32 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.

Oxford County Asset Management Plan 2025

As writtenYearsSystemChecked againstPage
Woodstock wastewater - Sanitary Main (>=450mm)90Sanitary sewerpage textp31
Woodstock wastewater - Sanitary Main (<450mm)90Sanitary sewerpage textp31
Woodstock wastewater - Sanitary Service Connection90Sanitary sewerpage textp31
Mount Elgin wastewater - Collection Tanks30Sanitary sewerpage textp168
Woodstock water - Watermain (<416mm)90Water supplypage textp221
Woodstock water - Watermain (>=416mm)90Water supplypage textp221
Woodstock water - Water Service Connection90Water supplypage textp221
Woodstock water - Hydrant40Water supplypage textp221
Woodstock water - Valve40Water supplypage textp221
Woodstock water - Water Meter20Water supplypage textp221
Bridges60Roadwayspage textp292
Structural Culverts50–65Storm sewerpage textp292
Guide Rails (bridges and structural culverts)30Roadwayspage textp292
Arterial Road25Roadwayspage textp307
Collector Road25Roadwayspage textp307
Local Road25Roadwayspage textp307
Retaining Wall50Roadwayspage textp307
Guide Rails30Roadwayspage textp307
Pedestrian Crossover30Roadwayspage textp307
Traffic Signals30Traffic signals and other site electricalpage textp307
Beacon30Roadwayspage textp307
Street Light30Site lightingpage textp307
Trails30–40—page textp307
Catchbasins90Storm sewerpage textp326
Catchbasin Lead90Storm sewerpage textp326
Culverts <3m50–90Storm sewerpage textp326
Storm Lateral90Storm sewerpage textp326
Storm Main90Storm sewerpage textp326
Corporate Facilities - Renewable Energy25—page textp339
Corporate Facilities - COIN Towers50—page textp339
Waste Management - Leachate Collection System70—page textp385
Community Housing - Renewable Energy25—page textp402