38 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.

City of Barrie Corporate Asset Management Plan: Proposed Levels of Service

As writtenYearsSystemChecked againstPage
Arterial/Parkway45Roadwayspage textp76
Collector60Roadwayspage textp76
Local70Roadwayspage textp76
Road Bridges, Pedestrian Bridges (>3m span)75Roadwayspage textp76
Traffic Signals30Traffic signals and other site electricalpage textp76
Signs, Streetlights15Site lightingpage textp76
Streetlight Poles50Site lightingpage textp76
Paved Lots15Roadwayspage textp77
Sidewalks/Walkways/Boulevards (Concrete)40Sidewalks and walkwayspage textp77
Sidewalks/Walkways/Boulevards (Asphalt/Other)20Sidewalks and walkwayspage textp77
Park Parking Lots15Parking lotspage textp110
Storm Sewers (Asbestos Cement, Vitrified Clay)100Storm sewerpage textp127
Storm Sewers (Steel)50Storm sewerpage textp127
Storm Sewers (Remaining Assets)75Storm sewerpage textp127
Culverts (Concrete)75Storm sewerpage textp127
Culverts (Remaining Assets)50Storm sewerpage textp127
Filtration Devices50Storm sewerpage textp127
Sediment Removal Devices50Storm sewerpage textp127
Low Impact Development25Storm sewerpage textp127
Watermain - Ductile Iron60Water supplypage textp148
Watermain - Ductile Iron with Cathodic Protection75Water supplypage textp148
Watermain - Cast Iron80Water supplypage textp148
Watermain - Plastic60Water supplypage textp148
Watermain - Cross linked Polyethylene50Water supplypage textp148
Watermain - High Density Polyethylene90Water supplypage textp148
Watermain - PVC90Water supplypage textp148
Watermain - Concrete90Water supplypage textp148
Watermain - Asbestos Cement75Water supplypage textp148
Watermain - Stainless Steel60Water supplypage textp148
Watermain - Steel50Water supplypage textp148
Watermain - Galvanized30Water supplypage textp148
Watermain - Copper80Water supplypage textp148
Watermain - Cured-in-Place-Pipe (Lining)50Water supplypage textp148
Wastewater Mains (PVC)120Sanitary sewerpage textp165
Wastewater Mains (Vitrified Clay)100Sanitary sewerpage textp165
Wastewater Mains (Remaining Assets)80Sanitary sewerpage textp165
Sewer Laterals50Sanitary sewerpage textp165
Maintenance Holes50Sanitary sewerpage textp165