Ontario · Upper-tier municipality · population 97,286 (2021)
Wellington
Documents
County of Wellington 2025 Asset Management Plan · 2025
Asset management plan
Stated lives
14 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
County of Wellington 2025 Asset Management Plan
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Bridges and Culverts (Concrete) - EUL with no intervention or lifecycle events | 60 | Roadways | page text | p51 |
| Bridges and Culverts (Concrete) - EUL with County maintenance lifecycle events | 84.08 | Roadways | page image | p51 |
| Bridges and Culverts (Steel, CSP Arch) - EUL with no intervention or lifecycle events | 50 | Roadways | page text | p51 |
| Bridges and Culverts (Steel, CSP Arch) - EUL with County maintenance lifecycle events | 73 | Roadways | page text | p51 |
| Roads - With no intervention or lifecycle events | 25 | Roadways | page text | p95 |
| Roads - With County capital lifecycle events | 33.75 | Roadways | page image | p95 |
| Retaining Walls - Concrete (including Armour Stone, Gabion Wall, and Masonry) | 75 | Roadways | page text | p117 |
| Retaining Walls - Wood | 40 | Roadways | page text | p117 |
| Traffic Signals | 35 | Traffic signals and other site electrical | page text | p118 |
| Stormwater Pipes - Concrete, polyvinyl chloride (PVC), high-density polyethylene (HDPE) | 100 | Storm sewer | page text | p133 |
| Stormwater Pipes - Corrugated steel pipe (CSP), Clay | 40 | Storm sewer | page text | p133 |
| Stormwater Pipes - No material data available | 75 | Storm sewer | page text | p133 |
| Stormwater Structures - Concrete (catch basins, manholes) | 100 | Storm sewer | page text | p133 |
| Building structure (facilities) | 50 | Superstructure | page text | p75 |