Uniformat G3010
Watermain, ductile iron
Also called DI watermain, ductile iron pipe
Service life
Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.
Basis
- 60 years · Barrie: City of Barrie Corporate Asset Management Plan: Proposed Levels of Service, p148 · “Watermain - Ductile Iron” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 75 years · Barrie: City of Barrie Corporate Asset Management Plan: Proposed Levels of Service, p148 · “Watermain - Ductile Iron with Cathodic Protection” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 60 years · Kenora: AF-6-1 Tangible Capital Asset Policy (By-law 34-2026), p17 · “Water Mains - Ductile Iron” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 50 years · Kingston: Tangible Capital Assets Policy, p15 · “Water Utility - Water Pipes: DI” (accounting life)Capital asset policy (amortization period). Approved on text check: the label and value were found on the cited page.
- 80 years · Belleville: Asset Management Plan - Comprehensive Citywide AMP - City of Belleville, p118 · “Table B 4 Water Pipework - DI <= 250mm” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 100 years · Belleville: Asset Management Plan - Comprehensive Citywide AMP - City of Belleville, p118 · “Table B 4 Water Pipework - DI 251- 400mm” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 160 years · Belleville: Asset Management Plan - Comprehensive Citywide AMP - City of Belleville, p118 · “Table B 4 Water Pipework - DI > 400mm” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 90 years · The Blue Mountains: Town of The Blue Mountains Asset Management Plan 2025, p26 · “Ductile Iron” (planning life)Asset management plan (planning life). Approved on text check: the label and value were found on the cited page.
- 90 years · Cornwall: 2025 Asset Management Plan City of Cornwall, p354 · “Watermain - Ductile Iron” (planning life)Asset management plan (planning life). Compared with an image of the cited page.
How sources are chosen and recorded: sourcing policy.
Municipal lives for water supply (G3010)
34 municipalities in Ontario state a life for water supply as a whole, in 40 distinct tables: 10–160 years, median 60. 73 rows come from capital asset policies (accounting lives, used for amortization) and 231 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.
Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.
All 287 stated lives
| Municipality | As written | Years | Kind | Source |
|---|---|---|---|---|
| Cornwall | Water Treatment - Process Instrumentation | 10 | planning | p386 · 2025 |
| Brantford | Distribution - Water Meters / Curb Stops | 15 | planning | p10 · 2025 |
| Chatham-Kent | Wells | 15 | planning | p13 · 2025 |
| Sarnia | Water Pumping Stations - mechanical/equipment | 15 | accounting | p1 |
| Haldimand County | Water - General Equipment | 15.2 | planning | p99 · 2025 |
| Cornwall | Water Treatment - Process Mechanical | 20 | planning | p386 · 2025 |
| Haldimand County | Water Meters | 20 | planning | p99 · 2025 |
| Norfolk County | Linear - Water Meters | 20 | planning | p59 · 2025 |
| Oxford | Woodstock water - Water Meter | 20 | planning | p221 · 2025 |
| Peterborough | Water Meters - Residential <50 mm | 20 | planning | p19 · 2025 |
| Peterborough | Water Meters - ICI >50 mm | 20 | planning | p19 · 2025 |
| The Blue Mountains | Linear - Fire Hydrants | 20 | accounting | p12 · 2019 |
| Meaford | Linear - Valves - Power Actuated | 20–30 | accounting | p19 · 2020 |
| Meaford | Linear - Valves - Gate | 25 | accounting | p19 · 2020 |
| Meaford | Linear - Valves - Air Release | 25 | accounting | p19 · 2020 |
| Orillia | Roads: Hydrants | 25 | accounting | p22 |
| Sarnia | Water Pumping Stations - pumps | 25 | accounting | p1 |
| Thunder Bay | Water fills station | 25 | planning | p77 · 2025 |
| Haldimand County | Water Depot | 28.3 | planning | p99 · 2025 |
| Barrie | Watermain - Galvanized | 30 | planning | p148 · 2025 |
| Cornwall | Water Treatment - Process Electrical | 30 | planning | p386 · 2025 |
| Cornwall | Water Treatment - Process Piping | 30 | planning | p386 · 2025 |
| Peterborough | Communication Devices - Repeater | 30 | planning | p19 · 2025 |
| Peterborough | Communication Devices - Gate Keepers | 30 | planning | p19 · 2025 |
| Rainy River | Water valves/services | 30 | accounting | p11 · 2010 |
| Rainy River | Water valves/services | 30 | planning | p17 · 2026 |
| Chatham-Kent | Bulk Water Stations | 35 | planning | p13 · 2025 |
| London | Pump Stations (Including Rechlorination) | 35 | planning | p70 · 2023 |
| Belleville | Table B 4 Water Pipework - RL (all diameters) | 40 | planning | p118 · 2022 |
| Chapple | Water Mains & Hydrants | 40 | planning | p75 · 2025 |
| Chapple | Water Meters | 40 | planning | p75 · 2025 |
| Chapple | Fire Hydrants | 40 | accounting | p1 |
| Chatham-Kent | Booster Pump Stations | 40 | planning | p13 · 2025 |
| Greater Sudbury | System Valve | 40 | planning | p26 · 2023 |
| Kapuskasing | Water Treatment Plant (Upgrade at 40 years) | 40 | planning | p7 · 2022 |
| Oxford | Woodstock water - Hydrant | 40 | planning | p221 · 2025 |
| Oxford | Woodstock water - Valve | 40 | planning | p221 · 2025 |
| Prince Edward | Water - Valves (Pooled) | 40 | accounting | p34 · 2022 |
| Sarnia | Fire Hydrants | 40 | accounting | p2 |
| Centre Hastings | Water | 40–60 | planning | p61 · 2025 |
| Centre Hastings | Water infrastructure | 40–60 | accounting | p5 |
| Haldimand County | Water Treatment Plant | 40.5 | planning | p99 · 2025 |
| Haldimand County | Water - Booster Station | 40.8 | planning | p99 · 2025 |
| The Blue Mountains | Polyvinyl Chloride- Grey DR26 | 45 | planning | p26 · 2025 |
| Trent Lakes · same table | CurbStop-Service | 45 | planning | p69, p69, p69, p69, p69, p69 · 2024 |
| Brantford | Distribution - Pump Stations | 46 | planning | p11 · 2025 |
| Brantford | Distribution - Elevated Tanks | 46 | planning | p11 · 2025 |
| Haldimand County | Water - General Building | 46.6 | planning | p99 · 2025 |
| Kirkland Lake | Water Valves | 48.7 | planning | p73 · 2025 |
| Kirkland Lake | Water Treatment | 49.1 | planning | p73 · 2025 |
| Orillia | Booster Station | 49.4 | planning | p95 · 2025 |
| Kirkland Lake | Booster Station | 49.8 | planning | p73 · 2025 |
| Amherstburg | Infrastructure - Water - Water Tower | 50 | accounting | p7 · 2026 |
| Barrie | Watermain - Cross linked Polyethylene | 50 | planning | p148 · 2025 |
| Barrie | Watermain - Steel | 50 | planning | p148 · 2025 |
| Barrie | Watermain - Cured-in-Place-Pipe (Lining) | 50 | planning | p148 · 2025 |
| Belleville | Table B 4 Water Pipework - CU (all diameters) | 50 | planning | p118 · 2022 |
| Brantford | Distribution - Watermain / Water Services - Copper | 50 | planning | p10 · 2025 |
| Brantford | Distribution - Water Services (from property line to watermain) - Copper | 50 | planning | p10 · 2025 |
| Chapple | Water Treatment Plant | 50 | planning | p75 · 2025 |
| Chapple | Wells | 50 | planning | p75 · 2025 |
| Chapple | Pumphouse | 50 | planning | p75 · 2025 |
| Chatham-Kent | Re-chlorination Stations | 50 | planning | p13 · 2025 |
| Greater Napanee | Water & Sewer Networks: LA50 Water Services | 50 | accounting | p17 · 2012 |
| Grey Highlands | Hydrants | 50 | accounting | p10 · 2026 |
| Grey Highlands | Water & Wastewater Treatment Assets - Water Tower | 50 | accounting | p11 · 2026 |
| Grey Highlands | Water & Wastewater Treatment Assets - Valve Chamber | 50 | accounting | p11 · 2026 |
| Grey Highlands | Water & Wastewater Treatment Assets - Clearwell | 50 | accounting | p11 · 2026 |
| Haldimand County | Water - Hydrant | 50 | planning | p99 · 2025 |
| Kapuskasing | Water Distribution System (pipes, hydrants, valves etc.) | 50 | accounting | p15 · 2009 |
| Kenora | Water Mains - Cast Iron | 50 | accounting | p17 · 2026 |
| Kingston | Water Utility - Water Pipes: DI | 50 | accounting | p15 · 2016 |
| Kingston | Water Utility - Water Pipes: Asbestos Cement | 50 | accounting | p15 · 2016 |
| Kingston | Water Utility - Water Other: Water valves | 50 | accounting | p15 · 2016 |
| Kirkland Lake | Water Distribution System (pipes, hydrants, valves etc.) | 50 | accounting | p10 · 2020 |
| Kirkland Lake | Hydrants | 50 | planning | p73 · 2025 |
| London | Valves | 50 | planning | p70 · 2023 |
| London | Hydrants | 50 | planning | p70 · 2023 |
| Meaford | Valve Chamber | 50 | accounting | p18 · 2020 |
| Meaford | Linear - Valves - Pressure Release | 50 | accounting | p19 · 2020 |
| Meaford | Linear - Valves - Globe | 50 | accounting | p19 · 2020 |
| Norfolk County | Vertical - Booster Stations and Reservoirs | 50 | planning | p59 · 2025 |
| Norfolk County | Vertical - Other Water Facilities | 50 | planning | p59 · 2025 |
| Norfolk County | Vertical - Water Towers and Standpipes | 50 | planning | p59 · 2025 |
| Norfolk County | Vertical - Water Treatment Plants | 50 | planning | p59 · 2025 |
| Norfolk County | Vertical - Wells | 50 | planning | p59 · 2025 |
| Orillia | Fire Hydrants | 50 | planning | p95 · 2025 |
| Quinte West · same table | Water Mains - Cast Iron | 50 | accounting | p37, p37 · 2024 |
| Quinte West | Pipe Relining | 50 | planning | p22 · 2025 |
| The Blue Mountains | Valve Chamber | 50 | accounting | p11 · 2019 |
| Trent Lakes | Water - Valves | 50 | accounting | p10 · 2009 |
| Welland | Water Systems (by component) - Water Services (includes fittings) | 50 | accounting | p9 · 2021 |
| Meaford | Linear - Fire Hydrant | 50–60 | accounting | p19 · 2020 |
| Orillia | Land Improvement (Infrastructure) - Reservoirs | 50–60 | accounting | p22 |
| Meaford | Linear - Valves - Valve Chamber | 50–80 | accounting | p19 · 2020 |
| Meaford | Linear - Valves - Maintenance Hatch | 50–80 | accounting | p19 · 2020 |
| Toronto | Conveyance - Linear Infrastructure (Transmission & Distribution) | 50–100 | planning | p355 · 2025 |
| Orillia | Water Filtration Plant | 52.3 | planning | p95 · 2025 |
| Halton | Booster Stations, Reservoirs, and Storage Facilities | 54 | planning | p67 · 2025 |
| Cornwall | Watermain - Steel | 55 | planning | p354 · 2025 |
| Barrie | Watermain - Ductile Iron | 60 | planning | p148 · 2025 |
| Barrie | Watermain - Plastic | 60 | planning | p148 · 2025 |
| Barrie | Watermain - Stainless Steel | 60 | planning | p148 · 2025 |
| Belleville | Table B 4 Water Pipework - CI <= 250mm | 60 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - C <= 250mm | 60 | planning | p118 · 2022 |
| Brantford | Treatment - Water Treatment Plant | 60 | planning | p11 · 2025 |
| Chatham-Kent | Water Treatment Plant | 60 | planning | p13 · 2025 |
| Chatham-Kent | Water Towers, Standpipes, & Surge Towers | 60 | planning | p13 · 2025 |
| Chatham-Kent | Reservoirs | 60 | planning | p13 · 2025 |
| Greater Sudbury | Cast Iron Watermain | 60 | planning | p26 · 2023 |
| Greater Sudbury | Hydrants | 60 | planning | p26 · 2023 |
| Greater Sudbury | Service Connection | 60 | planning | p26 · 2023 |
| Kenora | Water Mains - Ductile Iron | 60 | accounting | p17 · 2026 |
| Kingston | Water Utility - Water Pipes: Concrete | 60 | accounting | p15 · 2016 |
| Kingston | Water Utility - Water Other: Water hydrants | 60 | accounting | p15 · 2016 |
| London | Service Connections | 60 | planning | p70 · 2023 |
| London | Chambers (main diameter <= 450mm ) | 60 | planning | p70 · 2023 |
| London | Chambers (main diameter > 450mm) | 60 | planning | p70 · 2023 |
| London | Pressure Release Valve | 60 | planning | p70 · 2023 |
| Peterborough | Ancillaries - Valves <300 mm | 60 | planning | p19 · 2025 |
| Peterborough | Ancillaries - Valves Including Chambers >300 mm | 60 | planning | p19 · 2025 |
| Peterborough | Ancillaries - Hydrants | 60 | planning | p19 · 2025 |
| Peterborough | Water Treatment Plant - Waste Process Building | 60 | planning | p15 · 2025 |
| Peterborough | Water Treatment Plant - Generator Building | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Water Street Pumphouse | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Clonsilla Reservoir | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Clonsilla (Zone 2) | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Cumberland | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Greencrest | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Lansdowne | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Chemong | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Fairmount | 60 | planning | p15 · 2025 |
| Peterborough | Pumping Stations - Scollard | 60 | planning | p15 · 2025 |
| Peterborough | Elevated Storage Tanks - Milroy | 60 | planning | p15 · 2025 |
| Peterborough | Underground Reservoirs - Clonsilla | 60 | planning | p15 · 2025 |
| Peterborough | Underground Reservoirs - Towerhill | 60 | planning | p15 · 2025 |
| Peterborough | Bulk Fill Station - Milroy | 60 | planning | p15 · 2025 |
| Prince Edward | Water - Laterals/Connections (Pooled) | 60 | accounting | p34 · 2022 |
| Quinte West | Hydrants | 60 | accounting | p37 · 2024 |
| Rainy River | Water lines/Hydrants | 60 | accounting | p11 · 2010 |
| Rainy River | Water lines/Hydrants | 60 | planning | p17 · 2026 |
| Sarnia | Water Distribution | 60 | accounting | p2 |
| Severn | Infrastructure - Water & Sewer - Hydrants | 60 | accounting | p402 · 2019 |
| The Blue Mountains | Asbestos Cement | 60 | planning | p26 · 2025 |
| Thunder Bay | Pumping Stations | 60 | planning | p77 · 2025 |
| Thunder Bay | Reservoirs | 60 | planning | p77 · 2025 |
| Thunder Bay | Water Treatment Plant | 60 | planning | p77 · 2025 |
| Thunder Bay | Standpipe | 60 | planning | p77 · 2025 |
| Trent Lakes | Water - Mains | 60 | accounting | p10 · 2009 |
| Trent Lakes · same table | Water Facilities | 60 | planning | p69, p69, p69, p69 · 2024 |
| Welland | Water Systems (by component) - Hydrant Assemblies | 60 | accounting | p9 · 2021 |
| Kapuskasing | Water Wells | 60–80 | planning | p7 · 2022 |
| Prince Edward | Water - Water Mains | 60–80 | accounting | p34 · 2022 |
| Orillia | Reservoirs and Wells | 61.1 | planning | p95 · 2025 |
| Cornwall | Water Purification Plant | 62.6 | planning | p386 · 2025 |
| Kingston | Water Utility - Water Pipes: Average | 64 | accounting | p15 · 2016 |
| Brantford | Distribution - Watermain / Water Services - Cast Iron | 65 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - Ductile Iron | 65 | planning | p10 · 2025 |
| Cornwall | Reservoirs and Storage Tanks | 67 | planning | p354 · 2025 |
| Haldimand County | Water - Storage | 69.3 | planning | p99 · 2025 |
| Brantford | Distribution - Valves | 70 | planning | p10 · 2025 |
| Greater Sudbury | Maint. Hole & Chamber | 70 | planning | p26 · 2023 |
| Kingston | Water Utility - Water Pipes: HDPE | 70 | accounting | p15 · 2016 |
| Norfolk County | Linear - Local Mains | 70 | planning | p59 · 2025 |
| Prince Edward | Water - Hydrants (Pooled) | 70 | accounting | p34 · 2022 |
| Prince Edward | Water - Hydrants - Leads (Pooled) | 70 | accounting | p34 · 2022 |
| The Blue Mountains | Cast Iron | 70 | planning | p26 · 2025 |
| Kirkland Lake | Waterlines | 74.8 | planning | p73 · 2025 |
| Amherstburg | Other - Pooled Assets - Fire Hydrants | 75 | accounting | p8 · 2026 |
| Barrie | Watermain - Ductile Iron with Cathodic Protection | 75 | planning | p148 · 2025 |
| Barrie | Watermain - Asbestos Cement | 75 | planning | p148 · 2025 |
| Belleville | Table B 4 Water Pipework - HYPOTEC > 400mm | 75 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CC > 400mm | 75 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - Concrete > 400mm | 75 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP > 400mm | 75 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP AWWA C301 > 400mm | 75 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - UNKNOWN > 400mm | 75 | planning | p118 · 2022 |
| Brantford | Distribution - Hydrants | 75 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - Asbestos Cement | 75 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - Unknown | 75 | planning | p10 · 2025 |
| Brantford | Distribution - Water Services (from property line to watermain) - Unknown | 75 | planning | p10 · 2025 |
| Chatham-Kent | Hydrants | 75 | planning | p13 · 2025 |
| Grey Highlands | Watermain Pipe | 75 | accounting | p10 · 2026 |
| Haldimand County | Water Pipe | 75 | planning | p99 · 2025 |
| Kenora | Water Mains - PVC | 75 | accounting | p17 · 2026 |
| Kenora | Water Mains - PE | 75 | accounting | p17 · 2026 |
| Kenora | Water Mains - Valves | 75 | accounting | p17 · 2026 |
| Kenora | Water Mains - Hydrants | 75 | accounting | p17 · 2026 |
| Kenora | Booster Stations | 75 | accounting | p17 · 2026 |
| Kingston | Water Utility - Water Facilities: Tankage | 75 | accounting | p15 · 2016 |
| Kingston | Water Utility - Water Pipes: CI | 75 | accounting | p15 · 2016 |
| Kirkland Lake | Hydrant Leads | 75 | planning | p73 · 2025 |
| Meaford · same table | Storage (Water Tower) | 75 | planning | p135, p135, p135 · 2022 |
| Orillia | Watermains (<200mm) | 75 | planning | p95 · 2025 |
| Orillia | Watermains (200-300mm) | 75 | planning | p95 · 2025 |
| Orillia | Watermains (>300-450mm) | 75 | planning | p95 · 2025 |
| Orillia | Watermains (>450mm) | 75 | planning | p95 · 2025 |
| Peterborough | Services - Residential <50 mm | 75 | planning | p19 · 2025 |
| Peterborough | Services - ICI >50 mm | 75 | planning | p19 · 2025 |
| The Blue Mountains | High Density Polethylene | 75 | planning | p26 · 2025 |
| Thunder Bay | Watermains | 75 | planning | p77 · 2025 |
| Haldimand County | Water - Valve | 75.1 | planning | p99 · 2025 |
| Cornwall | Raw Water Intake Facilities | 78 | planning | p386 · 2025 |
| Barrie | Watermain - Cast Iron | 80 | planning | p148 · 2025 |
| Barrie | Watermain - Copper | 80 | planning | p148 · 2025 |
| Belleville | Table B 4 Water Pipework - CI 251- 400mm | 80 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - DI <= 250mm | 80 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - GI (all diameters) | 80 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - C 251- 400mm | 80 | planning | p118 · 2022 |
| Brockton | Waterworks - Watermains | 80 | accounting | p2 · 2009 |
| Chatham-Kent | Watermains (below 200 mm) | 80 | planning | p13 · 2025 |
| Chatham-Kent | Watermains (200 - 550mm) | 80 | planning | p13 · 2025 |
| Chatham-Kent | Watermains (550-750 mm) | 80 | planning | p13 · 2025 |
| Chatham-Kent | Watermains (Above 750 mm) | 80 | planning | p13 · 2025 |
| Greater Napanee | Water & Sewer Networks: LA80 Cast Iron Pipe, Concrete, Asbestos Cement Pipe, Fire Hydrants, Valves | 80 | accounting | p17 · 2012 |
| Greater Sudbury | HDPE Watermain | 80 | planning | p26 · 2023 |
| Kapuskasing | Water Tower | 80 | planning | p7 · 2022 |
| Kapuskasing | Water Piping | 80 | planning | p7 · 2022 |
| Kingston | Water Utility - Water Pipes: PVC | 80 | accounting | p15 · 2016 |
| London | Distribution Mains | 80 | planning | p70 · 2023 |
| Meaford · same table | Local Main | 80 | planning | p135, p135 · 2022 |
| Quinte West · same table | Water Mains - Polyethylene | 80 | accounting | p37, p37, p37, p37, p37 · 2024 |
| Severn | Infrastructure - Water & Sewer - Valves | 80 | accounting | p402 · 2019 |
| Severn | Infrastructure - Water & Sewer - Watermains | 80 | accounting | p403 · 2019 |
| The Blue Mountains | Polyvinyl Chloride- White DR26 | 80 | planning | p26 · 2025 |
| Welland | Water Systems (by component) - Water Mains (includes valves & fittings) | 80 | accounting | p9 · 2021 |
| Welland | Water Systems (by component) - Chambers & Vaults (for valves & meters) | 80 | accounting | p9 · 2021 |
| Cornwall | Watermain - Cast Iron | 81.5 | planning | p354 · 2025 |
| Halton | Distribution Mains (< 400mm) | 83 | planning | p67 · 2025 |
| Halton | Trunk Mains (>400mm) | 84 | planning | p67 · 2025 |
| Peterborough | Elevated Storage Tanks - Sherbrooke | 85 | planning | p15 · 2025 |
| Barrie | Watermain - High Density Polyethylene | 90 | planning | p148 · 2025 |
| Barrie | Watermain - PVC | 90 | planning | p148 · 2025 |
| Barrie | Watermain - Concrete | 90 | planning | p148 · 2025 |
| Brantford | Distribution - Watermain / Water Services - Polypropylene | 90 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - Pre-Stressed Concrete Cylinder | 90 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - PVC | 90 | planning | p10 · 2025 |
| Brantford | Distribution - Watermain / Water Services - PVC Bionax | 90 | planning | p10 · 2025 |
| Brantford | Distribution - Water Services (from property line to watermain) - PEX (cross-linked polyethylene) | 90 | planning | p10 · 2025 |
| Cornwall | Watermain - Ductile Iron | 90 | planning | p354 · 2025 |
| London | Transmission Mains | 90 | planning | p70 · 2023 |
| Oxford | Woodstock water - Watermain (<416mm) | 90 | planning | p221 · 2025 |
| Oxford | Woodstock water - Watermain (>=416mm) | 90 | planning | p221 · 2025 |
| Oxford | Woodstock water - Water Service Connection | 90 | planning | p221 · 2025 |
| The Blue Mountains · same table | Ductile Iron | 90 | planning | p26, p26 · 2025 |
| Greater Sudbury | Concrete Watermain | 95 | planning | p26 · 2023 |
| Cornwall | Watermains | 95.6 | planning | p354 · 2025 |
| London | Storage Reservoirs | 96 | planning | p70 · 2023 |
| Amherstburg | Infrastructure - Water - Watermains | 100 | accounting | p7 · 2026 |
| Belleville | Table B 4 Water Pipework - DI 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - HYPOTEC <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - HYPOTEC 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CC <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CC 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - Concrete <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - Concrete 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - Stainless-steel (all diameters) | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP AWWA C301 <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - CPP AWWA C301 251- 400mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - UNKNOWN <= 250mm | 100 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - UNKNOWN 251- 400mm | 100 | planning | p118 · 2022 |
| Cornwall | Watermain - Concrete Pressure Pipe | 100 | planning | p354 · 2025 |
| Cornwall | Watermain - Copper | 100 | planning | p354 · 2025 |
| Peterborough | Watermains - Distribution 300/250 mm | 100 | planning | p19 · 2025 |
| Peterborough | Watermains - Distribution 200/150 mm | 100 | planning | p19 · 2025 |
| Peterborough | Watermains - Distribution <150 mm | 100 | planning | p19 · 2025 |
| Peterborough | Watermains - Trunk >300 mm | 100 | planning | p19 · 2025 |
| Peterborough | Dam - Water Street | 100 | planning | p15 · 2025 |
| Peterborough | Elevated Storage Tanks - High | 100 | planning | p15 · 2025 |
| Quinte West | Pipe Replacement | 100 | planning | p22 · 2025 |
| The Blue Mountains | Polyvinyl Chloride- Blue DR18 | 100 | planning | p26 · 2025 |
| Greater Sudbury | PVC Watermain | 105 | planning | p26 · 2023 |
| Cornwall | Watermain - Polyvinyl Chloride | 110 | planning | p354 · 2025 |
| Peterborough | Water Treatment Plant - Filtration/Treatment Building | 130 | planning | p15 · 2025 |
| Belleville | Table B 4 Water Pipework - CI > 400mm | 140 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - C > 400mm | 140 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PVC (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - AC (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PVC CLASS 150 (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PE (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PVC DR-18 (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PVC DR18 (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - PE SDR 11 (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - HDPE SDR-11 (all diameters) | 150 | planning | p118 · 2022 |
| Belleville | Table B 4 Water Pipework - DI > 400mm | 160 | planning | p118 · 2022 |
Of 304 rows, 41 were compared with an image of their page; 263 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON
Preventive maintenance
2 tasks in 2 work orders. Intervals that fall due together are one visit: the every 5 years visit also covers the annual tasks.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12Annual
Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.
Annual · 1 task
Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, 6-3.3 Flushing (text)
| Task | Page |
|---|---|
| Flush distribution mains to remove deposits | p117 |
Every 5 years · 1 task
Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, 7-2.1.2 Hydrant-Flow Tests (text)
| Task | Page |
|---|---|
| Flow test all parts of the distribution system | p132 |
Frequencies are ISO 8601 durations in the data (P3M = every 3 months).
Open questions
- These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
Know the answer? Send it with a source to [email protected].
Cite this
Citation
unfinished.one (2026). Watermain, ductile iron, v0.5.0. https://unfinished.one/c/watermain-ductile-iron/v/0.5.0BibTeX
@misc{unfinished_watermain_ductile_iron_0_5_0,
title = {Watermain, ductile iron},
author = {{unfinished.one}},
year = {2026},
version = {0.5.0},
url = {https://unfinished.one/c/watermain-ductile-iron/v/0.5.0},
note = {CC BY 4.0}
}Licence CC BY 4.0 · How to cite · JSON · Versions: 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0