unfinished.one

Uniformat D5010

Pad-mounted transformer

A pad-mounted transformer lasts about 32 years, the median of 3 published sources, which state 30–32 years.

Also listed as Transformer, pad-mounted liquid-filled, pad mount transformer

  • Confidence C
  • Version 0.5.0 (permanent link)
  • Reviewed 2026-10-23

Service life

32 yearsmedian of the stated lives · sources say 30–32 years
051015202530354030–32

Years in service. The band runs from the shortest to the longest life the sources state, so it shows how much they disagree, not how long 80% of units last. The line is the median of the stated lives.

Work out when yours is due for replacement

Basis

  • 30 years · CNA e-Tool Estimated Useful Life Table, p3 · HUD CNA 3.2.8.2.3 “Transformer” — U.S. Department of Housing and Urban Development (planning life)
    Same life for family and elderly properties. US multifamily housing. HUD's row is a site electric utility transformer.
  • 32 years · Energy Conservation Program: Energy Conservation Standards for Distribution Transformers (final rule), 78 FR 23336, April 18, 2013, p42 · IV.F.2.g “"DOE estimated, based on a report by Oak Ridge National Laboratory, that the average life of distribution transformers is 32 years." Table (PDF p.38, printed 23373): "mean lifetime for both liquid and dry-type transformers assumed to be 32 years."” — U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy (planning life)
    Printed page 23377. Low-voltage and medium-voltage dry-type transformers (owned by building owners) and liquid-immersed transformers (mostly utility-owned, including pad-mounted). One mean for both.
  • 32 years · Energy Conservation Program: Energy Conservation Standards for Distribution Transformers (final rule), 89 FR 29834, April 22, 2024, p113 · IV.F.8 “Transformer Service Lifetime: "a distribution of lifetimes, with an estimated average of 32 years and a maximum of 60 years"” — U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy (planning life)
    Printed page 29946. Covers all distribution transformers, including low-voltage dry-type (building dry-type) and medium-voltage liquid-immersed (pad-mounted). Mean of a distribution; the maximum is 60 years. Same value also stated on p.5 (printed 29838) and in Table IV summary on p.101 (printed 29934).

How sources are chosen and recorded: sourcing policy.

Municipal lives for electrical (D50)

41 municipalities in Ontario, British Columbia, Alberta, NB and NS state a life for electrical as a whole, in 32 distinct tables: 10–50 years, median 20. 50 rows come from capital asset policies (accounting lives, used for amortization) and 7 from asset management plans (planning lives, used to forecast replacement). They describe the system rather than this component, and none is a measured life.

Median 20 yearsKingston: Electrical, 10 yearsGrey Highlands: Electrical, 15 yearsMeaford: Electrical, 15 yearsThe Blue Mountains: Electrical, 15 yearsLloydminster: Electrical, 20 yearsLloydminster: Electrical, 20 yearsComox Valley: Plumbing, HVAC, Electrical, 20 yearsCranbrook: Plumbing, HVAC, Electrical, 20 yearsParksville: Electrical, 20 yearsTelkwa: Plumbing, Fire protection, Electrical, 20 yearsAmherstburg: HVAC, Electrical, 20 yearsGrey Highlands: Electrical, 20 yearsGrey Highlands: Electrical, 20 yearsHuron: Electrical, 20 yearsHuron: Electrical, 20 yearsHuron: Electrical, 20 yearsHuron: Electrical, 20 yearsKenora: Electrical, 20 yearsLondon: Plumbing, HVAC, Electrical, 20 yearsMeaford: Electrical, 20 yearsMeaford: Electrical, 20 yearsMeaford: Emergency lighting unit, 20 yearsThe Blue Mountains: Electrical, 20 yearsThe Blue Mountains: Electrical, 20 yearsWelland: HVAC, Electrical, 20 yearsDuncan and North Cowichan: HVAC, Electrical, 25 yearsLantzville: Plumbing, HVAC, Electrical, 25 yearsTofino: HVAC, Electrical, 25 yearsBathurst: HVAC, Electrical, 25 yearsBrantford: Electrical, 25 yearsBrantford: Electrical, 25 yearsGreater Napanee: HVAC, Electrical, 25 yearsKirkland Lake: HVAC, Electrical, 25 yearsRainy River: Plumbing, Electrical, 25 yearsRainy River: Plumbing, Electrical, 25 yearsThe Blue Mountains: Electrical, 25 yearsBathurst: Electrical, 30 yearsHalifax Regional Municipality: Superstructure, Electrical, 40 yearsBrockton: HVAC, Electrical, 40 yearsGreater Madawaska and Quinte West: Electrical, 40 yearsSimcoe: Electrical, 40 yearsTrent Lakes: Electrical, 40 yearsMeaford: Electrical, 50 yearsFort St. James, Revelstoke and 3 more: Plumbing, Fire protection, Electrical, 15–20 yearsOkanagan-Similkameen: Plumbing, Fire protection, Electrical, 15–20 yearsSalmo: Plumbing, Fire protection, Electrical, 15–20 yearsVulcan County: HVAC, Electrical, 20–30 yearsBancroft, Centre Hastings and 2 more: Plumbing, Electrical, 25–30 years0102030405060

Years. Each dot is one stated life and each bar a stated range; equal values stack. Hollow marks are planning lives from asset management plans; filled marks are accounting lives from policies. The dashed line is the median. Policies that copy the same table count once.

All 48 stated lives
MunicipalityCoversYearsKindSource
KingstonElectrical10accountingp15 · 2016
Grey HighlandsElectrical15accountingp11 · 2026
MeafordElectrical15accountingp17 · 2020
The Blue MountainsElectrical15accountingp11 · 2019
Fort St. James, Revelstoke, Rossland, Sicamous, Tumbler Ridge · same tablePlumbing, Fire protection, Electrical15–20accountingp5, p9, p7, p9, p5 · 2010
Okanagan-SimilkameenPlumbing, Fire protection, Electrical15–20accountingp11 · 2023
SalmoPlumbing, Fire protection, Electrical15–20accountingp6 · 2016
LloydminsterElectrical20accountingp11 · 2023
LloydminsterElectrical20accountingp11 · 2023
Comox ValleyPlumbing, HVAC, Electrical20accountingp6 · 2010
CranbrookPlumbing, HVAC, Electrical20accountingp9 · 2010
ParksvilleElectrical20accountingp9 · 2023
TelkwaPlumbing, Fire protection, Electrical20accountingp8
AmherstburgHVAC, Electrical20accountingp8 · 2026
Grey HighlandsElectrical20accountingp11 · 2026
Grey HighlandsElectrical20accountingp11 · 2026
HuronElectrical20planningp42 · 2025
HuronElectrical20planningp57 · 2025
HuronElectrical20planningp68 · 2025
HuronElectrical20planningp77 · 2025
KenoraElectrical20accountingp15 · 2026
LondonPlumbing, HVAC, Electrical20accountingp2 · 2023
MeafordElectrical20accountingp17 · 2020
MeafordElectrical20accountingp17 · 2020
MeafordEmergency lighting unit20accountingp17 · 2020
The Blue MountainsElectrical20accountingp11 · 2019
The Blue MountainsElectrical20accountingp11 · 2019
WellandHVAC, Electrical20accountingp8 · 2021
Vulcan CountyHVAC, Electrical20–30accountingp5 · 2024
Duncan, North Cowichan · same tableHVAC, Electrical25accountingp17, p9 · 2011
LantzvillePlumbing, HVAC, Electrical25accountingp11 · 2019
TofinoHVAC, Electrical25accountingp12 · 2009
BathurstHVAC, Electrical25accountingp9 · 2011
BrantfordElectrical25planningp10 · 2025
BrantfordElectrical25planningp10 · 2025
Greater NapaneeHVAC, Electrical25accountingp16 · 2012
Kirkland LakeHVAC, Electrical25accountingp10 · 2020
Rainy RiverPlumbing, Electrical25accountingp11 · 2010
Rainy RiverPlumbing, Electrical25planningp17 · 2026
The Blue MountainsElectrical25accountingp11 · 2019
Bancroft, Centre Hastings, Hastings Highlands, Wollaston · same tablePlumbing, Electrical25–30accountingp5, p4, p6, p5
BathurstElectrical30accountingp7 · 2011
Halifax Regional MunicipalitySuperstructure, Electrical40accountingp15 · 2024
BrocktonHVAC, Electrical40accountingp2 · 2009
Greater Madawaska, Quinte West · same tableElectrical40accountingp17, p38 · 2025
SimcoeElectrical40accountingp19 · 2025
Trent LakesElectrical40accountingp10 · 2009
MeafordElectrical50accountingp17 · 2020

Of 57 rows, 2 were compared with an image of their page; 55 were matched to their page automatically (the label and number appear in the page text). Follow the page link before relying on an automatically matched row. About the policies · All approved rows as JSON

Preventive maintenance

9 tasks in 2 work orders. Intervals that fall due together are one visit: the every 2 years visit also covers the annual tasks.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12Annual

Months from the schedule start. Download the tasks as CSV for a CMMS, or ask the MCP tool get_pm_schedule for dated visits.

Annual · 5 tasks

Source: TM 5-692-1 Maintenance of Mechanical and Electrical Equipment at Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Facilities: Recommended Maintenance Practices, Table 20-5 Transformers (primary distribution)

TaskPage
Inspect solid insulation for discolorationp165
Oil dielectric strength testp165
Oil acidity testp165
Oil color testp165
Verify transformer alarmsp165

Every 2 years · 4 tasks

Source: UFM 3-550-07 Operation and Maintenance (O&M): Exterior Power Distribution Systems, 5-2.2.4.1 Time-Base Preventative Maintenance (transformers)

TaskPage
Inspect transformer enclosure for rust and oil leaksp89
Check and record transformer gaugesp89
Take oil sample for dissolved gas analysis (DGA)p90
Infrared scan for hot spots under loadp90

Frequencies are ISO 8601 durations in the data (P3M = every 3 months).

Open questions

  • Every source here is a published planning, design or accounting life. None is observed replacement data.
  • Some maintenance intervals come from TM 5-692-1, an Army manual for mission-critical (C4ISR) facilities; they may be tighter than typical commercial practice.

Know the answer? Send it with a source to [email protected].

Cite this

Citation

unfinished.one (2026). Transformer, pad-mounted liquid-filled, v0.5.0. https://unfinished.one/c/transformer-pad-mounted/v/0.5.0

BibTeX

@misc{unfinished_transformer_pad_mounted_0_5_0,
  title = {Transformer, pad-mounted liquid-filled},
  author = {{unfinished.one}},
  year = {2026},
  version = {0.5.0},
  url = {https://unfinished.one/c/transformer-pad-mounted/v/0.5.0},
  note = {CC BY 4.0}
}

Licence CC BY 4.0 · How to cite · JSON · Versions: 0.5.0, 0.4.0, 0.3.0, 0.2.0, 0.1.0