unfinished.one

Uniformat G3010

Concrete pressure pipe watermain

A concrete pressure pipe watermain has a useful life of about 100 years, the median of 3 published sources, which state 75–100 years.

Also listed as Watermain, concrete pressure pipe, PCCP, concrete pressure pipe, prestressed concrete cylinder pipe

  • Confidence B
  • Version 0.6.0 (permanent link)
  • Reviewed 2026-10-22

Service life

100 yearsmedian of the stated lives · sources say 75–100 years
010203040506070809010011012075100

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Work out when yours is due for replacement · Compare with what municipalities assume

Basis

How sources are chosen and recorded: sourcing policy.

Municipal lives for water supply (G3010)

34 municipalities in Ontario state a life for water supply as a whole, in 40 distinct tables: 10–160 years, median 60. 73 rows come from capital asset policies (accounting lives, used for amortization) and 231 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 60 yearsCornwall: Water supply, 10 yearsBrantford: Water supply, 15 yearsChatham-Kent: Water supply, 15 yearsSarnia: Water supply, 15 yearsHaldimand County: Water supply, 15.2 yearsCornwall: Water supply, 20 yearsHaldimand County: Water meter, 20 yearsNorfolk County: Water meter, 20 yearsOxford: Water meter, 20 yearsPeterborough: Water meter, 20 yearsPeterborough: Water meter, 20 yearsThe Blue Mountains: Fire hydrant, 20 yearsMeaford: Water supply, 25 yearsMeaford: Water supply, 25 yearsOrillia: Fire hydrant, 25 yearsSarnia: Water supply, 25 yearsThunder Bay: Water supply, 25 yearsHaldimand County: Water supply, 28.3 yearsBarrie: Water supply, 30 yearsCornwall: Water supply, 30 yearsCornwall: Water supply, 30 yearsPeterborough: Water supply, 30 yearsPeterborough: Water supply, 30 yearsRainy River: Water supply, 30 yearsRainy River: Water supply, 30 yearsChatham-Kent: Water supply, 35 yearsLondon: Water supply, 35 yearsBelleville: Water supply, 40 yearsChapple: Water supply, 40 yearsChapple: Water meter, 40 yearsChapple: Fire hydrant, 40 yearsChatham-Kent: Water supply, 40 yearsGreater Sudbury: Watermain valve, 40 yearsKapuskasing: Water supply, 40 yearsOxford: Fire hydrant, 40 yearsOxford: Watermain valve, 40 yearsPrince Edward: Watermain valve, 40 yearsSarnia: Fire hydrant, 40 yearsHaldimand County: Water supply, 40.5 yearsHaldimand County: Water supply, 40.8 yearsThe Blue Mountains: Watermain, PVC, 45 yearsTrent Lakes: Water supply, 45 yearsBrantford: Water supply, 46 yearsBrantford: Water supply, 46 yearsHaldimand County: Water supply, 46.6 yearsKirkland Lake: Watermain valve, 48.7 yearsKirkland Lake: Water supply, 49.1 yearsOrillia: Water supply, 49.4 yearsKirkland Lake: Water supply, 49.8 yearsAmherstburg: Water supply, 50 yearsBarrie: Water supply, polyethylene, 50 yearsBarrie: Water supply, steel, 50 yearsBarrie: Water supply, 50 yearsBelleville: Water supply, 50 yearsBrantford: Water supply, 50 yearsBrantford: Water service connection, 50 yearsChapple: Water supply, 50 yearsChapple: Water supply, 50 yearsChapple: Water supply, 50 yearsChatham-Kent: Water supply, 50 yearsGreater Napanee: Water supply, 50 yearsGrey Highlands: Fire hydrant, 50 yearsGrey Highlands: Water supply, 50 yearsGrey Highlands: Water supply, 50 yearsGrey Highlands: Water supply, 50 yearsHaldimand County: Fire hydrant, 50 yearsKapuskasing: Water supply, 50 yearsKenora: Watermain, cast iron, 50 yearsKingston: Watermain, ductile iron, 50 yearsKingston: Water supply, asbestos cement, 50 yearsKingston: Watermain valve, 50 yearsKirkland Lake: Water supply, 50 yearsKirkland Lake: Fire hydrant, 50 yearsLondon: Watermain valve, 50 yearsLondon: Fire hydrant, 50 yearsMeaford: Water supply, 50 yearsMeaford: Water supply, 50 yearsMeaford: Water supply, 50 yearsNorfolk County: Water supply, 50 yearsNorfolk County: Water supply, 50 yearsNorfolk County: Water supply, 50 yearsNorfolk County: Water supply, 50 yearsNorfolk County: Water supply, 50 yearsOrillia: Fire hydrant, 50 yearsQuinte West: Watermain, cast iron, 50 yearsQuinte West: Water supply, 50 yearsThe Blue Mountains: Water supply, 50 yearsTrent Lakes: Watermain valve, 50 yearsWelland: Water service connection, 50 yearsOrillia: Water supply, 52.3 yearsHalton: Water supply, 54 yearsCornwall: Water supply, steel, 55 yearsBarrie: Watermain, ductile iron, 60 yearsBarrie: Water supply, 60 yearsBarrie: Water supply, steel, 60 yearsBelleville: Watermain, cast iron, 60 yearsBelleville: Water supply, 60 yearsBrantford: Water supply, 60 yearsChatham-Kent: Water supply, 60 yearsChatham-Kent: Water supply, 60 yearsChatham-Kent: Water supply, 60 yearsGreater Sudbury: Watermain, cast iron, 60 yearsGreater Sudbury: Fire hydrant, 60 yearsGreater Sudbury: Water service connection, 60 yearsKenora: Watermain, ductile iron, 60 yearsKingston: Water supply, concrete, 60 yearsKingston: Water supply, 60 yearsLondon: Water service connection, 60 yearsLondon: Water supply, 60 yearsLondon: Water supply, 60 yearsLondon: Water supply, 60 yearsPeterborough: Watermain valve, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Fire hydrant, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPeterborough: Water supply, 60 yearsPrince Edward: Water supply, 60 yearsQuinte West: Fire hydrant, 60 yearsRainy River: Water supply, 60 yearsRainy River: Water supply, 60 yearsSarnia: Water supply, 60 yearsSevern: Fire hydrant, 60 yearsThe Blue Mountains: Water supply, asbestos cement, 60 yearsThunder Bay: Water supply, 60 yearsThunder Bay: Water supply, 60 yearsThunder Bay: Water supply, 60 yearsThunder Bay: Water supply, 60 yearsTrent Lakes: Water supply, 60 yearsTrent Lakes: Water supply, 60 yearsWelland: Water supply, 60 yearsOrillia: Water supply, 61.1 yearsCornwall: Water supply, 62.6 yearsKingston: Water supply, 64 yearsBrantford: Water supply, cast iron, 65 yearsBrantford: Water supply, ductile iron, 65 yearsCornwall: Water supply, 67 yearsHaldimand County: Water supply, 69.3 yearsBrantford: Watermain valve, 70 yearsGreater Sudbury: Water supply, 70 yearsKingston: Watermain, HDPE, 70 yearsNorfolk County: Water supply, 70 yearsPrince Edward: Water supply, 70 yearsPrince Edward: Water supply, 70 yearsThe Blue Mountains: Watermain, cast iron, 70 yearsKirkland Lake: Water supply, 74.8 yearsAmherstburg: Fire hydrant, 75 yearsBarrie: Watermain, ductile iron, 75 yearsBarrie: Water supply, asbestos cement, 75 yearsBelleville: Water supply, 75 yearsBelleville: Water supply, 75 yearsBelleville: Water supply, concrete, 75 yearsBelleville: Watermain, concrete pressure pipe, 75 yearsBelleville: Watermain, concrete pressure pipe, 75 yearsBelleville: Water supply, 75 yearsBrantford: Fire hydrant, 75 yearsBrantford: Water supply, asbestos cement, 75 yearsBrantford: Water supply, 75 yearsBrantford: Water supply, 75 yearsChatham-Kent: Fire hydrant, 75 yearsGrey Highlands: Water supply, 75 yearsHaldimand County: Water supply, 75 yearsKenora: Watermain, PVC, 75 yearsKenora: Watermain, HDPE, 75 yearsKenora: Watermain valve, 75 yearsKenora: Fire hydrant, 75 yearsKenora: Water supply, 75 yearsKingston: Water supply, 75 yearsKingston: Watermain, cast iron, 75 yearsKirkland Lake: Water supply, 75 yearsMeaford: Water supply, 75 yearsOrillia: Water supply, 75 yearsOrillia: Water supply, 75 yearsOrillia: Water supply, 75 yearsOrillia: Water supply, 75 yearsPeterborough: Water service connection, 75 yearsPeterborough: Water service connection, 75 yearsThe Blue Mountains: Watermain, HDPE, 75 yearsThunder Bay: Water supply, 75 yearsHaldimand County: Watermain valve, 75.1 yearsCornwall: Water supply, 78 yearsBarrie: Watermain, cast iron, 80 yearsBarrie: Water supply, 80 yearsBelleville: Watermain, cast iron, 80 yearsBelleville: Watermain, ductile iron, 80 yearsBelleville: Water supply, 80 yearsBelleville: Water supply, 80 yearsBrockton: Water supply, 80 yearsChatham-Kent: Water supply, 80 yearsChatham-Kent: Water supply, 80 yearsChatham-Kent: Water supply, 80 yearsChatham-Kent: Water supply, 80 yearsGreater Napanee: Water supply, 80 yearsGreater Sudbury: Watermain, HDPE, 80 yearsKapuskasing: Water supply, 80 yearsKapuskasing: Water supply, 80 yearsKingston: Watermain, PVC, 80 yearsLondon: Water supply, 80 yearsMeaford: Water supply, 80 yearsQuinte West: Water supply, polyethylene, 80 yearsSevern: Water supply, 80 yearsSevern: Water supply, 80 yearsThe Blue Mountains: Watermain, PVC, 80 yearsWelland: Water supply, 80 yearsWelland: Water supply, 80 yearsCornwall: Watermain, cast iron, 81.5 yearsHalton: Water supply, 83 yearsHalton: Water supply, 84 yearsPeterborough: Water supply, 85 yearsBarrie: Watermain, HDPE, 90 yearsBarrie: Watermain, PVC, 90 yearsBarrie: Water supply, concrete, 90 yearsBrantford: Water supply, 90 yearsBrantford: Water supply, concrete, 90 yearsBrantford: Water supply, PVC, 90 yearsBrantford: Water supply, PVC, 90 yearsBrantford: Water service connection, 90 yearsCornwall: Watermain, ductile iron, 90 yearsLondon: Water supply, 90 yearsOxford: Water supply, wood, 90 yearsOxford: Water supply, wood, 90 yearsOxford: Water service connection, 90 yearsThe Blue Mountains: Watermain, ductile iron, 90 yearsGreater Sudbury: Water supply, concrete, 95 yearsCornwall: Water supply, 95.6 yearsLondon: Water supply, 96 yearsAmherstburg: Water supply, 100 yearsBelleville: Watermain, ductile iron, 100 yearsBelleville: Water supply, 100 yearsBelleville: Water supply, 100 yearsBelleville: Water supply, 100 yearsBelleville: Water supply, 100 yearsBelleville: Water supply, concrete, 100 yearsBelleville: Water supply, concrete, 100 yearsBelleville: Water supply, steel, 100 yearsBelleville: Watermain, concrete pressure pipe, 100 yearsBelleville: Watermain, concrete pressure pipe, 100 yearsBelleville: Watermain, concrete pressure pipe, 100 yearsBelleville: Watermain, concrete pressure pipe, 100 yearsBelleville: Water supply, 100 yearsBelleville: Water supply, 100 yearsCornwall: Watermain, concrete pressure pipe, 100 yearsCornwall: Water supply, 100 yearsPeterborough: Water supply, 100 yearsPeterborough: Water supply, 100 yearsPeterborough: Water supply, 100 yearsPeterborough: Water supply, 100 yearsPeterborough: Water supply, 100 yearsPeterborough: Water supply, 100 yearsQuinte West: Water supply, 100 yearsThe Blue Mountains: Watermain, PVC, 100 yearsGreater Sudbury: Watermain, PVC, 105 yearsCornwall: Watermain, PVC, 110 yearsPeterborough: Water supply, 130 yearsBelleville: Watermain, cast iron, 140 yearsBelleville: Water supply, 140 yearsBelleville: Watermain, PVC, 150 yearsBelleville: Water supply, asbestos cement, 150 yearsBelleville: Watermain, PVC, 150 yearsBelleville: Water supply, 150 yearsBelleville: Watermain, PVC, 150 yearsBelleville: Watermain, PVC, 150 yearsBelleville: Water supply, 150 yearsBelleville: Watermain, HDPE, 150 yearsBelleville: Watermain, ductile iron, 160 yearsMeaford: Water supply, 20–30 yearsCentre Hastings: Water supply, 40–60 yearsCentre Hastings: Water supply, 40–60 yearsMeaford: Fire hydrant, 50–60 yearsOrillia: Water supply, 50–60 yearsMeaford: Water supply, 50–80 yearsMeaford: Water supply, 50–80 yearsToronto: Water supply, 50–100 yearsKapuskasing: Water supply, 60–80 yearsPrince Edward: Water supply, 60–80 years020406080100120140160180

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 287 stated lives
MunicipalityCoversYearsKindSource
CornwallWater supply10planningp386 · 2025
BrantfordWater supply15planningp10 · 2025
Chatham-KentWater supply15planningp13 · 2025
SarniaWater supply15accountingp1
Haldimand CountyWater supply15.2planningp99 · 2025
CornwallWater supply20planningp386 · 2025
Haldimand CountyWater meter20planningp99 · 2025
Norfolk CountyWater meter20planningp59 · 2025
OxfordWater meter20planningp221 · 2025
PeterboroughWater meter20planningp19 · 2025
PeterboroughWater meter20planningp19 · 2025
The Blue MountainsFire hydrant20accountingp12 · 2019
MeafordWater supply20–30accountingp19 · 2020
MeafordWater supply25accountingp19 · 2020
MeafordWater supply25accountingp19 · 2020
OrilliaFire hydrant25accountingp22
SarniaWater supply25accountingp1
Thunder BayWater supply25planningp77 · 2025
Haldimand CountyWater supply28.3planningp99 · 2025
BarrieWater supply30planningp148 · 2025
CornwallWater supply30planningp386 · 2025
CornwallWater supply30planningp386 · 2025
PeterboroughWater supply30planningp19 · 2025
PeterboroughWater supply30planningp19 · 2025
Rainy RiverWater supply30accountingp11 · 2010
Rainy RiverWater supply30planningp17 · 2026
Chatham-KentWater supply35planningp13 · 2025
LondonWater supply35planningp70 · 2023
BellevilleWater supply40planningp118 · 2022
ChappleWater supply40planningp75 · 2025
ChappleWater meter40planningp75 · 2025
ChappleFire hydrant40accountingp1
Chatham-KentWater supply40planningp13 · 2025
Greater SudburyWatermain valve40planningp26 · 2023
KapuskasingWater supply40planningp7 · 2022
OxfordFire hydrant40planningp221 · 2025
OxfordWatermain valve40planningp221 · 2025
Prince EdwardWatermain valve40accountingp34 · 2022
SarniaFire hydrant40accountingp2
Centre HastingsWater supply40–60planningp61 · 2025
Centre HastingsWater supply40–60accountingp5
Haldimand CountyWater supply40.5planningp99 · 2025
Haldimand CountyWater supply40.8planningp99 · 2025
The Blue MountainsWatermain, PVC45planningp26 · 2025
Trent Lakes · same tableWater supply45planningp69, p69, p69, p69, p69, p69 · 2024
BrantfordWater supply46planningp11 · 2025
BrantfordWater supply46planningp11 · 2025
Haldimand CountyWater supply46.6planningp99 · 2025
Kirkland LakeWatermain valve48.7planningp73 · 2025
Kirkland LakeWater supply49.1planningp73 · 2025
OrilliaWater supply49.4planningp95 · 2025
Kirkland LakeWater supply49.8planningp73 · 2025
AmherstburgWater supply50accountingp7 · 2026
BarrieWater supply, polyethylene50planningp148 · 2025
BarrieWater supply, steel50planningp148 · 2025
BarrieWater supply50planningp148 · 2025
BellevilleWater supply50planningp118 · 2022
BrantfordWater supply50planningp10 · 2025
BrantfordWater service connection50planningp10 · 2025
ChappleWater supply50planningp75 · 2025
ChappleWater supply50planningp75 · 2025
ChappleWater supply50planningp75 · 2025
Chatham-KentWater supply50planningp13 · 2025
Greater NapaneeWater supply50accountingp17 · 2012
Grey HighlandsFire hydrant50accountingp10 · 2026
Grey HighlandsWater supply50accountingp11 · 2026
Grey HighlandsWater supply50accountingp11 · 2026
Grey HighlandsWater supply50accountingp11 · 2026
Haldimand CountyFire hydrant50planningp99 · 2025
KapuskasingWater supply50accountingp15 · 2009
KenoraWatermain, cast iron50accountingp17 · 2026
KingstonWatermain, ductile iron50accountingp15 · 2016
KingstonWater supply, asbestos cement50accountingp15 · 2016
KingstonWatermain valve50accountingp15 · 2016
Kirkland LakeWater supply50accountingp10 · 2020
Kirkland LakeFire hydrant50planningp73 · 2025
LondonWatermain valve50planningp70 · 2023
LondonFire hydrant50planningp70 · 2023
MeafordWater supply50accountingp18 · 2020
MeafordWater supply50accountingp19 · 2020
MeafordWater supply50accountingp19 · 2020
Norfolk CountyWater supply50planningp59 · 2025
Norfolk CountyWater supply50planningp59 · 2025
Norfolk CountyWater supply50planningp59 · 2025
Norfolk CountyWater supply50planningp59 · 2025
Norfolk CountyWater supply50planningp59 · 2025
OrilliaFire hydrant50planningp95 · 2025
Quinte West · same tableWatermain, cast iron50accountingp37, p37 · 2024
Quinte WestWater supply50planningp22 · 2025
The Blue MountainsWater supply50accountingp11 · 2019
Trent LakesWatermain valve50accountingp10 · 2009
WellandWater service connection50accountingp9 · 2021
MeafordFire hydrant50–60accountingp19 · 2020
OrilliaWater supply50–60accountingp22
MeafordWater supply50–80accountingp19 · 2020
MeafordWater supply50–80accountingp19 · 2020
TorontoWater supply50–100planningp355 · 2025
OrilliaWater supply52.3planningp95 · 2025
HaltonWater supply54planningp67 · 2025
CornwallWater supply, steel55planningp354 · 2025
BarrieWatermain, ductile iron60planningp148 · 2025
BarrieWater supply60planningp148 · 2025
BarrieWater supply, steel60planningp148 · 2025
BellevilleWatermain, cast iron60planningp118 · 2022
BellevilleWater supply60planningp118 · 2022
BrantfordWater supply60planningp11 · 2025
Chatham-KentWater supply60planningp13 · 2025
Chatham-KentWater supply60planningp13 · 2025
Chatham-KentWater supply60planningp13 · 2025
Greater SudburyWatermain, cast iron60planningp26 · 2023
Greater SudburyFire hydrant60planningp26 · 2023
Greater SudburyWater service connection60planningp26 · 2023
KenoraWatermain, ductile iron60accountingp17 · 2026
KingstonWater supply, concrete60accountingp15 · 2016
KingstonWater supply60accountingp15 · 2016
LondonWater service connection60planningp70 · 2023
LondonWater supply60planningp70 · 2023
LondonWater supply60planningp70 · 2023
LondonWater supply60planningp70 · 2023
PeterboroughWatermain valve60planningp19 · 2025
PeterboroughWater supply60planningp19 · 2025
PeterboroughFire hydrant60planningp19 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
PeterboroughWater supply60planningp15 · 2025
Prince EdwardWater supply60accountingp34 · 2022
Quinte WestFire hydrant60accountingp37 · 2024
Rainy RiverWater supply60accountingp11 · 2010
Rainy RiverWater supply60planningp17 · 2026
SarniaWater supply60accountingp2
SevernFire hydrant60accountingp402 · 2019
The Blue MountainsWater supply, asbestos cement60planningp26 · 2025
Thunder BayWater supply60planningp77 · 2025
Thunder BayWater supply60planningp77 · 2025
Thunder BayWater supply60planningp77 · 2025
Thunder BayWater supply60planningp77 · 2025
Trent LakesWater supply60accountingp10 · 2009
Trent Lakes · same tableWater supply60planningp69, p69, p69, p69 · 2024
WellandWater supply60accountingp9 · 2021
KapuskasingWater supply60–80planningp7 · 2022
Prince EdwardWater supply60–80accountingp34 · 2022
OrilliaWater supply61.1planningp95 · 2025
CornwallWater supply62.6planningp386 · 2025
KingstonWater supply64accountingp15 · 2016
BrantfordWater supply, cast iron65planningp10 · 2025
BrantfordWater supply, ductile iron65planningp10 · 2025
CornwallWater supply67planningp354 · 2025
Haldimand CountyWater supply69.3planningp99 · 2025
BrantfordWatermain valve70planningp10 · 2025
Greater SudburyWater supply70planningp26 · 2023
KingstonWatermain, HDPE70accountingp15 · 2016
Norfolk CountyWater supply70planningp59 · 2025
Prince EdwardWater supply70accountingp34 · 2022
Prince EdwardWater supply70accountingp34 · 2022
The Blue MountainsWatermain, cast iron70planningp26 · 2025
Kirkland LakeWater supply74.8planningp73 · 2025
AmherstburgFire hydrant75accountingp8 · 2026
BarrieWatermain, ductile iron75planningp148 · 2025
BarrieWater supply, asbestos cement75planningp148 · 2025
BellevilleWater supply75planningp118 · 2022
BellevilleWater supply75planningp118 · 2022
BellevilleWater supply, concrete75planningp118 · 2022
BellevilleWatermain, concrete pressure pipe75planningp118 · 2022
BellevilleWatermain, concrete pressure pipe75planningp118 · 2022
BellevilleWater supply75planningp118 · 2022
BrantfordFire hydrant75planningp10 · 2025
BrantfordWater supply, asbestos cement75planningp10 · 2025
BrantfordWater supply75planningp10 · 2025
BrantfordWater supply75planningp10 · 2025
Chatham-KentFire hydrant75planningp13 · 2025
Grey HighlandsWater supply75accountingp10 · 2026
Haldimand CountyWater supply75planningp99 · 2025
KenoraWatermain, PVC75accountingp17 · 2026
KenoraWatermain, HDPE75accountingp17 · 2026
KenoraWatermain valve75accountingp17 · 2026
KenoraFire hydrant75accountingp17 · 2026
KenoraWater supply75accountingp17 · 2026
KingstonWater supply75accountingp15 · 2016
KingstonWatermain, cast iron75accountingp15 · 2016
Kirkland LakeWater supply75planningp73 · 2025
Meaford · same tableWater supply75planningp135, p135, p135 · 2022
OrilliaWater supply75planningp95 · 2025
OrilliaWater supply75planningp95 · 2025
OrilliaWater supply75planningp95 · 2025
OrilliaWater supply75planningp95 · 2025
PeterboroughWater service connection75planningp19 · 2025
PeterboroughWater service connection75planningp19 · 2025
The Blue MountainsWatermain, HDPE75planningp26 · 2025
Thunder BayWater supply75planningp77 · 2025
Haldimand CountyWatermain valve75.1planningp99 · 2025
CornwallWater supply78planningp386 · 2025
BarrieWatermain, cast iron80planningp148 · 2025
BarrieWater supply80planningp148 · 2025
BellevilleWatermain, cast iron80planningp118 · 2022
BellevilleWatermain, ductile iron80planningp118 · 2022
BellevilleWater supply80planningp118 · 2022
BellevilleWater supply80planningp118 · 2022
BrocktonWater supply80accountingp2 · 2009
Chatham-KentWater supply80planningp13 · 2025
Chatham-KentWater supply80planningp13 · 2025
Chatham-KentWater supply80planningp13 · 2025
Chatham-KentWater supply80planningp13 · 2025
Greater NapaneeWater supply80accountingp17 · 2012
Greater SudburyWatermain, HDPE80planningp26 · 2023
KapuskasingWater supply80planningp7 · 2022
KapuskasingWater supply80planningp7 · 2022
KingstonWatermain, PVC80accountingp15 · 2016
LondonWater supply80planningp70 · 2023
Meaford · same tableWater supply80planningp135, p135 · 2022
Quinte West · same tableWater supply, polyethylene80accountingp37, p37, p37, p37, p37 · 2024
SevernWater supply80accountingp402 · 2019
SevernWater supply80accountingp403 · 2019
The Blue MountainsWatermain, PVC80planningp26 · 2025
WellandWater supply80accountingp9 · 2021
WellandWater supply80accountingp9 · 2021
CornwallWatermain, cast iron81.5planningp354 · 2025
HaltonWater supply83planningp67 · 2025
HaltonWater supply84planningp67 · 2025
PeterboroughWater supply85planningp15 · 2025
BarrieWatermain, HDPE90planningp148 · 2025
BarrieWatermain, PVC90planningp148 · 2025
BarrieWater supply, concrete90planningp148 · 2025
BrantfordWater supply90planningp10 · 2025
BrantfordWater supply, concrete90planningp10 · 2025
BrantfordWater supply, PVC90planningp10 · 2025
BrantfordWater supply, PVC90planningp10 · 2025
BrantfordWater service connection90planningp10 · 2025
CornwallWatermain, ductile iron90planningp354 · 2025
LondonWater supply90planningp70 · 2023
OxfordWater supply, wood90planningp221 · 2025
OxfordWater supply, wood90planningp221 · 2025
OxfordWater service connection90planningp221 · 2025
The Blue Mountains · same tableWatermain, ductile iron90planningp26, p26 · 2025
Greater SudburyWater supply, concrete95planningp26 · 2023
CornwallWater supply95.6planningp354 · 2025
LondonWater supply96planningp70 · 2023
AmherstburgWater supply100accountingp7 · 2026
BellevilleWatermain, ductile iron100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
BellevilleWater supply, concrete100planningp118 · 2022
BellevilleWater supply, concrete100planningp118 · 2022
BellevilleWater supply, steel100planningp118 · 2022
BellevilleWatermain, concrete pressure pipe100planningp118 · 2022
BellevilleWatermain, concrete pressure pipe100planningp118 · 2022
BellevilleWatermain, concrete pressure pipe100planningp118 · 2022
BellevilleWatermain, concrete pressure pipe100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
BellevilleWater supply100planningp118 · 2022
CornwallWatermain, concrete pressure pipe100planningp354 · 2025
CornwallWater supply100planningp354 · 2025
PeterboroughWater supply100planningp19 · 2025
PeterboroughWater supply100planningp19 · 2025
PeterboroughWater supply100planningp19 · 2025
PeterboroughWater supply100planningp19 · 2025
PeterboroughWater supply100planningp15 · 2025
PeterboroughWater supply100planningp15 · 2025
Quinte WestWater supply100planningp22 · 2025
The Blue MountainsWatermain, PVC100planningp26 · 2025
Greater SudburyWatermain, PVC105planningp26 · 2023
CornwallWatermain, PVC110planningp354 · 2025
PeterboroughWater supply130planningp15 · 2025
BellevilleWatermain, cast iron140planningp118 · 2022
BellevilleWater supply140planningp118 · 2022
BellevilleWatermain, PVC150planningp118 · 2022
BellevilleWater supply, asbestos cement150planningp118 · 2022
BellevilleWatermain, PVC150planningp118 · 2022
BellevilleWater supply150planningp118 · 2022
BellevilleWatermain, PVC150planningp118 · 2022
BellevilleWatermain, PVC150planningp118 · 2022
BellevilleWater supply150planningp118 · 2022
BellevilleWatermain, HDPE150planningp118 · 2022
BellevilleWatermain, ductile iron160planningp118 · 2022

Of 304 rows, 41 were compared with an image of their page; 263 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

2 tasks in 2 work orders. Intervals that fall due together are one visit: the every 5 years visit also covers the annual tasks.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Annual · 1 task

Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, 6-3.3 Flushing (text)

TaskPage
Flush distribution mains to remove depositsp117

Every 5 years · 1 task

Source: UFM 3-230-02 Operation and Maintenance (O&M): Water Supply Systems, 7-2.1.2 Hydrant-Flow Tests (text)

TaskPage
Flow test all parts of the distribution systemp132

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • These are Ontario accounting lives from municipal capital asset policies, not planning or observed replacement data.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Watermain, concrete pressure pipe, v0.6.0. https://unfinished.one/c/watermain-concrete-pressure/v/0.6.0

BibTeX

@misc{unfinished_watermain_concrete_pressure_0_6_0,
  title = {Watermain, concrete pressure pipe},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.6.0},
  url = {https://unfinished.one/c/watermain-concrete-pressure/v/0.6.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.6.0, 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0