk >300 mm100planningp19 · 2025
PeterboroughDam - Water Street100planningp15 · 2025
PeterboroughElevated Storage Tanks - High100planningp15 · 2025
Quinte WestPipe Replacement100planningp22 · 2025
The Blue MountainsPolyvinyl Chloride- Blue DR18100planningp26 · 2025
Greater SudburyPVC Watermain105planningp26 · 2023
CornwallWatermain - Polyvinyl Chloride110planningp354 · 2025
PeterboroughWater Treatment Plant - Filtration/Treatment Building130planningp15 · 2025
BellevilleTable B 4 Water Pipework - CI > 400mm140planningp118 · 2022
BellevilleTable B 4 Water Pipework - C > 400mm140planningp118 · 2022
BellevilleTable B 4 Water Pipework - PVC (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - AC (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - PVC CLASS 150 (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - PE (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - PVC DR-18 (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - PVC DR18 (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - PE SDR 11 (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - HDPE SDR-11 (all diameters)150planningp118 · 2022
BellevilleTable B 4 Water Pipework - DI > 400mm160planningp118 · 2022

Of 304 rows, 41 were compared with an image of their page; 263 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

9 tasks in 2 work orders. Intervals that fall due together are one visit: the annual visit also covers the semi-annual tasks.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6Semi
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Semi-annual · 8 tasks

Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, Table 7-1 Valves and Accessories Maintenance Checklist

TaskPage
Locate and operate distribution valvep124
Lubricate valve stem packing; tighten or replace if leakingp124
Check stem alignment and for broken stem or worn nutp124
Check, inspect and lubricate valve bypassp124
Check and lubricate valve gearsp124
Check and clean valve vaultp124
Check butterfly valve stem for leaksp124
Clean valve box, check corrosion and alignmentp127

Annual · 1 task

Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, Table 7-1 Valves and Accessories Maintenance Checklist

TaskPage
Check butterfly valve operation and tight closurep124

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Watermain valve, v0.6.0. https://unfinished.one/c/water-valve/v/0.6.0

BibTeX

@misc{unfinished_water_valve_0_6_0,
  title = {Watermain valve},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.6.0},
  url = {https://unfinished.one/c/water-valve/v/0.6.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.6.0, 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0