Ontario · Lower-tier municipality in Bruce, County of · population 9,784 (2021)
Brockton
Documents
Policy F06-2009-03 Capital Asset Amortization · 2009
Capital asset policy
Municipality of Brockton Asset Management Plan 2025 · 2025
Asset management plan · No useful-life table. Lives appear only as replacement-cost-weighted average EUL per segment in bar charts ("Estimated Useful Life vs. Asset Age" / "Average Age vs Average EUL" figures, one per asset category); category axis labels are not extractable as text from most charts, so values were not transcribed.
Stated lives
21 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
Policy F06-2009-03 Capital Asset Amortization
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Building Structure | 40 | Superstructure | page text | p2 |
| Mechanical/Electrical (Heating/Cooling System, Refridgerating System) | 40 | HVAC, Electrical | page text | p2 |
| Elevator - Mechanical Elevator | 35 | Conveying | page text | p2 |
| Bridges - Footings | 75 | Roadways | page text | p2 |
| Bridges - Super-Structures | 50 | Roadways | page text | p2 |
| Bridges - Deck | 25 | Roadways | page text | p2 |
| Bridges - Whole | 75 | Roadways | page text | p2 |
| Roads - Base - Urban | 80 | Roadways | page text | p2 |
| Roads - Base - Rural | 80 | Roadways | page text | p2 |
| Roads - Surface - Hot Mix - HCB | 35 | Roadways | page text | p2 |
| Roads - Surface - Surface Treatment | 20 | Roadways | page text | p2 |
| Waterworks - Watermains | 80 | Water supply | page text | p2 |
| Sewer Lines - Concrete | 80 | Sanitary sewer | page text | p2 |
| Sewer Lines - Brick | 80 | Sanitary sewer | page text | p2 |
| Sewer Lines - Metal | 80 | Sanitary sewer | page text | p2 |
| Sewer Lines - Polyethylene (PVC) | 100 | Sanitary sewer | page text | p3 |
| Storm Drains - Plastic | 75 | Storm sewer | page text | p3 |
| Storm Drains - Metal - Corrugated | 40 | Storm sewer | page text | p3 |
| Storm Drains - Concrete | 75 | Storm sewer | page text | p3 |
| Traffic Signals/Streetlights | 30 | Site lighting | page text | p3 |
| Sidewalks - Concrete Walkway | 30 | Sidewalks and walkways | page text | p3 |