Uniformat G3030

Culvert, concrete

Also called concrete box culvert, concrete pipe culvert

  • Confidence B
  • Version 0.5.0 (permanent link)
  • Reviewed 2026-10-22

This is version 0.5.0. The latest is 0.8.0.

Service life

75 yearsmedian of the stated lives · sources say 70–75 years
01020304050607080907075

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for storm sewer (G3030)

49 municipalities in Ontario state a life for storm sewer as a whole, in 58 distinct tables: 20–150 years, median 50.3. 60 rows come from capital asset policies (accounting lives, used for amortization) and 201 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 50.3 yearsBrantford: Collection - Oil and Grit Separator, 20 yearsKenora: Storm Sewers - Culvert - STL, 20 yearsNorfolk County: Treatment & Control - Stormwater Management Ponds, 20 yearsSault Ste. Marie: Stormwater Other - Rain Gauges, 20 yearsSevern: Infrastructure - Roads - Ditches, 20 yearsBarrie: Low Impact Development, 25 yearsBrantford: Detention - Infiltration Gallery / Canal Inlet Gates, 25 yearsGreater Madawaska: Culverts, 25 yearsGreater Sudbury: Ponds, 25 yearsHalton: Storm Water Ponds, 25 yearsKapuskasing: Culverts - Steel, 25 yearsKenora: Storm Sewers - Pipe - STL, 25 yearsLondon: SWM Green Infrastructure, 25 yearsMeaford: Linear - Road Surface - Asphalt - Ditch, 25 yearsSault Ste. Marie: Conveyance System - Driveway Culverts, 25 yearsSevern: Infrastructure - Roads - Major Culverts, 25 yearsThe Blue Mountains: Linear - Road Top - Asphalt - Ditch, 25 yearsSault Ste. Marie: Conveyance System - Road Crossing Culverts, 29 yearsGreater Sudbury: CSP Storm Sewer, 30 yearsKingston: Minor Culverts (< 3 m) - Minor Culvert – Steel, 30 yearsLeeds and Grenville: Steel culvert, 30 yearsLeeds and Grenville: Stormwater - steel components, 30 yearsPeterborough: Stormwater Management - Ponds, 30 yearsChapple: Structural Culverts, 35 yearsYork: Corrugated steel pipe culverts: Replacement, 35 yearsHalton: Stormwater Pumping Stations, 39 yearsThunder Bay: Pumping Stations, 39 yearsBrockton: Storm Drains - Metal - Corrugated, 40 yearsChapple: Storm - Culverts, 40 yearsChapple: Storm - Drains, 40 yearsChapple: Culverts - steel, 40 yearsEssex: Stormwater Mains, 40 yearsKingston: Minor Culverts (< 3 m) - Minor Culvert – Unspecified, 40 yearsKirkland Lake: Culverts, 40 yearsMeaford: Linear - Stormwater Facility, 40 yearsRainy River: Drainage, 40 yearsRainy River: Drainage, 40 yearsSevern: Buildings/Structures - Water & Sewer - Intake Outfall Line, 40 yearsThe Blue Mountains: Linear - Culverts - Corrugated Steel, 40 yearsThe Blue Mountains: Linear - Stormwater Facility, 40 yearsThe Blue Mountains: Linear - Road Base - Asphalt - Ditch, 40 yearsTrent Lakes: Culverts, 40 yearsTrent Lakes: Small Culverts, 40 yearsWellington: Stormwater Pipes - Corrugated steel pipe (CSP), Clay, 40 yearsBrantford: Detention - Stormwater Pump Station, 44 yearsBruce: Culverts (weighted avg EUL), 44.1 yearsCornwall: Small Culverts (under 3m span), 47.9 yearsHaldimand County: Storm Ponds, 49.9 yearsAmherstburg: Catch Basins, 50 yearsAmherstburg: Municipal Drain Pumping Stations, 50 yearsAmherstburg: Storm Pumping Stations, 50 yearsAmherstburg: Infrastructure - Storm Water - Stormwater System, 50 yearsBarrie: Storm Sewers (Steel), 50 yearsBarrie: Culverts (Remaining Assets), 50 yearsBarrie: Filtration Devices, 50 yearsBarrie: Sediment Removal Devices, 50 yearsBrantford: Detention - Stormwater Pond / Overflow Storage Area, 50 yearsBrantford: Culverts - Corrugated Metal Pipe, 50 yearsBrantford: Culverts - Polyvinyl Chloride (PVC) Pipe, 50 yearsBrantford: Culverts - Unknown, 50 yearsChatham-Kent: Urban tile drains, 50 yearsElgin: Steel culverts, 50 yearsGreater Madawaska and Quinte West: Culverts, 50 yearsGreater Napanee: Storm Sewer System: Manholes, 50 yearsGreater Sudbury: Oil and Grit Separators, 50 yearsGrey Highlands: Catch Basins, 50 yearsHaldimand County: Structural Culverts, 50 yearsHalton: Culvert =>3m, 50 yearsHalton: Culvert <3m, 50 yearsHalton: Storm Mains, 50 yearsHalton: Oil Grit Seperator (OGS), 50 yearsHalton: Minor Culverts (Storm), 50 yearsKapuskasing: Storm Sewer System - PVC / CI, 50 yearsKapuskasing: Storm Sewer System - Concrete, 50 yearsKenora: Storm Sewers - Pipe - Conc/PE/PVC, 50 yearsKenora: Storm Sewers - Culvert - PE/PVC, 50 yearsKenora: Storm Sewers - Manholes, 50 yearsKenora: Storm Sewers - Catch Basins, 50 yearsKingston: Roads and Related - Storm sewer, 50 yearsKingston: Minor Culverts (< 3 m) - Minor Culvert – Concrete, 50 yearsKirkland Lake: Storm Sewer System - PVC / CI, Concrete, 50 yearsKirkland Lake: Road Culverts, 50 yearsKirkland Lake: Culverts, 50 yearsKirkland Lake: Catch Basins, 50 yearsKirkland Lake: Storm - Manholes, 50 yearsLambton: Steel culverts, 50 yearsLeeds and Grenville: Concrete culvert, 50 yearsLeeds and Grenville: Stormwater - concrete components, 50 yearsLondon: Minor Culverts (between 1.8m to 3m span), 50 yearsLondon: Major Culverts (greater than and equal to 3m span), 50 yearsMeaford: Linear - Road Base - Asphalt - Ditch, 50 yearsMiddlesex: Steel culverts, 50 yearsNorfolk County: Structures - Culvert, 50 yearsNorfolk County: Linear - Ditches, 50 yearsNorthumberland: Structures - Culverts over 3m, 50 yearsOrillia: Oil and Grit Separators, 50 yearsOrillia: Road and Driveway Culverts, 50 yearsPeterborough: Cross Culverts, 50 yearsPeterborough: Entrance Culverts, 50 yearsPeterborough: Structural Culverts (>3m), 50 yearsPeterborough: Catch Basins, 50 yearsPeterborough: Storm Manholes, 50 yearsPrince Edward: Storm - Storm Mains (Pooled), 50 yearsPrince Edward: Storm - Catch basins, 50 yearsPrince Edward: Storm - Outlets, 50 yearsRainy River: Culvert, 50 yearsSarnia: Catch Basins, 50 yearsSault Ste. Marie: Conveyance System - Ditches, 50 yearsSault Ste. Marie: Conveyance System - O&G Separators, 50 yearsSevern: Infrastructure - Water & Sewer - Catch Basins, 50 yearsSevern: Infrastructure - Water & Sewer - Double Catch Basins, 50 yearsSevern: Infrastructure - Water & Sewer - Catch Basin Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Double Catch Basin Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Storm Manhole, 50 yearsSevern: Infrastructure - Water & Sewer - Storm Sewers, 50 yearsSimcoe: Stormwater Outlets, 50 yearsSimcoe: Stormwater Sewers, 50 yearsSimcoe: Stormwater Ponds, 50 yearsSimcoe: Storm Ponds, 50 yearsSimcoe: Storm Sewers, 50 yearsSimcoe: Structural Culverts, 50 yearsStormont: Mains, 50 yearsThunder Bay: Culvert (over 3m), 50 yearsThunder Bay: Low Impact Developments, 50 yearsYork: Oil grit separator replacement, 50 yearsOrillia: Ditches, 50.3 yearsOrillia: Pump Stations, 51.1 yearsGreater Sudbury: AC Sewer, 55 yearsChatham-Kent: Access Culverts, 60 yearsChatham-Kent: Minor Culverts, 60 yearsChatham-Kent: Pumping Stations, 60 yearsEssex: Culverts, 60 yearsLeeds and Grenville: Stormwater - plastic components, 60 yearsLondon: Minor Culverts (Up to 1.8m in diameter), 60 yearsMeaford: Culverts - Steel <3m, 60 yearsNorfolk County: Linear - Storm Mains, 60 yearsQuinte West: Storm Water Ponds, 60 yearsRainy River: Sewer/Storm Sewer, 60 yearsRainy River: Sewer/Storm Sewer, 60 yearsSarnia: Storm Sewers, 60 yearsYork: Maintenance hole replacement, 60 yearsYork: Catch basin and ditch inlet replacement, 60 yearsSault Ste. Marie: Pump Stations, 66 yearsCornwall: Large Culverts (over 3m span), 66.2 yearsChatham-Kent: Culverts 2 - 3 m, 70 yearsCornwall: Storm Sewer - Asbestos Cement, 70 yearsGreater Sudbury: Catch Basin, 70 yearsGreater Sudbury: Maintenance Hole, 70 yearsKapuskasing: Culverts - Concrete, 70 yearsSault Ste. Marie: Conveyance System - Catch Basin Leads, 72 yearsOrillia: Stormwater Sewers, 73.4 yearsAmherstburg: Stormwater Manholes, 75 yearsAmherstburg: Stormwater Pipes, 75 yearsBarrie: Storm Sewers (Remaining Assets), 75 yearsBarrie: Culverts (Concrete), 75 yearsBrantford: Collection - Sluice Gates / Natural Watercourses / Ditches / Municipal Drains, 75 yearsBrantford: Culverts - Concrete, 75 yearsBrantford: Culverts - Masonry, 75 yearsBrockton: Storm Drains - Plastic, 75 yearsBrockton: Storm Drains - Concrete, 75 yearsBruce: Stormwater - Catch Basins (weighted avg EUL), 75 yearsBruce: Stormwater - Manholes (weighted avg EUL), 75 yearsBruce: Stormwater - Storm Sewers (weighted avg EUL), 75 yearsCentre Hastings: Stormwater Ponds & Linear, 75 yearsChatham-Kent: Linear pipes, 75 yearsChatham-Kent: Catch Basins, 75 yearsChatham-Kent: Catch Basin Leads, 75 yearsChatham-Kent: Lateral Services, 75 yearsCornwall: Storm Sewer - Corrugated Steel Pipe, 75 yearsCornwall: Storm Sewer - Steel, 75 yearsGreater Napanee: Storm Sewer System: Catch Basins, 75 yearsGrey Highlands: Storm Sewers Pipe, 75 yearsHalton: Retention Structure, 75 yearsHuron: CULVERT<2.5m, 75 yearsHuron: Driveway Culverts, 75 yearsKingston: Land Improvements - Storm water ponds, 75 yearsKirkland Lake: Storm Sewerlines, 75 yearsLambton: Concrete culverts, 75 yearsMeaford: Linear - Culverts - Concrete, 75 yearsMeaford: Culverts - Concrete, 75 yearsMiddlesex: Concrete culverts, 75 yearsOrillia: Structural Culvert, 75 yearsOrillia: Maintenance Holes, 75 yearsOrillia: Catch Basins and Leads, 75 yearsPeterborough: Conveyance - Pipes, 75 yearsPeterborough: Conveyance - Ancillaries, 75 yearsPeterborough: Storm Sewer, 75 yearsPrescott and Russell: Structural culvert, 75 yearsSimcoe: Culverts - Concrete, 75 yearsSimcoe: Culverts - Corrugated Steel, 75 yearsStormont: Catch Basins, 75 yearsStormont: Manholes, 75 yearsThe Blue Mountains: Linear - Culverts - Concrete, 75 yearsThe Blue Mountains: concrete culverts, 75 yearsWellington: Stormwater Pipes - No material data available, 75 yearsYork: Concrete culverts: Replacement, 75 yearsChatham-Kent: Maintenance Holes, 80 yearsChatham-Kent: Oil & Grit Separators, 80 yearsGreater Sudbury: HDPE Storm Sewer, 80 yearsKapuskasing: Stormwater Piping, 80 yearsLondon: Minor Treatment, 80 yearsMeaford: Stormwater Collection Main, 80 yearsSault Ste. Marie: Conveyance System - Sewers, 80 yearsSault Ste. Marie: Conveyance System - Catch Basins, 80 yearsSault Ste. Marie: Conveyance System - Aqueducts, 80 yearsSault Ste. Marie: Conveyance System - Service Connections, 80 yearsSault Ste. Marie: Conveyance System - Manholes & Chambers, 80 yearsSault Ste. Marie: Stormwater Other - Ponds, 80 yearsWelland: Sanitary & Storm Sewers (by component) - Catchbasins & Leads, 80 yearsGreater Napanee: Storm Sewer System: Drains, 90 yearsGreater Sudbury: Concrete Sewer, 90 yearsOxford: Catchbasins, 90 yearsOxford: Catchbasin Lead, 90 yearsOxford: Storm Lateral, 90 yearsOxford: Storm Main, 90 yearsOrillia: Stormwater Management Ponds, 95.9 yearsAmherstburg: Stormwater Ponds, 100 yearsBarrie: Storm Sewers (Asbestos Cement, Vitrified Clay), 100 yearsCornwall: Oil Grit Separators, 100 yearsCornwall: Storm Sewer - Concrete Pipe, 100 yearsCornwall: Storm Sewer - Concrete Pressure Pipe, 100 yearsCornwall: Storm Sewer - Reinforced Concrete, 100 yearsCornwall: Storm Sewer - Vitrified Clay, 100 yearsHaldimand County: Municipal Drains, 100 yearsHaldimand County: Storm Pipe, 100 yearsHaldimand County: Storm Structure, 100 yearsLondon: Storm sewers <450mm diameter, 100 yearsLondon: Storm sewers 450mm>= to <1,500mm diameter, 100 yearsLondon: Storm sewers >=1,500 mm diameter, 100 yearsLondon: Open Conveyance, 100 yearsLondon: Storm Water Management Facilities, 100 yearsNorfolk County: Natural Assets - Shoreline Assets, 100 yearsSault Ste. Marie: Stormwater Other - Snow Dumps, 100 yearsThunder Bay: Oil Grit Separators, 100 yearsThunder Bay: Dams, 100 yearsWellington: Stormwater Pipes - Concrete, polyvinyl chloride (PVC), high-density polyethylene (HDPE), 100 yearsWellington: Stormwater Structures - Concrete (catch basins, manholes), 100 yearsCornwall: Storm Sewers, 101.5 yearsCornwall: Storm Sewer - High-Density Polyethylene, 110 yearsCornwall: Storm Sewer - Polyvinyl Chloride, 110 yearsCornwall: Storm Sewer - Stainless Steel, 110 yearsThunder Bay: Storm sewers, 150 yearsGrey Highlands: Small Culverts, 20–40 yearsMeaford: Linear - Culverts - Corrugated Steel, 25–40 yearsAmherstburg: Culverts, 25–80 yearsGrey Highlands: Culverts, 30–40 yearsYork: Storm pipe replacement, 35–75 yearsYork: Outfall replacement, 35–75 yearsYork: Culverts under three metres: Replacement or relining, 35–75 yearsGrey Highlands: Storm Sewers, 50–60 yearsOxford: Structural Culverts, 50–65 yearsKapuskasing: Culverts, 50–80 yearsMeaford: Linear - Culverts - HDPE / PVC, 50–80 yearsOxford: Culverts <3m, 50–90 yearsToronto: Conveyance - Linear Infrastructure (Local & Trunk Sewers), 50–150 yearsNorthumberland: Storm Sewer - Structure (dependent on material), 60–80 yearsNorthumberland: Storm Sewer - Pipe (dependent on material), 60–80 years020406080100120140160

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 257 stated lives
MunicipalityAs writtenYearsKindSource
BrantfordCollection - Oil and Grit Separator20planningp11 · 2025
KenoraStorm Sewers - Culvert - STL20accountingp16 · 2026
Norfolk CountyTreatment & Control - Stormwater Management Ponds20planningp75 · 2025
Sault Ste. MarieStormwater Other - Rain Gauges20planningp14 · 2025
SevernInfrastructure - Roads - Ditches20accountingp402 · 2019
Grey HighlandsSmall Culverts20–40planningp70 · 2025
BarrieLow Impact Development25planningp127 · 2025
BrantfordDetention - Infiltration Gallery / Canal Inlet Gates25planningp11 · 2025
Greater MadawaskaCulverts25planningp43 · 2025
Greater SudburyPonds25planningp30 · 2023
HaltonStorm Water Ponds25planningp110 · 2025
KapuskasingCulverts - Steel25accountingp15 · 2009
KenoraStorm Sewers - Pipe - STL25accountingp16 · 2026
LondonSWM Green Infrastructure25planningp127 · 2023
MeafordLinear - Road Surface - Asphalt - Ditch25accountingp20 · 2020
Sault Ste. MarieConveyance System - Driveway Culverts25planningp14 · 2025
SevernInfrastructure - Roads - Major Culverts25accountingp402 · 2019
The Blue MountainsLinear - Road Top - Asphalt - Ditch25accountingp12 · 2019
MeafordLinear - Culverts - Corrugated Steel25–40accountingp19 · 2020
AmherstburgCulverts25–80planningp51 · 2025
Sault Ste. MarieConveyance System - Road Crossing Culverts29planningp14 · 2025
Greater SudburyCSP Storm Sewer30planningp30 · 2023
KingstonMinor Culverts (< 3 m) - Minor Culvert – Steel30planningp67 · 2024
Leeds and GrenvilleSteel culvert30planningp49 · 2025
Leeds and GrenvilleStormwater - steel components30planningp69 · 2025
PeterboroughStormwater Management - Ponds30planningp155 · 2025
Grey HighlandsCulverts30–40accountingp10 · 2026
ChappleStructural Culverts35planningp65 · 2025
YorkCorrugated steel pipe culverts: Replacement35planningp53 · 2024
YorkStorm pipe replacement35–75planningp53 · 2024
YorkOutfall replacement35–75planningp53 · 2024
YorkCulverts under three metres: Replacement or relining35–75planningp53 · 2024
HaltonStormwater Pumping Stations39planningp110 · 2025
Thunder BayPumping Stations39planningp92 · 2025
BrocktonStorm Drains - Metal - Corrugated40accountingp3 · 2009
ChappleStorm - Culverts40planningp97 · 2025
ChappleStorm - Drains40planningp97 · 2025
ChappleCulverts - steel40accountingp1
EssexStormwater Mains40planningp74 · 2025
KingstonMinor Culverts (< 3 m) - Minor Culvert – Unspecified40planningp67 · 2024
Kirkland LakeCulverts40accountingp10 · 2020
MeafordLinear - Stormwater Facility40accountingp19 · 2020
Rainy RiverDrainage40accountingp11 · 2010
Rainy RiverDrainage40planningp17 · 2026
SevernBuildings/Structures - Water & Sewer - Intake Outfall Line40accountingp400 · 2019
The Blue MountainsLinear - Culverts - Corrugated Steel40accountingp12 · 2019
The Blue MountainsLinear - Stormwater Facility40accountingp12 · 2019
The Blue MountainsLinear - Road Base - Asphalt - Ditch40accountingp12 · 2019
Trent LakesCulverts40accountingp10 · 2009
Trent Lakes · same tableSmall Culverts40planningp67, p67, p67, p67 · 2024
WellingtonStormwater Pipes - Corrugated steel pipe (CSP), Clay40planningp133 · 2025
BrantfordDetention - Stormwater Pump Station44planningp11 · 2025
BruceCulverts (weighted avg EUL)44.1planningp56 · 2025
CornwallSmall Culverts (under 3m span)47.9planningp252 · 2025
Haldimand CountyStorm Ponds49.9planningp91 · 2025
AmherstburgCatch Basins50planningp62 · 2025
AmherstburgMunicipal Drain Pumping Stations50planningp62 · 2025
AmherstburgStorm Pumping Stations50planningp62 · 2025
AmherstburgInfrastructure - Storm Water - Stormwater System50accountingp7 · 2026
BarrieStorm Sewers (Steel)50planningp127 · 2025
BarrieCulverts (Remaining Assets)50planningp127 · 2025
BarrieFiltration Devices50planningp127 · 2025
BarrieSediment Removal Devices50planningp127 · 2025
BrantfordDetention - Stormwater Pond / Overflow Storage Area50planningp11 · 2025
BrantfordCulverts - Corrugated Metal Pipe50planningp12 · 2025
BrantfordCulverts - Polyvinyl Chloride (PVC) Pipe50planningp12 · 2025
BrantfordCulverts - Unknown50planningp12 · 2025
Chatham-KentUrban tile drains50planningp11 · 2025
ElginSteel culverts50planningp10 · 2025
Greater Madawaska, Quinte West · same tableCulverts50accountingp17, p37 · 2025
Greater NapaneeStorm Sewer System: Manholes50accountingp17 · 2012
Greater SudburyOil and Grit Separators50planningp30 · 2023
Grey HighlandsCatch Basins50accountingp10 · 2026
Haldimand CountyStructural Culverts50planningp84 · 2025
HaltonCulvert =>3m50planningp107 · 2025
HaltonCulvert <3m50planningp107 · 2025
HaltonStorm Mains50planningp110 · 2025
HaltonOil Grit Seperator (OGS)50planningp110 · 2025
HaltonMinor Culverts (Storm)50planningp110 · 2025
KapuskasingStorm Sewer System - PVC / CI50accountingp15 · 2009
KapuskasingStorm Sewer System - Concrete50accountingp15 · 2009
KenoraStorm Sewers - Pipe - Conc/PE/PVC50accountingp16 · 2026
KenoraStorm Sewers - Culvert - PE/PVC50accountingp16 · 2026
KenoraStorm Sewers - Manholes50accountingp16 · 2026
KenoraStorm Sewers - Catch Basins50accountingp16 · 2026
KingstonRoads and Related - Storm sewer50accountingp15 · 2016
KingstonMinor Culverts (< 3 m) - Minor Culvert – Concrete50planningp67 · 2024
Kirkland LakeStorm Sewer System - PVC / CI, Concrete50accountingp10 · 2020
Kirkland LakeRoad Culverts50planningp49 · 2025
Kirkland LakeCulverts50planningp62 · 2025
Kirkland LakeCatch Basins50planningp95 · 2025
Kirkland LakeStorm - Manholes50planningp95 · 2025
LambtonSteel culverts50planningp89 · 2025
Leeds and GrenvilleConcrete culvert50planningp49 · 2025
Leeds and GrenvilleStormwater - concrete components50planningp69 · 2025
LondonMinor Culverts (between 1.8m to 3m span)50planningp158 · 2023
LondonMajor Culverts (greater than and equal to 3m span)50planningp158 · 2023
MeafordLinear - Road Base - Asphalt - Ditch50accountingp19 · 2020
MiddlesexSteel culverts50planningp18 · 2022
Norfolk CountyStructures - Culvert50planningp49 · 2025
Norfolk CountyLinear - Ditches50planningp75 · 2025
NorthumberlandStructures - Culverts over 3m50planningp62 · 2022
OrilliaOil and Grit Separators50planningp146 · 2025
OrilliaRoad and Driveway Culverts50planningp146 · 2025
PeterboroughCross Culverts50planningp60 · 2025
PeterboroughEntrance Culverts50planningp60 · 2025
PeterboroughStructural Culverts (>3m)50planningp60 · 2025
PeterboroughCatch Basins50planningp71 · 2025
PeterboroughStorm Manholes50planningp71 · 2025
Prince EdwardStorm - Storm Mains (Pooled)50accountingp34 · 2022
Prince EdwardStorm - Catch basins50accountingp34 · 2022
Prince EdwardStorm - Outlets50accountingp34 · 2022
Rainy RiverCulvert50planningp17 · 2026
SarniaCatch Basins50accountingp2
Sault Ste. MarieConveyance System - Ditches50planningp14 · 2025
Sault Ste. MarieConveyance System - O&G Separators50planningp14 · 2025
SevernInfrastructure - Water & Sewer - Catch Basins50accountingp402 · 2019
SevernInfrastructure - Water & Sewer - Double Catch Basins50accountingp402 · 2019
SevernInfrastructure - Water & Sewer - Catch Basin Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Double Catch Basin Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Storm Manhole50accountingp403 · 2019
SevernInfrastructure - Water & Sewer - Storm Sewers50accountingp403 · 2019
SimcoeStormwater Outlets50planningp92 · 2025
SimcoeStormwater Sewers50planningp92 · 2025
SimcoeStormwater Ponds50planningp92 · 2025
SimcoeStorm Ponds50accountingp21 · 2025
SimcoeStorm Sewers50accountingp21 · 2025
SimcoeStructural Culverts50accountingp21 · 2025
StormontMains50planningp27 · 2025
Thunder BayCulvert (over 3m)50planningp51 · 2025
Thunder BayLow Impact Developments50planningp92 · 2025
YorkOil grit separator replacement50planningp53 · 2024
Grey HighlandsStorm Sewers50–60planningp69 · 2025
OxfordStructural Culverts50–65planningp292 · 2025
KapuskasingCulverts50–80planningp7 · 2022
MeafordLinear - Culverts - HDPE / PVC50–80accountingp19 · 2020
OxfordCulverts <3m50–90planningp326 · 2025
TorontoConveyance - Linear Infrastructure (Local & Trunk Sewers)50–150planningp379 · 2025
OrilliaDitches50.3planningp146 · 2025
OrilliaPump Stations51.1planningp146 · 2025
Greater SudburyAC Sewer55planningp30 · 2023
Chatham-KentAccess Culverts60planningp9 · 2025
Chatham-KentMinor Culverts60planningp9 · 2025
Chatham-KentPumping Stations60planningp11 · 2025
EssexCulverts60planningp60 · 2025
Leeds and GrenvilleStormwater - plastic components60planningp69 · 2025
LondonMinor Culverts (Up to 1.8m in diameter)60planningp127 · 2023
MeafordCulverts - Steel <3m60planningp79 · 2022
Norfolk CountyLinear - Storm Mains60planningp75 · 2025
Quinte WestStorm Water Ponds60accountingp38 · 2024
Rainy RiverSewer/Storm Sewer60accountingp11 · 2010
Rainy RiverSewer/Storm Sewer60planningp17 · 2026
SarniaStorm Sewers60accountingp2
YorkMaintenance hole replacement60planningp53 · 2024
YorkCatch basin and ditch inlet replacement60planningp53 · 2024
NorthumberlandStorm Sewer - Structure (dependent on material)60–80planningp62 · 2022
NorthumberlandStorm Sewer - Pipe (dependent on material)60–80planningp62 · 2022
Sault Ste. MariePump Stations66planningp14 · 2025
CornwallLarge Culverts (over 3m span)66.2planningp252 · 2025
Chatham-KentCulverts 2 - 3 m70planningp9 · 2025
CornwallStorm Sewer - Asbestos Cement70planningp336 · 2025
Greater SudburyCatch Basin70planningp30 · 2023
Greater SudburyMaintenance Hole70planningp30 · 2023
KapuskasingCulverts - Concrete70accountingp15 · 2009
Sault Ste. MarieConveyance System - Catch Basin Leads72planningp14 · 2025
OrilliaStormwater Sewers73.4planningp146 · 2025
AmherstburgStormwater Manholes75planningp62 · 2025
AmherstburgStormwater Pipes75planningp62 · 2025
BarrieStorm Sewers (Remaining Assets)75planningp127 · 2025
BarrieCulverts (Concrete)75planningp127 · 2025
BrantfordCollection - Sluice Gates / Natural Watercourses / Ditches / Municipal Drains75planningp11 · 2025
BrantfordCulverts - Concrete75planningp12 · 2025
BrantfordCulverts - Masonry75planningp12 · 2025
BrocktonStorm Drains - Plastic75accountingp3 · 2009
BrocktonStorm Drains - Concrete75accountingp3 · 2009
BruceStormwater - Catch Basins (weighted avg EUL)75planningp67 · 2025
BruceStormwater - Manholes (weighted avg EUL)75planningp67 · 2025
BruceStormwater - Storm Sewers (weighted avg EUL)75planningp67 · 2025
Centre HastingsStormwater Ponds & Linear75planningp66 · 2025
Chatham-KentLinear pipes75planningp11 · 2025
Chatham-KentCatch Basins75planningp11 · 2025
Chatham-KentCatch Basin Leads75planningp11 · 2025
Chatham-KentLateral Services75planningp11 · 2025
CornwallStorm Sewer - Corrugated Steel Pipe75planningp336 · 2025
CornwallStorm Sewer - Steel75planningp336 · 2025
Greater NapaneeStorm Sewer System: Catch Basins75accountingp17 · 2012
Grey HighlandsStorm Sewers Pipe75accountingp10 · 2026
HaltonRetention Structure75planningp110 · 2025
HuronCULVERT<2.5m75planningp35 · 2025
HuronDriveway Culverts75planningp35 · 2025
KingstonLand Improvements - Storm water ponds75accountingp14 · 2016
Kirkland LakeStorm Sewerlines75planningp95 · 2025
LambtonConcrete culverts75planningp89 · 2025
MeafordLinear - Culverts - Concrete75accountingp19 · 2020
MeafordCulverts - Concrete75planningp79 · 2022
MiddlesexConcrete culverts75planningp18 · 2022
OrilliaStructural Culvert75planningp65 · 2025
OrilliaMaintenance Holes75planningp146 · 2025
OrilliaCatch Basins and Leads75planningp146 · 2025
PeterboroughConveyance - Pipes75planningp155 · 2025
PeterboroughConveyance - Ancillaries75planningp155 · 2025
PeterboroughStorm Sewer75planningp71 · 2025
Prescott and RussellStructural culvert75planningp52 · 2025
SimcoeCulverts - Concrete75planningp68 · 2025
SimcoeCulverts - Corrugated Steel75planningp68 · 2025
StormontCatch Basins75planningp27 · 2025
StormontManholes75planningp27 · 2025
The Blue MountainsLinear - Culverts - Concrete75accountingp12 · 2019
The Blue Mountainsconcrete culverts75planningp107 · 2025
WellingtonStormwater Pipes - No material data available75planningp133 · 2025
YorkConcrete culverts: Replacement75planningp53 · 2024
Chatham-KentMaintenance Holes80planningp11 · 2025
Chatham-KentOil & Grit Separators80planningp11 · 2025
Greater SudburyHDPE Storm Sewer80planningp30 · 2023
KapuskasingStormwater Piping80planningp7 · 2022
LondonMinor Treatment80planningp127 · 2023
MeafordStormwater Collection Main80planningp111 · 2022
Sault Ste. MarieConveyance System - Sewers80planningp14 · 2025
Sault Ste. MarieConveyance System - Catch Basins80planningp14 · 2025
Sault Ste. MarieConveyance System - Aqueducts80planningp14 · 2025
Sault Ste. MarieConveyance System - Service Connections80planningp14 · 2025
Sault Ste. MarieConveyance System - Manholes & Chambers80planningp14 · 2025
Sault Ste. MarieStormwater Other - Ponds80planningp14 · 2025
WellandSanitary & Storm Sewers (by component) - Catchbasins & Leads80accountingp9 · 2021
Greater NapaneeStorm Sewer System: Drains90accountingp17 · 2012
Greater SudburyConcrete Sewer90planningp30 · 2023
OxfordCatchbasins90planningp326 · 2025
OxfordCatchbasin Lead90planningp326 · 2025
OxfordStorm Lateral90planningp326 · 2025
OxfordStorm Main90planningp326 · 2025
OrilliaStormwater Management Ponds95.9planningp146 · 2025
AmherstburgStormwater Ponds100planningp62 · 2025
BarrieStorm Sewers (Asbestos Cement, Vitrified Clay)100planningp127 · 2025
CornwallOil Grit Separators100planningp335 · 2025
CornwallStorm Sewer - Concrete Pipe100planningp336 · 2025
CornwallStorm Sewer - Concrete Pressure Pipe100planningp336 · 2025
CornwallStorm Sewer - Reinforced Concrete100planningp336 · 2025
CornwallStorm Sewer - Vitrified Clay100planningp336 · 2025
Haldimand CountyMunicipal Drains100planningp91 · 2025
Haldimand CountyStorm Pipe100planningp91 · 2025
Haldimand CountyStorm Structure100planningp91 · 2025
LondonStorm sewers <450mm diameter100planningp127 · 2023
LondonStorm sewers 450mm>= to <1,500mm diameter100planningp127 · 2023
LondonStorm sewers >=1,500 mm diameter100planningp127 · 2023
LondonOpen Conveyance100planningp127 · 2023
LondonStorm Water Management Facilities100planningp127 · 2023
Norfolk CountyNatural Assets - Shoreline Assets100planningp75 · 2025
Sault Ste. MarieStormwater Other - Snow Dumps100planningp14 · 2025
Thunder BayOil Grit Separators100planningp92 · 2025
Thunder BayDams100planningp92 · 2025
WellingtonStormwater Pipes - Concrete, polyvinyl chloride (PVC), high-density polyethylene (HDPE)100planningp133 · 2025
WellingtonStormwater Structures - Concrete (catch basins, manholes)100planningp133 · 2025
CornwallStorm Sewers101.5planningp335 · 2025
CornwallStorm Sewer - High-Density Polyethylene110planningp336 · 2025
CornwallStorm Sewer - Polyvinyl Chloride110planningp336 · 2025
CornwallStorm Sewer - Stainless Steel110planningp336 · 2025
Thunder BayStorm sewers150planningp92 · 2025

Of 261 rows, 31 were compared with an image of their page; 230 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

3 tasks in 3 work orders. Intervals that fall due together are one visit: the every 5 years visit also covers the annual and every 3 years tasks.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Annual · 1 task

Source: Structures Inspection Manual, Part 3: Structures Inspection Procedures, Table 2.4 Level 1 inspection frequencies (Bridges and culverts)

TaskPage
Level 1 routine maintenance inspection of culvert (condition 1-3)p8

Every 3 years · 1 task

Source: Structures Inspection Manual, Part 3: Structures Inspection Procedures, Table 3.4.2 Level 2 inspection frequencies

TaskPage
Level 2 condition inspection of culvert (condition 3)p23

Every 5 years · 1 task

Source: Structures Inspection Manual, Part 3: Structures Inspection Procedures, Table 3.4.2 Level 2 inspection frequencies

TaskPage
Level 2 condition inspection of culvert (condition 1-2)p23

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.
  • Written for Queensland state-controlled road structures in a subtropical climate; TMR's web page says a later update changed inspection scope and frequency, so check the current edition.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Culvert, concrete, v0.5.0. https://unfinished.one/c/culvert-concrete/v/0.5.0

BibTeX

@misc{unfinished_culvert_concrete_0_5_0,
  title = {Culvert, concrete},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.5.0},
  url = {https://unfinished.one/c/culvert-concrete/v/0.5.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.8.0, 0.7.0, 0.6.0, 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0