Oxford County Asset Management Plan 2025 · 2025
Asset management plan
Stated lives
32 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
Oxford County Asset Management Plan 2025
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Woodstock wastewater - Sanitary Main (>=450mm) | 90 | Sanitary sewer | page text | p31 |
| Woodstock wastewater - Sanitary Main (<450mm) | 90 | Sanitary sewer | page text | p31 |
| Woodstock wastewater - Sanitary Service Connection | 90 | Sanitary sewer | page text | p31 |
| Mount Elgin wastewater - Collection Tanks | 30 | Sanitary sewer | page text | p168 |
| Woodstock water - Watermain (<416mm) | 90 | Water supply | page text | p221 |
| Woodstock water - Watermain (>=416mm) | 90 | Water supply | page text | p221 |
| Woodstock water - Water Service Connection | 90 | Water supply | page text | p221 |
| Woodstock water - Hydrant | 40 | Water supply | page text | p221 |
| Woodstock water - Valve | 40 | Water supply | page text | p221 |
| Woodstock water - Water Meter | 20 | Water supply | page text | p221 |
| Bridges | 60 | Roadways | page text | p292 |
| Structural Culverts | 50–65 | Storm sewer | page text | p292 |
| Guide Rails (bridges and structural culverts) | 30 | Roadways | page text | p292 |
| Arterial Road | 25 | Roadways | page text | p307 |
| Collector Road | 25 | Roadways | page text | p307 |
| Local Road | 25 | Roadways | page text | p307 |
| Retaining Wall | 50 | Roadways | page text | p307 |
| Guide Rails | 30 | Roadways | page text | p307 |
| Pedestrian Crossover | 30 | Roadways | page text | p307 |
| Traffic Signals | 30 | Traffic signals and other site electrical | page text | p307 |
| Beacon | 30 | Roadways | page text | p307 |
| Street Light | 30 | Site lighting | page text | p307 |
| Trails | 30–40 | — | page text | p307 |
| Catchbasins | 90 | Storm sewer | page text | p326 |
| Catchbasin Lead | 90 | Storm sewer | page text | p326 |
| Culverts <3m | 50–90 | Storm sewer | page text | p326 |
| Storm Lateral | 90 | Storm sewer | page text | p326 |
| Storm Main | 90 | Storm sewer | page text | p326 |
| Corporate Facilities - Renewable Energy | 25 | — | page text | p339 |
| Corporate Facilities - COIN Towers | 50 | — | page text | p339 |
| Waste Management - Leachate Collection System | 70 | — | page text | p385 |
| Community Housing - Renewable Energy | 25 | — | page text | p402 |