Ontario · Single-tier municipality · population 2,794,356 (2021)
Toronto
Documents
City of Toronto 2025 Corporate Asset Management Plan · 2025
Asset management plan · Read by hand on 2026-10-21 (all 395 pages searched for life values). No component lives. Each service area has an inventory table with Average Age and Average ESL by asset class, weighted by replacement value; for buildings these are whole-building figures, e.g. Corporate Real Estate facilities ESL 50 (p165), Library Branches 50 (p117), Subsidized Housing 32 (p204), Heritage Buildings 265 (p108).
Stated lives
10 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
City of Toronto 2025 Corporate Asset Management Plan
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Structures - Bridge Infrastructure | 70 | Roadways | page text | p294 |
| Linear Infrastructure (Expressways - Highway 2A & William R Allen Rd) | 75 | Roadways | page text | p294 |
| Linear Infrastructure (Minor & Major Arterial Roads) | 75 | Roadways | page text | p295 |
| Linear Infrastructure (Local & Collector Roads) | 100 | Roadways | page text | p295 |
| Linear Infrastructure (Laneways) | 100 | Roadways | page text | p295 |
| Point Infrastructure (Pedestrian Scale Lighting) | 20 | Site lighting | page text | p295 |
| Point Infrastructure (Traffic Signals) | 28 | Traffic signals and other site electrical | page text | p295 |
| Conveyance - Linear Infrastructure (Transmission & Distribution) | 50–100 | Water supply | page text | p355 |
| Conveyance - Linear Infrastructure (Forcemains, Trunk & Local Sewers) | 50–150 | Sanitary sewer | page text | p366 |
| Conveyance - Linear Infrastructure (Local & Trunk Sewers) | 50–150 | Storm sewer | page text | p379 |