Ontario · Upper-tier municipality · population 1,173,103 (2021)
York
Documents
The Regional Municipality of York 2024 Corporate Asset Management Plan · 2024
Asset management plan · Read by hand on 2026-10-21 (all 143 pages searched for life values). No building component lives. The only facility lives are transit total-life replacement figures on p67: garage structures 50, terminals 50, garage equipment 5 to 25, transit stop platforms 10 to 15, transit stop shelters 15 years.
Stated lives
9 rows, each as written in the document and linked to its page. Policies give accounting lives (amortization periods); plans give planning lives. Neither is a measured replacement age.
The Regional Municipality of York 2024 Corporate Asset Management Plan
| As written | Years | System | Checked against | Page |
|---|---|---|---|---|
| Bridges: Replacement | 75 | Roadways | page text | p53 |
| Concrete culverts: Replacement | 75 | Storm sewer | page text | p53 |
| Corrugated steel pipe culverts: Replacement | 35 | Storm sewer | page text | p53 |
| Storm pipe replacement | 35–75 | Storm sewer | page text | p53 |
| Outfall replacement | 35–75 | Storm sewer | page text | p53 |
| Maintenance hole replacement | 60 | Storm sewer | page text | p53 |
| Catch basin and ditch inlet replacement | 60 | Storm sewer | page text | p53 |
| Oil grit separator replacement | 50 | Storm sewer | page text | p53 |
| Culverts under three metres: Replacement or relining | 35–75 | Storm sewer | page text | p53 |