Ontario · Single-tier municipality · population 166,004 (2021)
Greater Sudbury
Documents
Enterprise Asset Management Plan (2023) · 2023
Asset management plan
Stated lives
33 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
Enterprise Asset Management Plan (2023)
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Paved Road | 60 | Roadways | page text | p22 |
| Gravel Road | 75 | Roadways | page text | p22 |
| Concrete Light Pole | 60 | Site lighting | page text | p22 |
| Aluminum Light Pole | 20 | Site lighting | page text | p22 |
| Annodized Al Light Pole | 25 | Site lighting | page text | p22 |
| Steel Light Pole | 10 | Site lighting | page text | p22 |
| Treated Wood Pole | 40 | Roadways | page text | p22 |
| PVC Watermain | 105 | Water supply | page text | p26 |
| Cast Iron Watermain | 60 | Water supply | page text | p26 |
| Concrete Watermain | 95 | Water supply | page text | p26 |
| HDPE Watermain | 80 | Water supply | page text | p26 |
| Hydrants | 60 | Water supply | page text | p26 |
| Maint. Hole & Chamber | 70 | Water supply | page text | p26 |
| System Valve | 40 | Water supply | page text | p26 |
| Service Connection | 60 | Water supply | page text | p26 |
| PVC Sewer | 105 | Sanitary sewer | page text | p28 |
| AC Cement Sewer | 55 | Sanitary sewer | page text | p28 |
| Concrete Sewer | 90 | Sanitary sewer | page text | p28 |
| Cast Iron Sewer | 60 | Sanitary sewer | page text | p28 |
| HDPE Sewer | 80 | Sanitary sewer | page text | p28 |
| Steel Sewer | 60 | Sanitary sewer | page text | p28 |
| Maintenance Hole | 70 | Sanitary sewer | page text | p28 |
| Service Connection | 60 | Sanitary sewer | page text | p28 |
| HDPE Storm Sewer | 80 | Storm sewer | page text | p30 |
| CSP Storm Sewer | 30 | Storm sewer | page text | p30 |
| Concrete Sewer | 90 | Storm sewer | page text | p30 |
| AC Sewer | 55 | Storm sewer | page text | p30 |
| Catch Basin | 70 | Storm sewer | page text | p30 |
| Oil and Grit Separators | 50 | Storm sewer | page text | p30 |
| Maintenance Hole | 70 | Storm sewer | page text | p30 |
| Ponds | 25 | Storm sewer | page text | p30 |
| Paved Lot | 60 | Roadways | page text | p34 |
| Gravel Lot | 60 | Roadways | page text | p34 |