By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives · 2020
Capital asset policy · shares its table layout with other municipalities (grey-county-rows)
Municipality of Meaford Asset Management Plan - Core Assets (Appendix 1 to Report CAO2022-28) · 2022
Asset management plan · its lives come from By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives, so its rows count with that document's
Stated lives
103 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
By-law 2020-83, Tangible Capital Asset Policy, Appendix A Estimated Useful Lives
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Foundations - Standard | 100 | Foundations | page text | p16 |
| Foundations - Slab On-grade | 75–100 | Foundations | page text | p16 |
| Plumbing - System | 50 | Plumbing | page text | p16 |
| Plumbing - Fixtures | 20 | Plumbing | page text | p16 |
| Plumbing - Cistern | 50 | Plumbing | page text | p16 |
| Superstructure - Wood Framing & Trusses | 100 | Superstructure | page text | p17 |
| Superstructure - Concrete Block | 100 | Superstructure | page text | p17 |
| Plumbing - Boiler | 20 | Plumbing | page text | p17 |
| Plumbing - Septic System | 25 | Plumbing | page text | p17 |
| Plumbing - Water Treatment System | 15 | Plumbing | page text | p17 |
| Exterior Closure - Concrete Block | 50 | Exterior enclosure | page text | p17 |
| Exterior Closure - Metal Cladding | 50 | Exterior enclosure | page text | p17 |
| Exterior Closure - Wood Cladding | 40 | Exterior enclosure | page text | p17 |
| Exterior Closure - Vinyl Siding | 30 | Exterior enclosure | page text | p17 |
| Exterior Closure - Standard Doors | 30 | Exterior enclosure | page text | p17 |
| Exterior Closure - Overhead Doors | 20 | Exterior enclosure | page text | p17 |
| Exterior Closure - Windows | 25 | Exterior enclosure | page text | p17 |
| HVAC - System | 50 | HVAC | page text | p17 |
| HVAC - Furnace | 15–25 | HVAC | page text | p17 |
| HVAC - Air Distribution | 20 | HVAC | page text | p17 |
| Fire Protection - Sprinkler System | 25 | Fire protection | page text | p17 |
| Fire Protection - Alarm Panel | 25 | Fire protection | page text | p17 |
| Roof - Metal | 40–50 | Roofing | page text | p17 |
| Roof - Flat | 30 | Roofing | page text | p17 |
| Roof - Asphalt Shingles | 25 | Roofing | page text | p17 |
| Roof - Tile | 30 | Roofing | page text | p17 |
| Roof - Soffit & Fascia | 25–50 | Roofing | page text | p17 |
| Electrical - System | 50 | Electrical | page text | p17 |
| Electrical - Interior Lighting - Standard | 20 | Electrical | page text | p17 |
| Electrical - Interior Lighting - High Wattage | 20 | Electrical | page text | p17 |
| Electrical - Emergency Lighting | 20 | Electrical | page text | p17 |
| Electrical - Exterior Lighting | 15 | Electrical | page text | p17 |
| Interior Construction - Gypsum Board | 45 | Interior construction | page text | p17 |
| Interior Construction - Steel Panelling | 50 | Interior construction | page text | p17 |
| Furnishing - Cabinets | 25 | — | page text | p17 |
| Interior Construction - Wood Panelling | 30 | Interior construction | page text | p18 |
| Interior Construction - Poly Panelling | 50 | Interior construction | page text | p18 |
| Interior Construction - Doors | 30 | Interior construction | page text | p18 |
| Interior Construction - Partitions | 20 | Interior construction | page text | p18 |
| Flooring - Carpet | 15–25 | Interior finishes | page text | p18 |
| Flooring - Vinyl | 20 | Interior finishes | page text | p18 |
| Flooring - Concrete | 20 | Interior finishes | page text | p18 |
| Flooring - Tile | 15–30 | Interior finishes | page text | p18 |
| Flooring - Hardwood | 20–50 | Interior finishes | page text | p18 |
| Land Improvements - Parking Lot - Asphalt | 30 | Parking lots | page text | p16 |
| Land Improvements - Parking Lot - Gravel | 30 | Parking lots | page text | p16 |
| Wet Well | 50 | Sanitary sewer | page text | p18 |
| Dry Well | 50 | Sanitary sewer | page text | p18 |
| Valve Chamber | 50 | Water supply | page text | p18 |
| Holding Tank | 50 | — | page text | p18 |
| Linear - Bridges - Wearing Surface | 30 | Roadways | page text | p19 |
| Linear - Bridges - Substructure | 50–75 | Roadways | page text | p19 |
| Linear - Bridges - Superstructure | 25–75 | Roadways | page text | p19 |
| Linear - Culverts - Concrete | 75 | Storm sewer | page text | p19 |
| Linear - Culverts - Corrugated Steel | 25–40 | Storm sewer | page text | p19 |
| Linear - Culverts - HDPE / PVC | 50–80 | Storm sewer | page text | p19 |
| Linear - Stormwater Facility | 40 | Storm sewer | page text | p19 |
| Linear - Sidewalk - Concrete | 50 | Sidewalks and walkways | page text | p19 |
| Linear - Sidewalk - Paving Stone | 20 | Sidewalks and walkways | page text | p19 |
| Linear - Road Base - Asphalt - Curb | 80 | Roadways | page text | p19 |
| Linear - Road Base - Asphalt - Ditch | 50 | Storm sewer | page text | p19 |
| Linear - Road Base - Surface Treatment | 50 | Roadways | page text | p19 |
| Linear - Road Base - Gravel | 50 | Roadways | page text | p19 |
| Linear - Pipe - PVC | 50–80 | — | page text | p19 |
| Linear - Pipe - Concrete | 50–75 | — | page text | p19 |
| Linear - Pipe - HDPE | 50–80 | — | page text | p19 |
| Linear - Pipe - PE | 50–80 | — | page text | p19 |
| Linear - Pipe - DI | 50 | — | page text | p19 |
| Linear - Pipe - Copper | 50 | — | page text | p19 |
| Linear - Valves - Pressure Release | 50 | Water supply | page text | p19 |
| Linear - Valves - Globe | 50 | Water supply | page text | p19 |
| Linear - Valves - Gate | 25 | Water supply | page text | p19 |
| Linear - Valves - Air Release | 25 | Water supply | page text | p19 |
| Linear - Valves - Power Actuated | 20–30 | Water supply | page text | p19 |
| Linear - Valves - Valve Chamber | 50–80 | Water supply | page text | p19 |
| Linear - Valves - Maintenance Hatch | 50–80 | Water supply | page text | p19 |
| Linear - Fire Hydrant | 50–60 | Water supply | page text | p19 |
| Linear - Road Surface - Asphalt - Curb | 30 | Roadways | page text | p20 |
| Linear - Road Surface - Asphalt - Ditch | 25 | Storm sewer | page text | p20 |
| Linear - Road Surface - Surface Treatment | 3–7 | Roadways | page text | p20 |
| Linear - Streetlight Luminaires | 30 | Site lighting | page text | p20 |
| Linear - Streetlight Poles | 50 | Site lighting | page text | p20 |
| Linear - Traffic Signals | 25 | Traffic signals and other site electrical | page text | p20 |
Municipality of Meaford Asset Management Plan - Core Assets (Appendix 1 to Report CAO2022-28)
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Rural/Semi-Urban - Asphalt Surface | 25 | Roadways | page text | p39 |
| Rural/Semi-Urban - Asphalt Base | 50 | Roadways | page text | p40 |
| Rural - LCB Surface | 7 | Roadways | page text | p40 |
| Rural - LCB Base | 50 | Roadways | page text | p40 |
| Urban – Asphalt Surface | 30 | Roadways | page text | p40 |
| Urban – Asphalt Base | 80 | Roadways | page text | p40 |
| Culverts - Concrete | 75 | Storm sewer | page text | p79 |
| Culverts - Steel <3m | 60 | Storm sewer | page text | p79 |
| Bridge | 75 | Roadways | page text | p79 |
| Stormwater Collection Main | 80 | Storm sewer | page text | p111 |
| Local Main | 80 | Water supply | page text | p135 |
| Transmission Main | 80 | Water supply | page text | p135 |
| Storage (Water Tower) | 75 | Water supply | page text | p135 |
| Water Booster Pumping Station | 75 | Water supply | page text | p135 |
| Water Treatment Plant | 75 | Water supply | page text | p135 |
| Force main | 80 | Sanitary sewer | page text | p165 |
| Local Sewer | 80 | Sanitary sewer | page text | p165 |
| Trunk Sewer | 80 | Sanitary sewer | page text | p165 |
| Sanitary Pumping Station | 75 | Sanitary sewer | page text | p166 |
| Wastewater Treatment Plant | 75 | Sanitary sewer | page text | p166 |