unfinished.one

Ontario · Single-tier municipality · population 8,057 (2021)

Kapuskasing

Municipal website

Documents

Stated lives

26 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.

By-law No. 3103, Tangible Capital Assets Policy

As writtenYearsSystemChecked againstPage
Building Structure/Sheds40Superstructurepage textp14
HVAC Systems15HVACpage textp14
Roofs20Roofingpage textp14
Water Distribution System (pipes, hydrants, valves etc.)50Water supplypage textp15
Sanitary Sewer Collections System (pipes, force mains, etc)50Sanitary sewerpage textp15
Storm Sewer System - PVC / CI50Storm sewerpage textp15
Storm Sewer System - Concrete50Storm sewerpage textp15
Roads Surface - Surface Treated5Roadwayspage textp15
Roads Surface - Gravel / Asphalt10Roadwayspage textp15
Roads - includes all sanitary, storm, pipes, curbs, sidewalks, hydrants, streetlights, and everything pertinent to the road50—page textp15
Culverts - Steel25Storm sewerpage textp15
Culverts - Concrete70Storm sewerpage textp15
Sidewalks - Paving Stone / Concrete45Sidewalks and walkwayspage textp15
Bridges - Constructed75Roadwayspage textp15
Traffic Lights / Street Lights20Site lightingpage textp15

2022 Corporation of the Town of Kapuskasing Asset Management Plan

As writtenYearsSystemChecked againstPage
Water Wells60–80Water supplypage textp7
Water Treatment Plant (Upgrade at 40 years)40Water supplypage textp7
Water Tower80Water supplypage textp7
Water Piping80Water supplypage textp7
Wastewater Piping80Sanitary sewerpage textp7
Wastewater Lift Stations50Sanitary sewerpage textp7
Wastewater Treatment Plant (Upgrade at 40 years)40Sanitary sewerpage textp7
Stormwater Piping80Storm sewerpage textp7
Roads (Paved)20–40Roadwayspage textp7
Culverts50–80Storm sewerpage textp7
Bridges (Overhaul at 20 years)20Roadwayspage textp7